LEA Associates South Asia Pvt. Ltd. A LEA Group Gompany Consulting Engineers & Planners lndependent Ensineer for Mahua-Jaipur O&M Project Office: Laxmipuram Collector Chauraha, Main NH-11, Dausa {Rajasthan) T el: + 9L-!427 -22395L, F axr +97-L427 -22384L E-mai!: [email protected]LASA/Highway I O&M173398/Mahua-Jaipur/20 1 S/1 6Ss Authorised Signatory, M/s Jaipur Mahua Tollway, Pvt. Ltd. Rajadhok Toll Plaza, Village - Rajadhok VIA Banskho, Post Office - Jhar, District - Jaipur RAJASTHAN, Pin Code: 303305 Dated: 15.05.2015 Subiecfi-lmprovement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2-Lane Road and Widening to 4-lane of Divided Highway of Mahua-Jaipur Section of National Highway-11 from Km. 120.000 to 228.OOO in the State of Rajasthan on BuiH, Operate and Transfer (BOT) Basis Under NHDP PHASE-IllA:- lnspection Report of Toll System Specialist for the period 06.05.2015 to 15.05.2015 Reference:- 1. JMTPL letter no. JMTPL 1LASN2O14-1510212496 dated 29.02.2015 2. JMTPL letter no. JMTPULASN2014-15!0212497 dated 28.02.2015 3. JMTPL letter no. JMTPL/LASN2014-1510412505 dated 13.04.2015 Dear Sir, Please refer to your above cited letters regarding trial run and finalising the positive COS for ETC implementation. The inspection of Sikandra Toll Plaza and Rajadhok Toll Plaza was done by our Toll System Specialist between 06.05.2015 to 15.05.2015. The inspection report is enclosed for your perusal and necessary action please. As per the inspection report of the Toll System Specialist the ETC system for its implementation is not ready so far. During the inspection of the Toll Plazas, the trial run at one dedicated lane for ETC at Rajadhok Toll Plaza was given. The trial run at other dedicated lanes for ETC at Rajadhok and Sikandra Toll Plazas was not given. You are requested to take necessary action for completing the work of ETC implementation.at both Toll Plazas in all respect at the earliest and report compliance as it is in high priority of pMO. With regards, Yours faithfully, for LEA Associates South Asia Pvt. Ltd. (Rajendra Mathur) Team Leader Encl:- As above CC: 1. PD, PIU - Dausa for kind information 2. Mr. A.K Sharma, LASA H.O. New Delhi Corporate Office: B-t/E-27, Mohan co-operative lndustrial Estate, Mathura Road, New Delhi- 110 044 rndia Tel: +91-11-2697 3950-52,4167 8150 (8 Lines), Fax: +gt-LL-4L67 9659,2697 LO62 E-mail:lasa @lasaindia.com, Website: www.lasaindia.com / www.lea.ca Overseas Registered Offices:
7
Embed
of Toll for the - nhai.org.innhai.org.in/spw/CorrespondenceIssues/1655-15.05.2015 Inspection...Existing 2-Lane Road and Widening to 4-lane of Divided Highway of Mahua-Jaipur Section
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
LEA Associates South Asia Pvt. Ltd.A LEA Group GompanyConsulting Engineers & Planners
lndependent Ensineer for Mahua-Jaipur O&MProject Office:
Subiecfi-lmprovement, Operation and Maintenance, Rehabilitation and Strengthening ofExisting 2-Lane Road and Widening to 4-lane of Divided Highway of Mahua-JaipurSection of National Highway-11 from Km. 120.000 to 228.OOO in the State ofRajasthan on BuiH, Operate and Transfer (BOT) Basis Under NHDP PHASE-IllA:-lnspection Report of Toll System Specialist for the period 06.05.2015 to15.05.2015
Reference:- 1. JMTPL letter no. JMTPL 1LASN2O14-1510212496 dated 29.02.20152. JMTPL letter no. JMTPULASN2014-15!0212497 dated 28.02.20153. JMTPL letter no. JMTPL/LASN2014-1510412505 dated 13.04.2015
Dear Sir,
Please refer to your above cited letters regarding trial run and finalising the positive COS for ETC
implementation. The inspection of Sikandra Toll Plaza and Rajadhok Toll Plaza was done by ourToll System Specialist between 06.05.2015 to 15.05.2015. The inspection report is enclosed foryour perusal and necessary action please.
