Page 1 Shahjibazar 330 MW CC Power Plant Construction Project SL.NO. ID No. Date of Birth Name, Dist, Qualification and Date of Joining Place of Posting Field of Training & Duration Country Inspection Comments 1 1-0554 30.12.60 Mr. Sayed Abdul Hakim Shah Nilphamiry B.Sc.Engg. (Mech.) 28.12.83(AE) 18.03.93(SDE) 09.03.03(XEN) 28.01.14 (SE) PD (Addl. CE, Incharge) Shahjibazar 330MW CC Power Plant construction Project. 1)Advanced Training On Power Generation Operation From 06.10.89 to 11.11.89 West Germany 1) Practical Demonstration & Factory Test Witness Of Diesel Generating Set From 10.10.04 to 18.10.04, 9 Days in USA. 2) In depth discussion of the short list and evaluation report for the EOI for recruitment of consulting firm for Baghabari 100 MW, Shahjibazar 2X35 MW and Sylhet 150 MW conversion project from 22-26 april/2014 in Luxemburg. 3)Design review meeting against Bibiana South project from 3-10 April/2016 in Spain.
8920
Embed
of Power Station Project of BPDB as on 18.05.2016.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1
Shahjibazar 330 MW CC Power Plant Construction ProjectSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0554 30.12.60 Mr. Sayed Abdul HakimShah Nilphamiry
1)Advanced Training On PowerGeneration Operation From06.10.89 to 11.11.89
West Germany 1) Practical Demonstration &Factory Test Witness OfDiesel Generating Set From10.10.04 to 18.10.04, 9 Days inUSA. 2) In depth discussion of theshort list and evaluationreport for the EOI forrecruitment of consultingfirm for Baghabari 100 MW,Shahjibazar 2X35 MW andSylhet 150 MW conversionproject from 22-26 april/2014in Luxemburg. 3)Design review meetingagainst Bibiana Southproject from 3-10 April/2016in Spain.
1)Training On 33/11KV 2x10MVA sub station from April/06for 08 Days in Thiland. 2) training on capacitybuilding program from18.01.16 to 20.10.15 in Manila
Thiland 1) Factory Test Witnessagainst "HRSG Feed WaterPump" from 25.05.07 to31.05.07 for 07 days inGermany. 2) "Gas Turbine Model V94.2Inspection" for Sylhet 150MWCombined Cycle Power PlantConstruction Project from 25-01-2011 to 30-01-2011 for06(Six) days in Italy. 3) 'Basic Design & Drawing 'against Shahjibazar P/S from5.3.14 to 18.3.14 for 14 daysin China. 4) Factory Test Witness ofGas Turbine againstShahjibazar 330 MW CCPPProject from 08.12.14 to17.12.14 in Austria. 5) Detail drawing againstShahjibazar 330 CCPP Projectfrom 26.07.15 to 08.08.15 inChina. 6) Factory Test WitnessAgainst Shahjibazar 330 MWCCPP Project from 02.09.15 to08.09.15 in Spain. 7) Factory acceptance test ofgas booster againstshahjibazar 330 MW CCPPfrom 14-22 March/2016 inSingapore.
1) "Work Shop Test" forDohazari 100MW PeakingPower Plant ConstructionProject from January/11 for07(Seven) days in China. 2) Basic Design & Drawingagainst Barapukuria 275 MWCoal Based Power Plant from10.11.14 to 25.11.14 in China 3) Factory test witnessagainst Shahjibazar 330 MWproject from 25.08.15 to31.08.15 in France.
1)Training on Powertransformer from 10.10.03 to08.01.04 for 03 Months 2) PSCDP Training program on"Strategic Human ResourceManagement" from 12.08.13 to23.08.13
1)Control and MeasuringInstrument & Automatic8x210MW DI-Jambul thermalpower station From 28.12.87to 28.09.88 for 09 months 2) Operation & Maintenanceof Boiler from 27.05.13 to07.06.13. 3) upgrading & retrofittingwork from 03.03.14 to 16.03.14
USSR
Indonesia
USA
1) "Factory test witness" inorder to purchase JournalBearings and Other Spareparts for turbine againstShiddirganj 210 MW thermalPower station in Dec./2011for 7 (seven)days (excludingtravel time) in Russia. 2) Witnessing ofmanufacturing process from18.09.14 to 24.09.14 inNetherlands.
G.O. issued dated11.04.16 forInspection againstBarapukuria 275 MWP/S project from 8-14June in China.
1) Factory Test Witness From10.01.2004 to 19.01.2004 inIndia, 2) Training on 2000 Nos.-250Amps MCCB. FromJanuary/06 for 07 days, inChina. 3) "Coal Supply Agreemrnts"arranged by IBC AsiaCommodities TrainingAcademy (CTA) from 26.06.12to 30.06.12 in Singapur. 4) Meeting with M/S Fichtner,BIFPCL & NTPC Officials tofinalize technicalspecification for 1320 MWMaitree Super ThermalPower Project at Rampal from12.11.14 to 21.11.14 in India
5 1-01433 20.10.69 Mr. Ajit Kumer Mondol, Jessore, B.Sc.Engr.(Civil.),
12.03.2000(AE) 25.06.09(SDE 28.06.12 (XEN, in charge) 22.02.16 (XEN) 01912-811305 01723-328811
1) Supplying of 6mm dia 1000Quintal, 7mm dia 1000Quintal, 8mm dia 600 Quintal& 9mm Dia 1400 Quintal HighTensile Steel(HTS) Wire, ''Pre-shipment inspection(Foreign)” against ChittagongPC Pole Construction Plant,BPDB, Halishahar, Chittagongfrom for 10 (Ten) working daysfrom the date of actualjourney in China. 2)"Coal Power Genaration"from 10.06.13 to 14.06.13 inThailand.
