BS INTERIOR DESIGN OJT REPORTDaily Log of Training Experience
Date: APRIL 27 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZALProject Title: LICHUACO RESIDENCE Project Description:
Project Location: #23 LEO ST., BEL AIR ,MAKATI CITY
Assigned Work Task: FABRIC OPTION Office Site Others, pls. specify
Time In : 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent: 8 HRS.
Weather Condition: SUNNY Site Condition:
Work Activities Performed:
- FABRIC OPTIONS FOR DEN, FAMILY ROOM, AND BETTINA LICHUACO BEDROOMOPTION 1 AND 2
- MACQUERA RESIDENCE @ UNIT 2918 ONE ROCKWELL, MAKATI CITY,
CHECKING THE FINAL LIQUIDATION
- FIXING THE PAINT LIBRARY
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
2/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 2 of 2
Report/s Submitted, if any:
Lesson/s Learned:
- I LEARN TO GIVE MORE OPTIONS FOR A CERTAIN SPACE THAT NOT ESCAPINGTO THE MAJOR SCHEME.
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: APRIL 27 , 2012 Date: ________________, 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
3/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 3 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, Manila
Tel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORT
Daily Log of Training Experience
Date: APRIL 28 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL
Project Title : JAMES CHUA UNIT Project Description:
Project Location: UNIT 3507, ONE ROCKWELL, WEST TOWER, MAKATI CITY
Assigned Work Task: ID SOURCING Office Site Others, pls. specify
Time In : 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent: 8 HRS.
Weather Condition: SUNNY Site Condition:
Work Activities Performed:
- ID SOURCING FOR REFRIGERATOR ELECTROLUX BRAND
- UPDATING THE FURNITURE LIBRARY
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
4/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 4 of 2
Report/s Submitted, if any:
Lesson/s Learned:
- I LEARN WHAT IS ID SOURCING, IT IS GIVING THE CLIENT A PRODUCT THAT HASGOOD QUALITY IN CHEAPER PRICE.
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: APRIL 28 , 2012 Date: ________________ , 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
5/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 5 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORT
Daily Log of Training Experience
Date: APRIL 30 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL
Project Title: LAHOZ RESIDENCE Project Description:
Project Location: UNIT 3410 ONE ROCKWELL WEST TOWER, MAKATI CITY
Assigned Work Task: FABRIC OPTIONS Office Site Others, pls. specify
Time In : 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent: 8 HRS.
Weather Condition: SUNNY Site Condition:
Work Activities Performed:
- FABRIC OPTION TO THE GIRLS BEDROOM SCHEME
- THE GROVE BY ROCKWELL AMENITY 5TH AND 6TH FLOOR, E. RODRIGUEZ AVE. ,C-5 ROAD, BRGY. UGONG, PASIG CITY
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
6/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 6 of 2
Report/s Submitted, if any:
Lesson/s Learned:
- I LEARN TO GIVE OPTION OF SCHEMES FOR A GIRL'S BEDROOM
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: ____APRIL 30 , 2012 Date: ________________ , 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
7/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 7 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORT
Daily Log of Training Experience
Date: MAY 2 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL
Project Title: EDADES TOWERS AND GARDEN VILLAS Project Description:
Project Location: ROCKWELL CENTER, MAKATI CITY
Assigned Work Task: Office Site Others, pls. specify
Time In : 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent:
Weather Condition: SUNNY Site Condition:
Work Activities Performed:
- PREPARING THE CONTRACT DRAWING FOR BLUEPRINTING
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
8/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 8 of 2
Report/s Submitted, if any:
Lesson/s Learned:
- I LEARN HOW PROFESSIONALS MAKE THEIR DOCUMENTS.
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: MAY 2 , 2012 Date: ________________ , 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
9/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 9 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORTDaily Log of Training Experience
Date: MAY 3 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZALProject Title: JAMES CHUA Project Description:
Project Location: UNIT 3507, ONE ROCKWELL WEST TOWER, MAKATI CITY
Assigned Work Task: Office Site Others, pls. specify
Time In : 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent: 8 HRS.
Weather Condition: SUNNY Site Condition:
Work Activities Performed:
- ID SOURCING SAMSUNG LED/LCD TV
- CONTINUATION OF EDADES TOWERS AND GARDEN VILLAS
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
10/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 10 of 2
Report/s Submitted, if any:
Lesson/s Learned:
- I LEARN MORE ABOUT ID SOURCING
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: MAY 3 , 2012 Date: ________________ , 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
11/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 11 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORT
Daily Log of Training Experience
Date: MAY 4 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL
Project Title: CITADINES SALCEDO MAKATI Project Description:
Project Location: SALCEDO, MAKATI CITY
Assigned Work Task: SWATCH BRDS. Office Site Others, pls. specify
Time In : 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent: 8 HRS.
