ofi CONFIDENTIAL h^.d"fu $/rW'A- Minister-in-Charge MEMORANDUM Public Work (B&R) Minister Administrative Secretary Additional Chief Secretary to the Government of Haryana Public Work (B&R) DePartment subject- Annual Administrative report of the Public works (B&R) Department, Haryana for the year 2016'17 ' The Annual Administrative Report of the Public Works (B&R) Department of the year 2016-17 alongwith its Review and Critique placed before the Council of Ministers, Haryana for their approval in accordance with the Government instructions contained in U.O. No. 16/31 tg1-4PP, dated 01 July, 1991. Therefore, this report along with its review and critique will be printed. 2. Prior approval of the Chief Minister has been obtained for placing this matter before the Council of Ministers. Dated: -08-20{8 Chandigarh Additional Chief Secretary to Government of Haryana Public Works (B&R) Department.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ofiCONFIDENTIAL
h^.d"fu $/rW'A-
Minister-in-Charge
MEMORANDUM
Public Work (B&R) Minister
Administrative Secretary Additional Chief Secretary to the Government of Haryana
Public Work (B&R) DePartment
subject- Annual Administrative report of the Public works (B&R)
Department, Haryana for the year 2016'17 '
The Annual Administrative Report of the Public Works (B&R)
Department of the year 2016-17 alongwith its Review and Critique placed before the
Council of Ministers, Haryana for their approval in accordance with the Government
ili='JfiH'::Jf."Jlu*i,iJl"il.I;'X1"HHi:itr'fi $iiili:::"*,ll[*'t';:"mili:0"'Bor basis was awarded t9 n1o 19'11"::Sj::1i :"T?;;'U*::S3H?SfI:3'"J': i? ; l'3". 3Y::: ffi J:-'H. ;:;' ;il ; i;d; n d th e co n cess io n ai re h a s
been coltecting aii"i""" June ZOIZ'aiiconcession period is seventeen (17)
Rs. 61g.00 crore were provided for repair and maintenance of
142618-620dated23,ol'2olT.TheFinanceDepartmenthasmadeaprovision of Rs. 33.75 crore in the state Budget in the supplementary
Estimates 2017-18 (lst lnstallment)' The funds will be got released from the
State Govt. in the 3'd week of December 2017 '
ii)TheAdministrativeApprovalfrom62nos.ofworksamountingtoRs.3707.55 lacs has so far been received from the state Govt' Further' DNITs &
D/Esfor5gnos.ofworkshavealreadybeenapproved&tendersforapproved works are under process/ being allotted'
:-r-q
8. NABARD PROJECT
1. (a) NABARD PROJECT UNDER RIDF -Xlll to RIDF'XVI (Roads &
Bridges): ComPleted'
(b)NABARDPRoJEGTUNDERRIDF.XVIII(Roads):Allthe25No.works have been
"orpr"t"o. Total expenditure incurred on these
proleitsduringtheyear2016.17isRs.239'55Crore
2.NABARDPRoJEGTUNDERRIDF.XIX(Roa!s).^z]^+!;zznos'roadsfor amounting to ns._zzo.g1+ 80.21+ 19.45= 376,57 crore having
fengih of lgtlgO+37.18+34.99= 264.13 km. have been approved from
the NABARD. Out of iz no. worrs 30 works have been completed' 2
nos. works are in piog*r". Total expenditure- incurred on these
projects during tne yeaiz 016-17 is Rs. 256.62 Crore. About 252'40
x,,.' [ngth ori"ot zai,3 km length has been completed.
3. NABARD pRoJEcr UNDER RtDF-xlx (Bridges): 22 nos. bridges for
amounting to Rs. roo.og crore has been a[proved.flom NABARD'
out of 22 No. works io No. works have been completed and 2 No'
works have been OroppiO. ihe total upto date expenditure incurred on
tnese pioju.t. during'the year 2016-17 is Rs. 66.89 Crore'
4.NABARDPRoJECTUNDERRtDF-xx(Roads}:?1^no'.roadsforamountingtoRs.353.60Crorehavinglengthgf246^qgKmhasbeenappiou"O"from NABARD. Out of 31 ftos. works 26 Nos' works have
beencompletedand2Nos.workshavebeendropped.3Nos.work,ru in pt,igress. rne totat expenditure incurred on these projects
duringtheyear2016-17isRs.166'64croresabout108'95kmlengthout oizao.Og Lt* length has been completed'
5. NABARD PRoJECT UNDER RlDF.xxll (Roads & Bridge): 26 roads
having length of 184.78 km & 3 bridges= ig tttos' works for amounting
toRs.154.21+29,77=lS3.gScrorehasbeensanctionedfromNABARD. Out of 29 Nos. works 24 Nos' works have been allotted'
The total expenditurl incurred on these projects during the year 2016-
17 is Rs' 22,70 ",o,",
about 12,20 rm tength out of 184.78 km length
has been comPleted'
6.NABARDPRoJECTUNDERRtDF.xxII(AdditionalRoads):27roads having length of 230.73 km for amounting to Rs' 115'36 Crore
has been sanctioned from NABARD'
g. BRIDGE/ROBS
5 bridges under Head 5054 with an approximate cost of Rs. 10,52
crore have been compteteJ-during year 2O1O-ll, 4 Nos' Bridges with an
approximaie cost of Rs. 27 .74 crores in progress under Head,5054 during the
year zoto-iz, a Nor. nogslnuBs with the cost of Rs' 250.00 crore were
completed and 13 Nos. COednUBs in Progress under Head 5054 with an
estimated cost of Rs' 318'48 crore'
a) Bridges completed with cost Rs. 10.52 crore under head 5054 during
the Year 2016-17:.'