As per the inspection report of the Toll System Specialist the ETC system for its implementation is
not ready so far. During the inspection of the Toll Plazas, the trial run at one dedicated lane forETC at Rajadhok Toll Plaza was given. The trial run at other dedicated lanes for ETC at Rajadhok
and Sikandra Toll Plazas was not given.
You are requested to take necessary action for completing the work of ETC implementation.atboth Toll Plazas in all respect at the earliest and report compliance as it is in high priority of pMO.
With regards,
Yours faithfully,for LEA Associates South Asia Pvt. Ltd.
(Rajendra Mathur)Team Leader
Encl:- As above
CC: 1. PD, PIU - Dausa for kind information2. Mr. A.K Sharma, LASA H.O. New Delhi
Laxmi Puram, Near Somnath Chauraha,Dausa -303303Rajsthan
Date:15-05-2015
Sub: lmprovement, Operation & Maintenance including rehabilitation and strengthening of existing
2-[ane road and widening to -Lane divided highway of Mahua - Jaipur section of NationalHighway - 11 (NH-11) from Km 12O.000 to Km 228.000 in the state of Rajasthan on Build,
Operate and Transfer (BOT) basis Under NHDP Phase-lll. - Review Report of Toll Expert.
Dear Sir,
The Undersigned has visited the Project site in the capacity of Toll System Specialist, the Review Reportand observations for the captioned project is attached herewith in reference to the visit. This may be
forwarded to the concerned after your review for their study & records and instruction to theConcessionaire.
Thanking you,
Yours sincerely,
Encl:
1. lnspection Note with observations.
':lLaxmi Puram, Colledorate Circle , Near Somnoth Chouroha,
The present observation on the visit of Rajadhok & Sikandra Toll plaza is as follows:
* ln my last visit it was seen that the installation process of ETC equipments at both toll plazaswere in progress' At that time the Concessionaire's representative told that the installation ofETC equipments would be completed within first week of March and then ETC Lanes startworking.
But in this visit I have found that there is no any improvement in ETC installation work. Allequipments for ETC lanes are not installed till now. The details of equipments installation atRajadhok Toll Plaza is given below.
Main NH-77,Dauso 8A3203, (Rajsthon)Tel: + 91-1427-223951,
Lmail: lasadaus a@l as aindia. c omwww.lasaindia.com
Raiadhok Toll Plaza
Sr. No. Descriptions Quantity
Equipments supply & lnstallation per Toll plaza As per NHAI lnstalled byConcessionaire
t RFID ETC transceiver (entry) -over lane entrance (AVl) 2 (1 per lane) 1
2 RFID ETC transceiver (exit) -over lane Canopy near AVC 2 (1 per lane) Not installed
3 Electronic Enclosure 2 {L per lane) 2
4 Lane Controller with lndustrial pC 2 (1 per lane) 2
5 AVC including sensors, loop and detector 2 (1 per lane) 2
6 User fare Display with mounting pole 2 (1 per lane) 2
7 Automatic Barrier Gate 2 (1 per lane) 2
8 Overhead Lane Status light (OHLS) 2 (1 per lane) 2
Tel: + 91-1427-223951,E-mai I : I asadausa@las aindia. com
www.lasaindia.com
29Providing traffic cones along the ETC lane at spacing of 2meters 2 (L per lane) Not available
* After several visit of toll plazas, the Concessionaire has given a trial run of vehicle in one laneonly at Raiadhok Toll plaza for showing that Tag is read by the RFID reader. yes, it is read byRFID reader but the processing time is very slow. Due to that the traffic light signals becominggreen when vehicle reaches to first traffic light post. The response time should be reduced sothat when vehicle touch the first loop and tag read by reader, traffic light should be green for avalid tag and vehicle will pass without any disturbance.
* The details of equipments installation at sikandra Toll plaza is given below.
The Concessionaire is not in a position to give the trial run of ETC lanes at Sikandara Toil plaza.
The Over Head Lane Signal of all lanes at both toll plazas is working properly.
Some User Fare Display and traffic light at Rajadhok Toll Plaza and also at Sikandra Toll plaza arenot working. The Concessionaire has been instructed to rectify the problems of UFD and TrafficLight immediately and make sure that it should be always in working condition.
iihary
(Toll System Specialist)LEAAssociates South Asia Pvt. Ltd.