Office of Traffic, Safety, and Office of Traffic, Safety, and Operations Operations Sample Plan Set Sample Plan Set Signing Plan Design (At- Signing Plan Design (At- Grade) Grade) June 20, 2012 June 20, 2012
Mar 27, 2015
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
Sample Plan SetSample Plan Set
Signing Plan Design (At-Signing Plan Design (At-Grade)Grade)
June 20, 2012June 20, 2012
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
2
Signing Plan Assembly Signing Plan Assembly StepsSteps1. Eliminate levels of detail
(buildings, lot lines, etc) on roadway plan sheets.
REASON: So placement of signs on roadway sheets are not cluttered by underlying details.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
3
Signing Plan Assembly Signing Plan Assembly StepsSteps1. Eliminate levels of detail
(buildings, lot lines, etc) on roadway plan sheets.
REASON: So placement of signs on roadway sheets are not cluttered by underlying details.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
4
Signing Plan Assembly Signing Plan Assembly StepsSteps2. Organize roadway plan sheets: all
mainline roadway comes first with stationing generally increasing from left to right (include roadway through interchanges for depicting mainline signing through interchange; next are interchange/intersection layouts for indicating signing on cross streets and at ramp terminals.
REASON: Consistency in design.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
5
Signing Plan Assembly Signing Plan Assembly StepsSteps3. Place signs on roadway plan
sheets for each direction of travel, as the signs would appear to a motorist (placement and spacing of signs are detailed in the MN MUTCD and the TEM, Chapter 6).
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
6
Signing Plan Assembly Signing Plan Assembly StepsSteps4. Label each type of sign (Types A, C,
D, EO and EA) with the following numbering system:
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
7
Signing Plan Assembly Signing Plan Assembly StepsSteps
A. All signs are assigned a label, whether they are new, existing being removed, or existing being salvaged. All “New Signs” are labeled with their Type and a number sequentially starting at “1”, “Existing Signs to be Removed “ start numbering with “101” and “Existing Signs to be Salvaged” start numbering with “201” (e.g. the first new Type A sign would be A-1, the first new Type D sign would be D-1, the first existing Type EA sign to be removed would be EA-101, and so forth for all types of signs).
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
8
Signing Plan Assembly Signing Plan Assembly StepsSteps
B. Begin numbering on the left edge of the first roadway sheet and progressing through the last roadway sheet. Start with the number “1" and increase numbering to the end of the roadway sheets.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
9
Signing Plan Assembly Signing Plan Assembly StepsSteps
C. All completely identical Type C, D, and E (EA & EO) signs receive the same label throughout the plan. However, the signs must be identical in every aspect except location. The factors that are considered unique include the installation and mounting requirements, size, and legend.
REASON: The uniqueness of each sign is bid differently by signing contractors.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
10
Signing Plan Assembly Signing Plan Assembly StepsSteps
D. Type OH signs -each of these signs has a unique number assigned – contact the OTST Signing Unit to obtain OH sign numbers (Rick Sunstrom at 651-234-7381).
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
11
Signing Plan Assembly Signing Plan Assembly StepsSteps
5. Place exit ramp/exit loop delineation note behind the exit nose of each exit ramp/exit loop [this note refers to a “standard” sheet (which depicts the appropriate markers and delineation) included elsewhere in the complete signing plan].
REASON: Delineation and markers for freeway ramps and loops is “standardized” and only the reference to the “standard” is needed on each appropriate roadway sheet.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
12
Signing Plan Assembly Signing Plan Assembly StepsSteps6. Show appropriate delineation and
markers (refer to MnDOT “Traffic Engineering Manual, Chapter 7” for the various types, and application, of delineators and markers; detailed drawings are contained in the MnDOT Standard Signs Manual).