Weather Condition: SUNNY Site Condition:
Work Activities Performed:
- HELP IN PREPARING THE SWTCH BRDS.
- TANSIPEK RESIDENCE@ 146, SWALLOW DRIVE, GREEN MEADOWS,QC
PAINT FINISH SPECS.
- CONTINUATION OF EDADES TOWERS AND GARDEN VILLAS
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
12/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 12 of 2
Report/s Submitted, if any:
Lesson/s Learned:
- I LEARN TO MAKE SWATCH BOARD THE ID WAY FOR CLIENT PRESENTATION
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: MAY 4 , 2012 Date: ________________ , 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
13/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 13 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORTDaily Log of Training Experience
Date: MAY 7 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZALProject Title: THE GROVE Project Description:
Project Location: PASIG CITY
Assigned Work Task:FABRIC OPTIONS Office Site Others, pls. specify
Time In : 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent: 8 HRS.
Weather Condition: SUNNY Site Condition:
Work Activities Performed:
- FABRIC OPTIONS FOR SEATING COVER
- MARKING THE AREA FOR WALL PAPERING
- VALERO ID SOURCING TV LED/LCD
- EDADES TOWERS AND GADEN VILLAS CONTINUATION FOR SUBMISSION
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
14/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 14 of 2
Report/s Submitted, if any:
Lesson/s Learned:
- I LEARN TO GIVE OPTION TO THE GIVEN SPECIFICATION
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: MAY 7 , 2012 Date: ________________ , 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
15/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 15 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORT
Daily Log of Training Experience
Date: MAY 8 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL
Project Title: JAMES CHUA Project Description:
Project Location: UNIT 3507 ONE ROCKWELL WEST TOWER, MAKATI CITY
Assigned Work Task: ID SOURCING Office Site Others, pls. specify
Time In : 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent: 8 HRS.
Weather Condition: SUNNY Site Condition:
Work Activities Performed:
- ID SOURCING FOR HEAVY DRAPERY AND SHEER CURTAIN
- THE GROVE PURCHASE REQUISITION
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
16/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 16 of 2
Report/s Submitted, if any:
Lesson/s Learned:
- I LEARN TO GIVE OPTION TO THE GIVEN SPECIFICATION
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: MAY 8 , 2012 Date: ________________ , 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
17/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 17 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORT
Daily Log of Training Experience
Date: MAY 9 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL
Project Title: CITADINES Project Description:
Project Location: SALCEDO , MAKATI CITY
Assigned Work Task: FABRICS Office Site Others, pls. specify
Time In : 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent: 8 HRS
Weather Condition: SUNNY Site Condition:
Work Activities Performed:
- FABRIC SWATCHES OFFICE FILLING
- THE GROVE CONTRACT DOCUMENT DOING THE COPY FOR OFFICE
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
18/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 18 of 2
Report/s Submitted, if any:
Lesson/s Learned:
- I LEARN HOW PROFESSIONAL MAKE THEIR DOCUMENTS
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: MAY 9 , 2012 Date: ________________ , 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
19/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 19 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORTDaily Log of Training Experience
Date: MAY 10 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZALProject Title: JAMES CHUA Project Description:
Project Location: UNIT 3507 ONE ROCKWELL WEST TOWER, MAKATI CITY
Assigned Work Task: SWATCH BOARDS Office Site Others, pls. specify
Time In : 9;00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent: 8 HRS
Weather Condition: RAINY Site Condition:
Work Activities Performed:
JAMES CHUA @ UNIT 3507 ONE ROCKWELL WEST TOWER, MAKATI CITY
- ID SOURCING REFRIGERATOR G.E.
