Top Banner
ALICE Offline Week, 08/1 0/07 Kristján Gulbrandsen , NBI 1 Offline status of the FMD Kristján Gulbrandsen Niels Bohr Institute
8

Offline status of the FMD

Jan 13, 2016

Download

Documents

afundar afundar

Offline status of the FMD. Kristj án Gulbrandsen Niels Bohr Institute. HW Detector Status. FMD3 installed fully HW tested FMD2 installed initially HW tested Full testing with miniframe (~Nov.) FMD1 not yet installed Installation ~Feb. FMD1. FMD2. FMD3. C-side. A-side. Geometry. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Offline status of the FMD

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 1

Offline status of the FMD

Kristján Gulbrandsen

Niels Bohr Institute

Page 2: Offline status of the FMD

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 2

HW Detector Status

• FMD3 installed– fully HW tested

• FMD2 installed– initially HW tested– Full testing with miniframe

(~Nov.)

• FMD1 not yet installed– Installation ~Feb.

FMD3

FMD2

FMD1

C-side A-side

Page 3: Offline status of the FMD

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 3

Geometry

• Geometry consists of TGeo objects• Geometry constructed by half-rings

(for alignment)• FMD3

– All material described

• FMD2– Most material described

• Some support structure missing

• FMD1– Support needs better description

• Check of final positions necessary

Page 4: Offline status of the FMD

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 4

Calibration

• 2 types of calibration necessary– Pedestals– Gains

• Gains taken in standalone run– Procedure implemented on FE Firmware– Injects known charge into pre-amplifiers

• Pedestals can be done 2 ways– Standalone run with no beam– In beam run with past-future protection

Page 5: Offline status of the FMD

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 5

Calibration procedure

• Pedestal and Gain Finders written for standalone runs– Ped. - normal run, no beam– Gain - special run– Not in Aliroot– Need info from DCS

• Fx. Oversampling

– Need DCM from CDB– Possibly send peds to FEE

LDC

Calib.run

PedestalFinderGainFinder

DCS:Start

Calib.run

DCSFE-DB

CDB

FEE

Page 6: Offline status of the FMD

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 6

Shuttle

• Fetch files from FXS(s) and put in OCDB• Interact with DAQ and DCS networks

– Not clear how to get info from DCS FE DB

• Procedure depends on new RCU Firmware

FEEDAQ

DA

DAQLogbook

DB

DCSFEDB

DCSDA

DAQFXS

DCSFXS

ShuttleOCDBDirect Communication?

Page 7: Offline status of the FMD

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 7

Other Open Tasks

• EVE Display– Stands as open task (because we didn’t do it)– Was this implemented by someone else?

• Digit Quality Assurance– Don’t know what should be done here - need input

• Survey Data Format– Only needed for FMD1– Will be done early next year

• HLT output– FMD has no HLT output

Page 8: Offline status of the FMD

ALICE Offline Week, 08/10/07 Kristján Gulbrandsen, NBI 8

Planning

• Main goal is to prepare for dress rehearsal– Prioritize tasks based on this criterion

• Automatic procedures get high priority– For offline shuttle is most important

• Manpower– C. Holm must work on Ph.D. thesis until Jan.– Offline work hopefully to be done by current

research assistant (prospective Ph.D. student)