Page 1: Oh ffs, can we please stop estimating

Oh ffs, can we please stop estimating

Olga Loyev

Page 2: Oh ffs, can we please stop estimating

Introduction

Page 3: Oh ffs, can we please stop estimating

Why are we here?

Page 4: Oh ffs, can we please stop estimating

Let’s step back

Page 5: Oh ffs, can we please stop estimating

Estimation

Page 6: Oh ffs, can we please stop estimating

What is it we’re trying to achieve?

Page 7: Oh ffs, can we please stop estimating

What we did

Page 8: Oh ffs, can we please stop estimating

Can we do better?

Page 9: Oh ffs, can we please stop estimating

Work in Progress = # of things in being worked on

Lead Time = Time from start to finish

Throughput= How much you get done per period of time

Page 10: Oh ffs, can we please stop estimating

Looking at our data

Page 11: Oh ffs, can we please stop estimating

The less guessing you do, the better

Page 12: Oh ffs, can we please stop estimating

reporting metrics

Little’s Law:

average WIP = average LT x average TP

http://www.cs.bilkent.edu.tr/~tugrul/CS518/Papers/little.pdfhttp://web.mit.edu/sgraves/www/papers/Little's%20Law-Published.pdf

Page 13: Oh ffs, can we please stop estimating

Conditions/assumptions:

● Items of similar size● Conservation of flow: departure rate =

average arrival rate● All work items that enter the system will

eventually be completed and will exit the system

Page 14: Oh ffs, can we please stop estimating

How do we apply it?Time to complete = N/aTP

Or

Time to complete = N* (aLT/aWIP)

Page 15: Oh ffs, can we please stop estimating

Size of stories?

Page 16: Oh ffs, can we please stop estimating

Transition mid project

Page 17: Oh ffs, can we please stop estimating

Risk/issues/considerations?

Page 18: Oh ffs, can we please stop estimating

Time/Price at start of project?- Data

Page 19: Oh ffs, can we please stop estimating

Time/Price at start of project?- NO Data

Page 20: Oh ffs, can we please stop estimating

Forecast future release

Page 21: Oh ffs, can we please stop estimating

Milestones

Page 22: Oh ffs, can we please stop estimating

Final thoughts