PROPOSED RESIDENCE & GALLERY @ 44 BALETE DRIVE NEW MANILA QUEZON CITY
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
20/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 20 of 2
Report/s Submitted, if any:
Lesson/s Learned:
- I LEARN TO GIVE QUALITY WORK
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: MAY 10 , 2012 Date: ________________ , 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
21/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 21 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORT
Daily Log of Training Experience
Date: MAY 11 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL
Project Title: EVARISTO RESIDENCES Project Description:
Project Location: UNIT 709, ONE ROCKWELL WEST TOWER, MAKATI CITY
Assigned Work Task: ENCODING Office Site Others, pls. specify
Time In : 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent: 8 HRS
Weather Condition: SUNNY Site Condition:
Work Activities Performed:
ENCODING THE DESK @ BEDROOM
MARY PO RESIDENCE @ CORITHIAN GAREDEN, QUEZON CITY
- ENCODING THE MASTER BEDROOM TV CABINET @ GROUND AND SECONDFLOOR
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
22/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 22 of 2
Report/s Submitted, if any:
Lesson/s Learned:
I LEARN TO USE GOOGLE SKETCH UP PROPERLY
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: _____MAY 11___________, 2012 Date: ________________ , 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
23/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 23 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORTDaily Log of Training Experience
Date: MAY 14 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL
Project Title: MARK LOPEZ Project Description:
Project Location: UNIT 3916, ONE ROCKWELL WEST TOWER, MAKATI CITY
Assigned Work Task: SITE VISIT Office Site Others, pls. specify
Time In 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent:
Weather Condition: RAINY Site Condition:
Work Activities Performed:
- ASSISTING THE WORKERS IN INSTALLING THE KNOCK DOWN FURNITURES
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
24/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 24 of 2
Report/s Submitted, if any:
Lesson/s Learned:
I LEARN TO OBSERVE (CRITICALLY) TO MAKE QALITY WORK.
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: _____MAY 14 ___________ , 2012 Date: ________________ , 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
25/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 25 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304
BS INTERIOR DESIGN OJT REPORTDaily Log of Training Experience
Date: MAY 15 , 2012
Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name
Office/Company Name: ERFE AND ASSOCIATES
Address: RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZALProject Title: MARK LOPEZ Project Description: CONDO UNIT
Project Location: UNIT 3916, ONE REOCKWELL WEST TOWER, MAKATI CITY
Assigned Work Task: SITE VISIT Office Site Others, pls. specify
Time In : 9:00 AM
Time Out : 6:00 PM Total No. of Hour/s Spent: 8 HRS.
Weather Condition: SUNNY Site Condition:
Work Activities Performed:
- ASSISTING THE WORKER IN INSTALLING THE KNOCK-DOWN FURNITURES
Personal Observations at the Project Site:
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
26/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 26 of 2
Report/s Submitted, if any:
Lesson/s Learned:
I LEARN TO DO HOTEL FOLD IN MATTRESSES.
Picture/s Taken, if any:
Certified True and Correct by: Noted by:
Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator
Date: MAY 15 , 2012 Date: ________________, 2012
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
27/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 27 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGN
PUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, Manila
Tel: (632) 713 9304
BS Interior Design On-the-Job Training
ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT
Name of Student: MARTER, MARK BONI RAMOS
Family Name, First Name MiddleName
Student No. 2009-05309-MN-0 Employed by: ERFE AND ASSOCIATES
Address: RM. 204& 206, J&FII BLDG., V.V. SOLIVEN, CAINTA,RIZAL
Reporting Period from: 27 APRIL 2012 to 28 APRIL 2012Day Month Day Month
ItemNo.
Project Title/Description/LocationField of Practice
(Brief Description)No. ofHours
Percentage ofAssigned Work
Completed
100% = FullCompletion
1 LICHUACO RESIDCENCE FABRIC OPTIONS FORGIVEN SPACES
4HRS. 100%
2 MACQUERA RESIDENCE CHECKING THE FINALLIQUIDATION
2 HRS. 100%
3 OFFICE PAINT LIBRARY PREPARING PAINTSWATCHES
2 HRS. 100%
4 JAMES CHUA UNIT ID SOURCING 3 HRS. 100%
5 OFFICE FURNITURE LIBRARY UPDATING 5 HRS. 100%
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
28/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 28 of 2
ItemNo.
Project Title/Description/LocationField of Practice
(Brief Description)No. ofHours
Percentage ofAssigned Work
Completed
100% = FullCompletion
TOTAL NO. OF HOURS 16 HRS. 100%
Recommendations for the Trainees further growth and development:
Checked and Approved by: Conforme:
OJT Faculty Coordinator Student Trainee(Signature above printed name) (Signature above printed name)
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
29/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 29 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGN
PUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, Manila
Tel: (632) 713 9304
BS Interior Design On-the-Job TrainingON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT
Name of Student: MARTER, MARK BONI RAMOS
Family Name, First Name MiddleName
Student No. 2009-05309-MN-0 Employed by: ERFE AND ASSOCIATES
Address: RM. 204& 206, J&FII BLDG., V.V. SOLIVEN, CAINTA,RIZAL ReportingPeriod from: 30 APRIL 2012 to 4 MAY 2012Day Month Day Month
ItemNo.