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
13
Signing Plan Assembly Signing Plan Assembly StepsSteps7. Utilities: Compile a list of the utility
companies within the project limits for inclusion in the plan. If signing plan includes ANY signs with concrete or H-Pile (Type A signs have H-pile footings) footings, then ALL utilities need to be shown and labeled on each roadway sheet within close proximity of each concrete or H-Pile footing.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
14
Signing Plan Assembly Signing Plan Assembly StepsSteps8. Design all guide sign panels (using
the latest version of SignCAD®). Refer to the MnDOT “Traffic Guide Sign Design Manual” for standards, policies and procedures. Guide sign design questions, contact Rick Sunstrom at 651-234-7381.
REASON: consistency in design of sign panels in conformance with Federal and State sign design standards.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
15
Signing Plan Assembly Signing Plan Assembly StepsSteps9. Select and verify, or coordinate,
locations (engineering stations) of all Type A and/or Type OH signs with MnDOT OTST Signing Unit (Heather Lott at 651-234-7371 or Rick Sunstrom at 651-234-7381).
REASON: Signs need to be spaced properly and installed at proper locations for motorists’ safety and guidance.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
16
Signing Plan Assembly Signing Plan Assembly StepsSteps10.Obtain a cross section (from design
if new roadway design OR from survey crew if in place roadway) for each new Type A and Type OH sign. Plot all cross sections in Microstation and add the Type A or Type OH sign structure and sign panel(s) in accordance with the format of the cross sections in the back of the Sample Signing Plan.
REASON: consistency in design for bidding purposes for contractors.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
17
Signing Plan Assembly Signing Plan Assembly StepsSteps11.List all appropriate notes that apply
on each roadway sheet for all of the various types of work listed below each sign. Refer to the master list of notes in the Sample Signing Plan.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
18
Signing Plan Assembly Signing Plan Assembly StepsSteps
12.Create the appropriate data boxes (using Excel) for each sign type and type of work being done on the sign (i.e. “Salvage Signs Type C” are tabulated in one data box, “Remove Signs Type C” are tabulated in another data box, etc.). The type of work for each type of sign is already broken down on the notes on each roadway sheet. Refer to the Sample Signing Plan to determine which data boxes need to be created for each type of sign. Then FILL IN the data boxes with the appropriate data.
REASON: The listing of estimated pay quantities are derived from the totals of each of the data boxes
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
19
Signing Plan Assembly Signing Plan Assembly StepsSteps13.Prepare list of standard plates
applicable to project.14.Prepare list of estimated quantities
using the total quantity from each of the data boxes.
15.Assemble all necessary structural and detail sheets.
16.Complete the title sheet (if signing project is NOT tied to a construction project).
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
20
Signing Plan Assembly Signing Plan Assembly StepsSteps17.Assemble ALL of the plan sheets in
the proper order (in accordance with the Sample Signing Plan).
18.Number the roadway sheets sequentially beginning with the Title Sheet as Sheet 1
19.Fill in, and check, all sheet cross referencing throughout the plan.
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
21
Plan SheetsPlan Sheets
Title sheet. Estimate of quantities. Sign data sheets giving pertinent
information for each sign. Public utilities Roadway plan sheets showing signing for
mainline and interchanges. Sign panel drawings for all non-standard
signs. Standard details. Structural details.
Refer to Sample Plan Handout
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
Index Map
22
Title SheetTitle Sheet TitleTitle
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
23
Title SheetTitle Sheet
Index Map
Index MapIndex Map
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
24
Title SheetTitle Sheet
Index Map
Begin/End StationsBegin/End Stations
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
25
Title SheetTitle Sheet
Index Map
Plan & Map ScalesPlan & Map Scales
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
26
Title SheetTitle Sheet
Index Map
Plan Revisions TablePlan Revisions Table
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
27
Title SheetTitle Sheet
Index Map
Project NumbersProject Numbers
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
28
Title SheetTitle Sheet
Index Map
Governing SpecsGoverning Specs
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
29
Title SheetTitle Sheet
Index Map
Plan Approvals/CertificationPlan Approvals/Certification
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
30
Estimated QuantitiesEstimated Quantities
For list of items, see Spec Book
List of Pay ItemsList of Pay Items
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
31
Estimated QuantitiesEstimated Quantities
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
32
Type C Sign Data SheetType C Sign Data Sheet Chart A Chart A
Chart A for signs to be furnished and installed
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
33
Type C Sign Data SheetType C Sign Data Sheet Chart A Chart A
Order in accordance with the Standard Signs Summary– Regulatory– Warning– Route Markers & Auxiliaries
Sign NumberSign Number
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
34
Type C Sign Data SheetType C Sign Data Sheet Chart A Chart A QuantityQuantity
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
35
Type C Sign Data SheetType C Sign Data Sheet Chart A Chart A
Number of Posts, Type, and Knee Brace Quantity– TEM Charts 6.2, 6.3Length– See Appendix C – Post Length Determination Sheet
PostsPosts
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
36
Type C Sign Data SheetType C Sign Data Sheet Chart A Chart A Mounting HeightMounting Height
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
37
Type C Sign Data SheetType C Sign Data Sheet Chart A Chart A Panel SummaryPanel Summary
Size specified in the Standard Signs SummarySTOP signs specified in TEM 6-5.12
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
38
Type C Sign Data SheetType C Sign Data Sheet Chart A Chart A Code Number, Panel LegendCode Number, Panel Legend
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
39
Type C Sign Data SheetType C Sign Data Sheet Chart A Chart A Specific NotesSpecific Notes
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
40
Type C Sign Data SheetType C Sign Data Sheet Chart A Chart A General NotesGeneral Notes
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
41
Type C Sign Data SheetType C Sign Data Sheet Chart B Chart B
Same information as Chart A, however,–Chart B is for Signs to be salvaged and installed
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
42
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
43
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
44
Type C Sign Data SheetType C Sign Data Sheet Charts C Charts C
Post Spacing– Punch Codes in Standard Signs Manual or– TEM Chart 6.4
– Panel Legend (graphic)– Details on later sheet
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
45
Type D Sign Data SheetType D Sign Data Sheet Chart D Chart D
Same as Charts for Type C signs, except– Post Spacing
– Punch Codes in Standard Signs Manual or– TEM Chart 6.4
– Panel Legend (graphic)– Details on later sheet
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
46
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
47
Chart EChart E
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
48
Chart F Chart F
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
49
Type D Sign Data SheetType D Sign Data Sheet Chart G - Markers Chart G - Markers
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
50
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
51
UtilitiesUtilities
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
52
UtilitiesUtilitiesAffect on UtilitiesAffect on Utilities
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
53
UtilitiesUtilitiesSubsurface Utility InfoSubsurface Utility Info
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
54
UtilitiesUtilitiesList of UtilitiesList of Utilities
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
55
Roadway LayoutRoadway LayoutStationingStationing
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
56
Roadway LayoutRoadway LayoutSign NumbersSign Numbers
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
57
Roadway LayoutRoadway LayoutSign LocationsSign Locations
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
58
Roadway LayoutRoadway LayoutNotesNotes
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
59
Type D Sign PanelsType D Sign Panels
– SignCAD software used to design panels– Sign panel dimensioning– See Standard Signs Manual for arrow, fraction and overlay details.– Guide Sign Design Course offered Fall 2008?
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
60
Sign PlacementSign Placement
TEM Figure 6.1TEM Figure 6.1
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
61
Delineators & MarkersDelineators & Markers
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
63
Type C & D SignsType C & D SignsStructural DetailsStructural Details
TEM Figure 6.3ATEM Figure 6.3A
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
64
Type C & D SignsType C & D SignsStructural DetailsStructural Details
TEM Figure 6.3BTEM Figure 6.3B
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
65
Type C & D SignsType C & D SignsStructural DetailsStructural Details
TEM Figure 6.3CTEM Figure 6.3C
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
66
Type C Delineators & MarkersType C Delineators & Markersin Concrete in Concrete
Offi
ce o
f Tra
ffic,
Safe
ty, and
Offi
ce o
f Tra
ffic,
Safe
ty, and
O
pera
tions
Opera
tions
67
Type C Signs Mounted on O-Type C Signs Mounted on O-PostsPostsOH Sign Posts on Signal OH Sign Posts on Signal StandardsStandards