Top Banner
Ohio County Year 1 Results May 2012 NDPC SD and WVDE
32

Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Jan 18, 2018

Download

Documents

Brice Gregory

Baseline Data Details Students absent for 6-10 days – 23% All – 12% SWD Incidents of ISS for tardies in – 618 All – 69 SWD Average Lexile score for targeted students is 665
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Ohio County

Year 1 ResultsMay 2012

NDPC SD and WVDE

Page 2: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

BASELINE DATA

Red Flags:Student AbsencesIncidences resulting in ISSReading level of at-risk students

Page 3: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Baseline Data Details• Students absent for 6-10 days– 23% All– 12% SWD

• Incidents of ISS for tardies in 2010-11– 618 All– 69 SWD

• Average Lexile score for targeted students is 665

Page 4: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

FOCUS TOPICS

Considering current resources and practices, what did the team select as the

focus area(s) for the work?

Page 5: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Focus Areas Attendance

Behavior

Academics/Course Performance

Page 6: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

GOALSOUTCOMES

EVALUATION

What we did and our results

Page 7: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 1:

Increase graduation rate by 1%

Page 8: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 1 Data Targets

Graduation rate for 2011-2012

Group 2010-2011 2011-2012

All 75% At least 76%

SWD 59% At least 60%

Page 9: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 1 Strategies

• Implement Option Pathway Program• Activate School-wide Monitoring Team• Incorporate READ 180 curriculum and

techSteps

Page 10: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 1 Implementation Steps

• Full-time GED teacher to offer Option Pathway to students to meet graduation requirements

• Option Pathway team to identify students for the program

• Assemble a school-wide monitoring team that includes the following: OCS Attendance Director, WPHS Assistant Principals and Counselors, Graduation Coaches

Page 11: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 1 Implementation Steps

• Credit checks and student academic progress monitored by the team regularly

• Identified 60 at-risk students for reading intervention to be scheduled into the READ 180 block classes

Page 12: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 2:

• Decrease truancy by 2%

• Decrease the number of students receiving ISS for tardies by 8%

Page 13: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 2 Data Targets

• Students absent for 6-10 days

• ISS for student tardies

Group 2011 2012

All 23% 21%

SWD 12% 10%

Group 2011 2012

All 618 568

SWD 69 63

Page 14: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 2 Strategies

• Activate School-wide Monitoring Team

• Implement Tardy Monitoring Procedure

Page 15: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 2 Implementation Steps

• Assemble a school-wide monitoring team that includes the following: OCS Attendance Director, WPHS Assistant Principals, Counselors, and Graduation Coaches

• Bi-weekly meetings to review attendance lists and to identify interventions needed (letter, phone call, home visit, Juvenile Mediation, court, DHHR, etc.)

Page 16: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 2 Implementation Steps

• Daily updates to Google Doc used to monitor students identified at-risk (attendance, academics, behavior)

• Design a plan for conducting tardy sweeps and solicit teacher volunteers to participate

• Conduct tardy sweeps between each period and monitor student infractions and teacher implementation of school procedures

Page 17: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

RESULTS

What are our results at the end of one year?Where do we stand now with our progress?

What conclusions have we identified?

Page 18: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 1 Results

Projected Graduation Rate for 2012 (2011 cohort)

Group State 2011 WPHS 2011 WPHS 2012 Change

All 76% 75% 82% +7%

SWD 58% 59% 56% -3%

Page 19: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 1 Results

Targets Students Average Lexile Scores

Beginning of Year End of Year

665 ?

Page 20: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 1 Results

Completed TechSteps Lessons

Year 9th Grade 10th Grade 11th Grade 12th Grade

2011 0 0 0 0

2012 58 130 302 65

Page 21: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 2 Results

Attendance – Students absent for 6-10 days

Group 2011 2012 Change

All 23% 13% -10%

SWD 12% 10% -2%

Page 22: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Goal 2 Results

ISS – Incidents of Student Tardies

Group 2011 2012 Incident Change % Change

All 618 419 -199 32%

SWD 69 47 -22 32%

Page 23: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

GRADUATIONDROPOUT

POST SCHOOL OUTCOMES

Where were we in the past?Where are we for 2012?

Page 24: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Graduation Rate Projection

All Students Students with IEPs

Standard Diploma

Cohort Denominator

Rate Standard Diploma

Cohort Denominator

Rate

WHPS 331 443 75% 33 56 59%

State 16,635 21,759 76% 2,049 3,566 57%

NCLB Data for 2010-2011 (2010 Cohort)

Projected NCLB Data for 2011-2012 (2011 Cohort)

All Students Students with IEPs

Standard Diploma

Cohort Denominator

Rate Standard Diploma

Cohort Denominator

Rate

WHPS 335 409 82% 24 43 56%

Page 25: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Dropout Rate Projection

All Students Grades 7-12 Students with IEPs Grades 7-12

Enrollment Drops Rate Enrollment Drops Rate

Ohio Co. 2,452 47 1.9% 286 8 2.8%

State 122,115 2,729 2.3% 19,103 523 2.7%

Dropout Rate 2010-2011 (2010 Cohort)

Projected Dropout Rate for 2011-2012 (2011 Cohort)

All Students Grades 7-12 Students with IEPs Grades 7-12

Enrollment Drops Rate Enrollment Drops Rate

Ohio Co. 2,460 54 2.1% 279 16 5.7%

Page 26: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Post School Outcomes Projection

• WPHS needs to increase the response rate for the One Year Follow-up Exit Survey completed by students.

• This year each special education teacher will personally contact their advisees from 2011 to complete the survey.

Page 27: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

NEXT STEPS

What do we do next year?What does our future hold?

Page 28: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Next Steps and Plans for the Future

• Investigate an advisor/advisee system to support at-risk students

• More home visits conducted by school personnel

• Solicit additional teacher support for tardy sweep procedures

Page 29: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Next Steps and Plans for the Future

• Attendance/grades/discipline will be tied into privileges to attend dances and extra-curricular activities

• Collaborate with local agencies to improve transition services for students with disabilities

Page 30: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

REFLECTIONS

What have we learned?What do our students, staff, families

and community members say?What will we change?

Page 31: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

Lessons Learned-Observations-Reflections

• Assistant Principals need to loop with their students through the three/four years in high school

• Immediate action needs to be taken for truancy at day 6

• Consistency on procedures and consequences must be maintained throughout all grade levels

Page 32: Ohio County Year 1 Results May 2012 NDPC SD and WVDE.

CONTACT US

Amy Minch [email protected] [email protected]

Wheeling Park High School304-243-0400