1.
2.
Constructionof2spanTmeach(15skew)RCCboxtypebridgeoverlshapur Kheri Drain at RD 10500 crossing Gohana lakhanmajra road at
RD 6400 in SonePat Distt'
Constructionofsingrespan5meach(23skew)RCCboxtypebridge.onButana Distributarf11 no 58800 .totting Go6ana Lakhanmajra road at
RD 4450 in SonePat Distt'
7
8
3. construction of vented causeway by providi!9 box tw9-cylvgrt on link
road from NH-ZS to village Moginanl itlaggal in Km' 2'05 in Panchkula
Distt.4. construction of 2 span 6 m each RCC box type bridge. oyelihappra
Drain at RD 45990 crossing Gohana Baroda Julana road at RD 15'5 in
SonePat Distt'5. Re construction of 2 lane of H.L. bridges over BMB & Fatehabad
Nizampur-NarnaulMahendergarh-Dad11lh'y3nLHansi-Barwala.Tohana-Munak upto state Border 1sHlzl (Road lD 5369)Km.222'86 &222'91 (ln
Tohana citY Portion).
b) Bridges in progress under head 5054 costing Rs'27'74 crore during
the Year 2016-17-
1. Construction of new H.L. Bridge down stream side of existing bridge on
Ghagger river at Km. 235 on t<iithat-Patiala road in Kaithal distt'
2. Construction of HL bridge on Tangri Nadi in Kalka constituency'
3. construction of new H.L. Bridge oi 6 .prn 9 O_O , each on link road village
KazampurtoRampurThadeoninPanchkulaDistt.4. Reconstruction of bridge or". o Bhuna Ratia road crossing Ratia sub
Branch (sukchain canit; at RD-17947 and Rattakhera Distt. at RD-
c)
17895 in Fatehabad Distt.
RoB/RUBCompletedUnderHead5054costingRs.250.00croreduring the Year 2016-17:-
ROB at Nilokheri at level crossing No' 78-AB 'L 119 on Delhi Ambala
Railway line crossin! on Nilokheri Kaul Dhand in Distt' Karnal'
ROB at Shahbal It tevet crossing No. 98-AC in 179t19-21 on Delhi
Ambala Railway line crossing on "snanoro Thol road (sH-4) in Distt'
1.
2.
d)
Kurukshetra.3. Construction of approaches of 2 lane ROB at level crossing no c-69in
Km. 1 20111-13 on Delhi Ambala Railway line crossing Karnal Munak road
RD-2.10.4. ROB at level x-ing No. 31 in Km 38.100 on Delhi-Bhatinda Railway line on
Kharkhoda Assaudha Road in Distt' Jhajjar'
5. 4 lane ROB over Delhi-Ambala Railway line LC No' 21 on Rai Nahra
Bahadurgarh road. (HSRDC)
6.RoBatJaxrrat-Kulan-BhaturoadatL/CNo.167in.7. construction of 2 lane ROB on L/C No. 26-8 at sonepat on sonepat
Kharkhoda road in SonePat Distt'g. Construction of RUB on Hanumangarh Sadalpur railway line at Railway
Km. 38/1 Talwara Jhil, Ellenabad in'
Construction of ROB at Km. 57.565 on Rewari-Bhatinda Railway line on
bye pass connection Dadri-Bhiwani and Dadri-Bond road near village
Rawaldhi at Dadri in Hary'ana'
ROB on sonepat ayc pr!. crossing New sonepat Jind railway line.
RUBonSonepatByepasscrosslngDelhiAmbalaRailwayline.Low height subway in between Mal Godam road to Anaj Mandi at
Bahadurgarh (DePost work)'construction of nug on Jind panipat Railway line crossing Rajbaha No' 7
in Jind Distt.construction of RUB at Ellenabad on LC No' 32 0n Hanumnangarh
5. 2 Lane ROB at Sonepat Purkhas road nearSugar Mill on Delhi
Ambala RailwaY line at L/C No. 29'
6. Const. of additional 2lane ROB at level crossing no. 3 on Hisar-
Sadalpur Railway line at Dabra Chowk Hisar'
7. Construction of approaches of 4 lane ROB on LC no' 79 on Delhi
Bhatinda Railway line crossing Gohana Lakhanmajra Mehan road.