Project Title/Description/LocationField of Practice
(Brief Description)No. ofHours
Percentage ofAssigned Work
Completed
100% = FullCompletion
1 LAHOZ RESIDENCE FABRIC OPTIONS 5 HRS. 100%
2 THE GROVE BY ROCKWELL FABRIC OPTIONS 3 HRS. 100%
3 EDADES TOWER AND GARDEN
VILLAS
PREPARING THE
CONTRACT DRAWINGS
14 HRS 100%
4 JAMES CHUA ID SOURCING 3 HRS. 100%
5 CITADINES SALCEDO 5 HRS. 95%
6 TANSIPEK RESIDENCE PAINT SWATCH 2 HRS. 98%
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
30/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 30 of 2
ItemNo.
Project Title/Description/LocationField of Practice
(Brief Description)No. ofHours
Percentage ofAssigned Work
Completed
100% = FullCompletion
TOTAL NO. OF HOURS 32 HRS. 98. 83%
Recommendations for the Trainees further growth and development:
Checked and Approved by: Conforme:
OJT Faculty Coordinator Student Trainee(Signature above printed name) (Signature above printed name)
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
31/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 31 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGN
PUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, Manila
Tel: (632) 713 9304
BS Interior Design On-the-Job Training
ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT
Name of Student: MARTER, MARK BONI RAMOS
Family Name, First Name MiddleName
Student No. 2009-05309-MN-0 Employed by: ERFE AND ASSOCIATES
Address: RM. 204& 206, J&FII BLDG., V.V. SOLIVEN, CAINTA,RIZAL
Reporting Period from: 7 MAY 2012 to 11 MAY 2012Day Month Day Month
ItemNo.
Project Title/Description/LocationField of Practice
(Brief Description)No. ofHours
Percentage ofAssigned Work
Completed
100% = FullCompletion
1 THE GROVE MAKATI TOWERS MARKINGWALLPAPERING
2HRS. 100%
2 VALERO ID SOURCING 3HRS. 100%
3 JAMES CHUA UNIT ID SOURCING 100%
4 CITADINES SALCEDO FABRIC SWATCHING 8HRS. 95%
5 PROPOSED RESIDENCE ANDGALLERY
PREPARING THECONTRACT DRAWINGS
5HRS 98%
6 EVARISTO RESIDENCE ENCODING/SKETCHUP 3HRS. 98%
7 MARY PO RESIDENCE ENCODING/SKETCHUP 4HRS 95%
8 OFFICE FABRIC LIBRARY PREPARINGSWATCHES
6HRS. 100%
9 THE GROVE PURCHASEREQUISITION
5HRS. 100%
FABRIC OPTIONS 4HRS 100%
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
32/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 32 of 2
ItemNo.
Project Title/Description/LocationField of Practice
(Brief Description)No. ofHours
Percentage ofAssigned Work
Completed
100% = FullCompletion
TOTAL NO. OF HOURS 40 HRS. 98.6%
Recommendations for the Trainees further growth and development:
Checked and Approved by: Conforme:
OJT Faculty Coordinator Student Trainee(Signature above printed name) (Signature above printed name)
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
33/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 33 of 2
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ARCHITECTURE AND FINE ARTS
DEPARTMENT OF INTERIOR DESIGN
PUP Engineering and Architecture BuildingNDC Compound,
Anonas cor. Pureza Sts., Sta. Mesa, Manila
Tel: (632) 713 9304
BS Interior Design On-the-Job Training
ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT
Name of Student: MARTER, MARK BONI RAMOS
Family Name, First Name MiddleName
Student No. 2009-05309-MN-0 Employed by: ERFE AND ASSOCIATES
Address: RM. 204& 206, J&FII BLDG., V.V. SOLIVEN, CAINTA,RIZAL
Reporting Period from: 14 MAY 2012 to 15 MAY 2012Day Month Day Month
ItemNo.
Project Title/Description/LocationField of Practice
(Brief Description)No. ofHours
Percentage ofAssigned Work
Completed
100% = FullCompletion
1 MARK LOPEZ UNIT SITE VISIT 16HRS. 100%
7/31/2019 Ojt Daily Log Erfe 1-13 and Weekly Logs 1-4
34/35
PUP-CAFA BS Interior DesignOJT Summer 2012
OJT Daily Log Page 34 of 2
ItemNo.
Project Title/Description/LocationField of Practice
(Brief Description)No. ofHours
Percentage ofAssigned Work
Completed
100% = FullCompletion
TOTAL NO. OF HOURS 16HRS. 100%
Recommendations for the Trainees further growth and development:
Checked and Approved by: Conforme:
OJT Faculty Coordinator Student Trainee(Signature above printed name) (Signature above printed name)