Top Banner
ACES 2012 December 12, 2012 Ohio River Basin Water Quality Trading Project
13

Ohio River Basin Water Quality Trading Project · 2012. 12. 11. · ACES 2012 December 12, 2012 Ohio River Basin Water Quality Trading Project

Jan 28, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • ACES 2012

    December 12, 2012

    Ohio River Basin

    Water Quality Trading Project

  • 2 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    The Trading Plan is Signed!

    August 9th, 2012 in Cincinnati Ohio

    June 22: A nutrient pollution article in The Economist mentions EPRI's Water Quality

    Trading Program.

    http://www.economist.com/node/21557365?fsrc=rss|ust

  • 3 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    Clean Water Act

    – Water Quality

    Standards

    – Monitoring

    – Assessment

    • 301

    • 303(d)

    • TMDLs

    – NPDES Permits

    • CAFOs

    • Wastewater

    – WQT • Stormwater

    – COE wetland

    banking

    – Section 319 & 208

    USDA Farm Bill

    – NRCS – FSA – Fish & Wildlife – Forest Service – EQIP

    – CIG – WRP – CRP – CREP – Swamp Buster – Technical assistance

    Non-governmental

    – State and County

    rules:

    • Landuse

    • Districts

    • Cost share

    • Septic systems

    • Erosion

    ordinances

    • Drainage

    authorities

    – NGOs

    • Implementation

    • Land retirement

    • Education

    • Challenges

    WQT in Context…

  • 4 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    Nutrient Criteria are Coming

    • Currently, point sources are in compliance with NPDES

    permit limits for TN and TP.

    • Anticipate more stringent nutrient criteria for P and N.

    • Want to test trading program ahead of regulatory need.

    The EPA and many states

    concerned over nutrient

    impaired water bodies

    such as the Gulf of Mexico

  • 5 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    ORB WQT Stakeholder Engagement

    Organizations: Electric Power Research Institute

    American Farmland Trust

    Ohio Farm Bureau Federation

    ORSANCO

    Tennessee Valley Authority

    American Electric Power

    Hoosier Energy

    Duke Energy

    Hunton & Williams

    Kieser & Associates

    UC Santa Barbara

    Markit Environmental

    States: Ohio

    Indiana

    Kentucky

    Agencies: USEPA

    USDA

    Steering Committees: WWTP

    Agriculture

    Power Plants

    Environmental Groups

  • 6 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    ORB WQT Project Objectives & Approach

    Overall Objective:

    Demonstrate how WQT can be

    used for cost-effective permit

    compliance and provide

    ecological co-benefits.

    Pilot Study Objectives

    – Collaboration

    – Strong Science

    – Defensible Rules

    – Address Key WQT Issues

    – Ancillary Benefits (ex.,

    Ecosystem Services, Social)

    Approach:

    Test case: Reduce overall

    loading of nutrients within the

    Ohio River Basin using water

    quality trading.

    Driver:

    Coal-fired power plants release

    nutrients and are facing more

    stringent nutrient NPDES permit

    limits.

  • 7 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    Pilot Trades (2012-2015)

    30 farmer contracts

    45,000-60,000 lbs N/yr

    15,000-20,000 lb P/yr

    Focus on KY, IN, OH

  • 8 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    Details of Pilot Program

    • Location of Pilot Trades

    • Overall Credit Process

    • Watershed Model

    • Agricultural Baselines

    • Reserve/Insurance Pool

    • Incentives for Early Buyers

    • Adaptive Management

    Pilot Program Plan can be downloaded at:

    www.epri.com/ohiorivertrading

  • 9 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    Watershed Model

  • 10 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    Credit Trading Registry

  • 11 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    Credit Stacking

    Jessica Fox, Royal Gardner, Todd Maki.

    Feb 2011. Environmental Law Reporter.

    EPRI-MSU N2O Offsets Protocol

    -- "Quantifying N2O Emissions

    Reductions in US Agricultural

    Crops through N Fertilizer

    Rate Reduction”

    Focus on stacking water

    quality and GHG credits

    associated with reduced

    fertilizer use on farms.

  • 12 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    Project Schedule

    Pro

    ject Id

    en

    tificatio

    n

    Co

    llab

    ora

    tion

    Fo

    rmed

    Pilo

    t Tra

    des

    Pro

    gra

    m F

    ram

    ew

    ork

    Tra

    nsitio

    n to

    Lo

    ng

    -term

    pro

    gra

    m

    Ag

    en

    cy fu

    nd

    ing

    2007 Oct. 2009 2010 2011 2015

    Le

    sso

    n L

    earn

    ed

    2012 2014 S

    teerin

    g C

    om

    mitte

    es

    2008

    •Signed Trading Plan – August 9, 2012

    •BMPs: Begin in Spring 2013

  • 13 © 2012 Electric Power Research Institute, Inc. All rights reserved.

    Contacts & Questions

    Jessica Fox

    [email protected]

    650-855-2138

    www.epri.com/ohiorivertrading

    mailto:[email protected]