8. Constructon of 2 lane ROB at L/C no. 54 on Jind Panipat section
(location 66/9-10) crossing road alongwith Delhi water carrier link
channel in PaniPat District.
9. Construction of 2 lane ROB at level x-ing no. 55 on Jind Panipat
Section(location 67t10-11) over road on Panipat Kabri road in Panipat
District.
The total expenditure incurred during the Financial Year
2016-2017 is Rs. 131.08 Crores.
r11
INCUMBENCY
On the administrative side of the Govt., Sh.Hardeep Kumar, IAS remained as theAdditional Chief Secretary from 01 .04.2016 to 31 .122016 and Sh. Alok Nigam, IASremained as the Additional Chief Secretary from 04.01.2017 to 31.03.2017. Smt.Pankaj Chaudhary, HCS Chief Vigilance Officer (CVO) of the Department and alsothe Chief Vigilance Officer of HSRDC and HARRIDA. Sh. Rakesh Manocharemained in the capacity of Engineer-in-Chief, Managing Director, HSRDC andSecretary General, (HARRIDA) during the year 2016-2017.
Dated: -08-2018Chandigarh
(ALOK NIGAM)
Additional Chief Secretary to Government ofHaryana Public Works (B&R) Department .
r2e-1d*-4
ADMINISTRATIVE SETUP
The administrative & professional Head of the Deptt. is Engineer-in-Chief. There are
Divisions. Divisions are headed by Executive Engineers consisting of three to four
Sub Divisions. Sub Divisions consist of three to four Sections headed by Junior
Engineers in charge of Sections.
There is a well developed Mechanical wing headed by a Superintending Engineer
(Mechanical) who reports to the Engineer-in-Chief through the Chief Engineer
ieafUl. The State has large fleet of machinery and it is maintained in the Central
MechanicalWorkshop at (arnal; besides a chain of regional workshops. There is an
Electrical wing headed by SE (Electrical ) who looks after the electrical works of the
Buildings and reports to Chief Engineer (E&M).
The work of Horticulture wing is controlled by one Executive Engineers (Hort') who
is assisted by Sub-Divisionaf Engineers. The work of acquiring the land for buildings
and roads is looked after by Land Acquisition Officers.
The State Research Laboratory is situated at Hisar and is headed by 1 Chief
Engineer, designated as Director Research Laboratory. There is a Quality Control
cell headed by Dy. Director at Hisar and Executive Engineers (Quality Control)
located at FaiiOa6aO & Karnal, who examine the quality of materials and perform
tests, independent of the construction agency. Apart from. the main Research
Laboratory at Hisar, there are regional laboratoiies at Bhiwani, Rohtak and Karnal
besides the field laboratories woiking at sites of major construction works. During
the year, 2938 no. samples were ta[en by Quality Control Cell, out of which 2902
were passed and 36 no are under re-checking'
Haryana State Roads & Bridges Development Corporation is headed by
Managing Director-cum-Engineer--in-Chief and assisted by Executive Director who
is Chief Engineer on deputition from the Departmentand there are 7 no' DGMs
located in tietO irr the rank of Executive Engineers, are also on deputation frompWD (B&R) Deptt. Whereas, Haryana Rural Roads and lnfrastructure Development
Agency (HARRiDA) is headed by Secretary General- cum-Engineer-in-Chief PWD
tg;&nl'and assistei Uy Executive Directoiwho is Chief Engineer (Nabard) and
various PlUs in the rank of Executive Engineers posted in the field'
l3
An expenditure of Rs 327661.68 crore was incurred
Bridges and Buitdings, both in respect of construction
up as under:-
on various works of Roads,
and maintenance. The break
STATE RDADSConstruction RoadBridgesMainienance
BUILDINGSConstructic.rnMaintenance of Building(lncluding machinery)
N.H.WorksConstructic ir (l ncluding Bridges)Maintenance
Total expenditure on works
Work charged staff which isCornponeni of works.Regular work charged staffRegular EstablishmentTotal
Total ExPenditure = A+B
Rs. in Lac.136246.38
17623.7854632.78
9844.7025517.7035362.40-
= Rs 327661.68
53778.3714831.58
11634.753551.64
292299.28 - A
E
The cost of regular establishment Comes to:-
35362.40 x 100327661.68 = 10.79 Yo
r:t
t4
REPORT OF VIGILANCE DEPARTMENT HARYANA FOR THE YEAR 2016-17
According to this office no case of PWD B&R Department was referred to VigilanceDepartment during the years 2016-17.
15
Administrative Report for thg vear 2016-2017Harvana Public Works (Buildins & Roads) Department Chandisarh
CHAPTER:-1HEAD OFFICE ADMINSTRATIONName of Post Names of Officers