Energizing the Waste: Baku Waste to Energy PlanPresenter : Oktay Mammadov, Head of Project Management and PR Department, «Tamiz Shahar» JSC Event: Asia Clean Energy Forum 2012 Date: June 4-8, 2012 Venue: Manila, Philippines«Tamiz Shahar» Joint Stock Company
10
Embed
Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan
The realization costs can exceed the anticipated budgetThe realization time can exceed the anticipated scheduleThe O&M costs might exceed the ones that have beenassumedThe performances might not be at the expected levelThe quality of the equipment or the O&M performances mightcause lack of availabilityThe quantity or the quality of the wastes might not be asexpected
The project risks should be allocated to the parties who arethe most suitable to face and to manage them and this througha proper and fair contractual structure
The appropriate risks allocation with the relevant contractualconditions are essential for reducing the total costs and for anefficient delivery
7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan