Top Banner
1 Office of Nuclear Physics RHIC Users Meeting June 4, 2009 Gene Henry Acting Associate Director of Science for Nuclear Physics U.S. Department of Energy OFFICE OF SCIENCE
14

Office of Nuclear Physics

Feb 25, 2016

Download

Documents

neka

OFFICE OF SCIENCE. Office of Nuclear Physics. RHIC Users Meeting June 4, 2009. Gene Henry Acting Associate Director of Science for Nuclear Physics U.S. Department of Energy. Outline. Introduction FY 2009 Appropriation and FY 2010 President’s Request Recovery Act Funds - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Office of Nuclear Physics

1

Office of Nuclear Physics

RHIC Users MeetingJune 4, 2009

Gene HenryActing Associate Director of Science

for Nuclear PhysicsU.S. Department of Energy

OFFICE OF

SCIENCE

Page 2: Office of Nuclear Physics

2

• Introduction

• FY 2009 Appropriation and FY 2010 President’s Request

• Recovery Act Funds

• Recent Developments

• Office of Nuclear Physics

Outline

Page 3: Office of Nuclear Physics

3

“…So I'm here today to set this goal: We will devote more than 3 percent of our GDP to research and development. We will not just meet, but we will exceed the level achieved at the height of the space race, through policies that invest in basic and applied research, create new incentives for private innovation, promote breakthroughs in energy and medicine, and improve education in math and science.”

“So we double the budget of key agencies, including the National Science Foundation, a primary source of funding for academic research; and the National Institute of Standards and Technology, which supports a wide range of pursuits from improving health information technology to measuring carbon pollution, from -- from testing "smart grid" designs to developing advanced manufacturing processes.”

“And my budget doubles funding for the Department of Energy's Office of Science, which builds and operates accelerators, colliders, supercomputers, high-energy light sources, and facilities for making nano-materials -- because we know that a nation's potential for scientific discovery is defined by the tools that it makes available to its researchers.”

REMARKS BY THE PRESIDENT AT THE NATIONAL ACADEMY OF SCIENCES ANNUAL MEETING - April 27, 2009

http://www.energy.gov

Page 4: Office of Nuclear Physics

4

Science Leadership at the Department of Energy:

Steven Chu -- Secretary of Energy

Steven Koonin -- Under Secretary for Science

William Brinkman -- Nominee for Director of the Office of Science

Page 5: Office of Nuclear Physics

5

(millions) FY08 FY09 FY 10 vs FY09

Research Operating 143.6 159.2 180.8 + 14%Research MIEs 13.1 13.7 20.0 + 46% <Research> 156.7 172.9 200.8 + 16%

RHIC 137.0 148.9 160.2 + 8%CEBAF 71.7 79.0 83.9 + 6%HRIBF 13.1 15.7 16.6 + 6%ATLAS 12.4 15.2 16.6 + 9%Isotope Operations 0 19.9 16.1 - 19%Other Facility Operations 5.4 3.8 4.3 + 13% <Facility Operations> 239.6 282.5 297.7 + 15%

12 GeV Upgrade R&D/PED 13.4 28.6 22.0EBIS (RHIC) 4.2 2.4 0FRIB R&D/CDR 0 7.0 9.0 <Construction> 17.6 38.0 31.0 - 18%

Other (GPP/GPE/SBIR/etc.) 9.8 18.7 22.5 <Stewardship> 9.8 18.7 22.5 + 20%

Nuclear Physics Total 423.7 512.1 552.0 + 8%

Office of Nuclear PhysicsFY 2010 President’s Request

Page 6: Office of Nuclear Physics

6

millionsResearch FY08 FY09 FY 2010 vs FY09Universities 63.6 69.5 78.5 + 13%Laboratories 73.4 86.4 99.0 + 15%SciDAC & LQCD 2.8 3.3 3.3Rare Isotope R&D 3.8 0 0Other Research .5 14.1 15.8

Operating Subtotal 144.1 173.3 196.6 + 13%

Research Capital Equipment (TEC)GRETINA 4.2 2.0 .4FNPB 1.5 1.5 0PHENIX Silicon VTX 2.0 0.9 0PHENIX Forward Vertex Detector 0.7 2.2 0PHENIX Nose Cone Calorimeter0 0.2 0 0STAR Heavy Flavor Tracker 0 0 1.4HI LHC 2.0 4.0 5.0nEDM 2.1 1.1 4.5CUORE 0.4 2.0 4.5Rare Isotope Beam Science Initiatives 0 0 4.2Capital Equip Subtotal 13.1 13.7 20.0 + 46%

Research Subtotal 157.2 187.0 216.6 + 16%

FY 2010 President’s Request Research

Page 7: Office of Nuclear Physics

7

FY 2008 FY 2009 FY 2010Nuclear Physics Approp. Approp. Pres. Req. Medium Energy Nuclear Physics 112,027 121,752 131,009 Heavy Ion Nuclear Physics 186,626 200,373 219,556 Low Energy Nuclear Physics 83,623 94,618 116,816 [Facility for Rare Isotope Beams 0 7,000 9,000] Nuclear Theory 34,411 39,376 43,419 Isotope Development and Production for Research and Applications 0 24,900 19,200

416,687 474,019 530,000Construction 12 GeV CEBAF Upgrade 13,377 28,623 22,000 EBIS 4,162 2,438 0Total Nuclear Physics 434,226 512,080 552,000

FY 2010

22%

14%

3%54%

4%

3%

Lab Research 1/

Univ Research

Other Research 2/

Facility Operations 3/

Construction Projects

Other 4/

1/ Includes Lab Research and MIEs2/ Includes Accelerator R&D and Generic Rare Isotope Beam R&D 3/ Includes Scientific User Facilities Operations and Other Facility Operations4/ Includes BNL GPE and FRIB Other Project Costs (R&D & Conceptual Design)

FY 2010 President’s Request

Page 8: Office of Nuclear Physics

8

Office of Nuclear Physics Funding

The FY 2009 Appropriation for NP is $512,080,000 and includes the transfer of the Isotopes Program to NP, and an increase in construction. Research and operations increase by about 9%.

FY 2

009

Dol

lars

0.00

100.00

200.00

300.00

400.00

500.00

600.00

FY90FY91

FY92FY93

FY94FY95

FY96FY97

FY98FY99

FY00FY01

FY02FY03

FY04FY05

FY06FY07

FY08FY09

Other (SBIR/GPP/...)

FRIB

RHIC Construction

TJNAF Construction

Bevalac Ops

LAMPF Ops

AGS

RHIC Ops

TJNAF Ops

Other Facilities

Initiatives/R&D

CE/AIP

Research

Page 9: Office of Nuclear Physics

9

American Recovery and Reinvestment ActProjects Proposed by Nuclear Physics

NP principles and assumptions in for use of ARRA funds:

Support the NP mission of fundamental and applied nuclear science– Create or retain jobs – Reduce cost and schedule risk of construction projects and MIEs– Enhance the capabilities of National User Facilities– Augment computing capabilities for theoretical calculations on the lattice– Enhance the Isotopes Program– Provide research and training opportunities for junior researchers and

researchers in skill areas that are short supply– Minimize out year mortgages

Page 10: Office of Nuclear Physics

10

American Recovery and Reinvestment ActProjects Proposed by Nuclear Physics (cont.)

ARRA Project Funding ($M)• Advance Funding of 12 GeV CEBAF Upgrade 65.0• Fundamental Neutron Physics Beam-line MIE 0.6

at the Spallation Neutron Source• PHENIX Silicon Vertex Major Item of Equipment 0.25• PHENIX Forward Vertex Major Item of Equipment 2.0• Enhanced AIP Funding at National User Facilities 25.0

[At RHIC: Implement stochasitic cooling and electron lenses -- 8.0]• Enhanced Utilization of Isotope Facilities 10.0• TJNAF Infrastructure Investments 10.0• Lattice Quantum Chromodynamics Computing 5.0• Nuclear Data Program Enhancement 2.0• Robust Nuclear Science Workforce 20.0 FOA closed• R&D on Alternative Isotope Production Techniques 4.75 FOA closed• Fellowships for Junior Researchers (DOE program) 11.3 FOA under development

TOTAL 155.9

Page 11: Office of Nuclear Physics

11

The program has taken significant steps during the past year to implement the Long Range Plan• Michigan State University was announced as the site and

operating institution for the Facility for Rare Isotope Beams in December 2008

• Luminosity and detector upgrades are underway for RHIC

PHENIX Barrel and Forward Vertex Detector

Implementing the Recommendations of the LRP

•The 12 GeV CEBAF Upgrade project CD-3 was approved September 2008; construction isStarted

•The Fundamental NeutronPhysics Beamline project CD-4Awas approved September 2008

The CUORE Double Beta Decay NeutrinoExperiment MIE is preparing forCD-2

Page 12: Office of Nuclear Physics

12

• Supplies radioisotopes and stable isotopes for research and applications for the Nation– Transferred from the Office of Nuclear Engineering to NP with the 2009 Appropriation– Produces, processes, packages and delivers those isotopes not produced commercially– Re-establishing research and development of isotope production and the production of research isotopes

• Operations for isotope production– Stewardship of Brookhaven Linear Isotope Producer (BLIP) at BNL – Stewardship of Isotope Production Facility (IPF) at LANL– Isotope production at reactors at ORNL and INL– Hot cell facilities at BNL, ORNL, LANL, others– National Isotope Data Center (NIDC)--management information center for all national laboratories and universities in the subprograms portfolio of processing and production of isotopes

• Responding to several reports, studies and workshops– Advancing Nuclear Medicine through Innovations, NAS report identifying several areas warranting attention– Workshop on The Nation’s Needs for Isotopes: Present and Future, NP sponsored workshop

Isotope Development and Production for Research and Applications Subprogram

http://www.sc.doe.gov/np/

Page 13: Office of Nuclear Physics

13

Changes in Office of Nuclear Physics • John Pantaleo and Luisa Romero transferred to NP from NE with the move of the Isotopes Program• Financial Advisor named – Joanne Wolfe• Theory Program Manager position filled – George Fai• Candidates have been interviewed for the Associate Director’s position

Several positions now approved for FY 2009• Program Manager Positions:

– NP National User Facilities vacancy advertisement closed– Isotope Research to be advertised– Isotope Facilities to be advertised

Other possible positions for FY 2010

Detailee/IPA positions– We do have openings - please contact myself or Jehanne Gillo

Office of Nuclear Physics Staff

Page 14: Office of Nuclear Physics

14

Low Energy Nuclear PhysicsCyrus Baktash

IsotopesJohn Pantaleo, Program DirectorLuisa Romero, Program Analyst

Office of Nuclear Physics

Director’s Office StaffTechnical Advisor

(vacant)Financial Advisor

Joanne Wolfe

Program AnalystCathy Hanlin

Program Support Specialist Brenda May

Eugene A. Henry, Acting DirectorCathy Slaughter, Administrative Specialist

Office of Nuclear Physics

Nuclear Theory & Nuclear DataGeorge Fai

Ted Barnes (Detailee)

Physics Research Division

Eugene Henry, DirectorChristine Izzo, Program Assistant

Facilities & Project Management Division

Jehanne Gillo, Director Cassie Dukes, Program Support Specialist

Medium Energy Nuclear PhysicsBrad Tippens

Advanced Technology R & D Manouchehr Farkhondeh

Nuclear Physics Instrumentation Helmut Marsiske

NP National User FacilitiesPhysicist (vacant)

April 2009

09 Planned for FY 2009

09

09

Heavy Ion Nuclear PhysicsGulshan Rai

Hubert van Hecke (Detailee)Isotope Facilities

Physical Scientist (vacant)09

Isotope Research & Development Physical Scientist (vacant)09Nuclear Physics Major Initiatives

James Hawkins