Page 1: OMOBILE   Examples

Examples

OMOBILE11/2010

Page 2: OMOBILE   Examples

2

To treat contact water that has been polluted by contact with the ore before discharge into the natural environment in order to comply with environmental regulations

A complete mobile installation set up, comprising sand filtration, decarbonation and reverse osmosis, for a flow rate of 300 m3/h. Continued authorisation to operate the mine from the environmental authorities.

Long term rentalMines, Spain

Challenge

Solution

Example

Page 3: OMOBILE   Examples

3

Chemical industry, Belgium

To ensure continuity of production in the event of breakdown of an ageing demineralisation facility.

An O'Ready audit carried out, and the system operational just 2 hours after the customer's phone call, following a breakdown on the facility.

Challenge

Solution

Emergency

Example

Page 4: OMOBILE   Examples

4

Energy industry, France

To treat water polluted by nitrates in a lagoon threatening to overflow due to heavy rainfall.

Installation of a reverse osmosis unit in a few hours, to treat the water in the lagoon before discharge into the natural environment.

Challenge

Solution

Emergency

Example

Page 5: OMOBILE   Examples

5

Petrochemical industry, Belgium

To ensure continuity of production of the petrochemical site despite the sudden failure of the permanent demineralisation facility.

Installation of 3 reverse osmosis units and mixed beds in just 6 hours, for a flow rate of 150 m3/h. No break in production at the petrochemical site.

Challenge

Solution

Emergency

Example

Page 6: OMOBILE   Examples

6

Energy industry, Belgium

To protect the equipment in the power station boiler despite degradation of the raw water quality before demineralisation.

Installation of a reverse osmosis unit between the permanent demineralisation facility and the boiler to reduce the TOC. Equipment protected.

Challenge

Solution

Scheduled operations

Example

Page 7: OMOBILE   Examples

7

Solution

To reduce the operating costs of a resin demineralisation chain.

Testing of a double-pass reverse osmosis unit at the demineralisation input with 20 to 40-fold reduction in the purchases of chemicals and decreased risk of accidents.

Challenge

Energy industry, FranceScheduled operations

Example

Page 8: OMOBILE   Examples

8

Energy industry, EgyptScheduled operations

To provide 30,000 m3 of demineralised water in 4 weeks for the start-up of a new power station.

Installation of a double-pass reverse osmosis unit preceded by a sand filtration system for producing the required quality and quantity of pure water.

Challenge

Solution

Example

Page 9: OMOBILE   Examples

9

Chemical industry, ChinaScheduled operations

To supply pure water to an industrial park in China while awaiting delivery of its permanent demineralisation unit.

Installation of a reverse osmosis unit followed by a fractal resin demineralisation unit (90 m3/h, conductivity <0.2 µS/cm) in series. Training local operators and monitoring the units using remote management.

Challenge

Solution

Example

Page 10: OMOBILE   Examples

10

Petrochemical industry, BelgiumScheduled operations

To carry out heavy maintenance work on the permanent demineralisation chain without halting production.

Installation of a sand filtration system, then a single-pass reverse osmosis system and mixed beds in series, for a flow rate of 100 m3/h during the 6-week maintenance period. Compliance with the maintenance schedule with no loss of production.

Challenge

Solution

Example

Page 11: OMOBILE   Examples

List of