PD Shikalbaha 225 MWPeaking Power PlantConstruction Project, PDB,Dhaka.
1) CT, PT, Circuit Breaker04.04.03 to 17.04.03 in India. 2) 33KV PotentialTransformer "TechnicalOrientation & Quality TestWitness'' From 23.11.08 to30.11.08 in China. 2) Engineering reviewmeeting (Basic Design &Drawing) against Shikalbaha225 MW Duel-Fuel CCPPProject from 16.11.14 to27.11.14 in India. 3)Technical Orientation andQuality Test Witness"Shikalbaha 225 MW DualFuel CCPP Project from25.05.15 to 31.05.15 inGermany. 4)InespectionagainstShikalbaha 225 MW PeakingPower Plant Feb/2016 in USAfor 7 days
Page 6
2 1-01200 21.02.68 Mr. Md. Samsuddin, Noakhali, B.Sc.Engr.(Mech.),
Shikalbaha 225 MWPeaking Power Plant,Construction Project, PDB,Dhaka.
1) Training on "Design &Maintenance of 33KV/11KVSub-station from 10.07.07 to24.08.07 for 42 days
China 1) Approval of EngineeringData and Detail Designagainst Hathazari 100 MWPeaking Power PlantConstruction Project fromOCtober/10 for 07 days inChina. 2) Inspection of Heatrecovery steam generatoragainst Shikalbaha 225project from 02.11.15 to08.11.15 in South Korea.
3 1-01404 12.11.69 Mr. A.K.M. Mamunul Bashri,
Potuakhali, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, in charge) 0119-5000039
XEN
Shikalbaha 225 MWPeaking Power Plant,Construction Project, PDB,Dhaka.
1) Smart card Type Pre-payment Metering System(Currency Transfer System).10.04.05 to 25.04.05 for 14days. 2) Factory Training (Operation& Maintenance Training)"against Hathazari 100 MWPeaking Power PlantConstruction Project for 30(Thirty days from 15.06.2011 to14.07.2011(Excluding traveltime) (Bond for 5 years)
India & Malaysia
China
1) "Work Shop Test" forHathazari 100MW PeakingPower Plant ConstructionProject from January/11 for07(Seven) days in China. 2) Engineering reviewmeeting (Basic Design &Drawing) against Shikalbaha225 MW Duel-Fuel CCPPProject from 16.11.14 to27.11.14 in India.
4 1-01584 09.02.57 Mr. Md. Ruhul Amin Comilla, Diploma(Civil),
XEN (in charge) Shikalbaha 225 MWPeaking Power Plant,Construction Project, PDB,Dhaka.
1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07days in China. 2) Pre shipmentinspectionagainstChittagong PC Pole from20.06.15 to 29.06.15 in China.
5 1-01219 25.02.67 Mr. A.B.M. Fakhrul Alam, Dhaka, B.Sc.Engr.(Mech.),
19.03.98(AE) 06.10.2004(SDE) 28.05.14 (XEN)
XEN Shikalbaha 225 MWPeaking Power Plant,Construction Project, PDB,Dhaka.
1) "Basic Design" againstSylhet 150MW Gas TurbinePower Plan from 28.07.10 to11.08.10 for 15 days in China 2)1) Technical Orientationand Quality Test Witness"from12.10.2015 to 18.10.205for 07 days in Singapore.
Page 7
6 1-01951 20.06.85 Mr. Shuvashis Ray Norail B.Sc. Engg. (Mech.) 02.10.11(AE) 0183-4745625 [email protected]
AE, Shikalbaha 225 MWPeaking Power Plant,Construction Project, PDB,Dhaka.
1) Engineering reviewmeeting (Basic Design &Drawing) against Shikalbaha225 MW Duel-Fuel CCPPProject from 16.11.14 to27.11.14 in India. 1) Technical Orientation andQuality Test Witness"sep/2015 for 07 days in S.Korea.
1)Improvement of Operationof Electric Power From 09.01.01to 11.02.01 2) Training on 33/11KV 2x10MVA sub station equipment10 days, May/2006. 3) Training on Single Phase &Three Phase Pre-paymentMeters From 08.11.07 to15.11.07 07 days. 4) Project Management fron 15-21 December. 5) upgrading & retrofittingwork from 03.03.14 to 16.03.14 6) Oeration & MaintenanceTraining against Bhola 225MW Power Plant Project from03.08.14 to 09.08.14 7) Operation & MaintenanceTraining on GT & Gas Boosteragainst Bhola 225 MW CCPPProject from 14.04.15 to28.04.15 .
Japan
Norway.
South Africa
Thailand
USA
China
France & USA
1) Inspection On 33KVinsulator from 04.5.02 to11.05.02 India. 2) Inspection On 11KVHotstick January/2001 for 07days in USA. 3) "Technical Orientationand Quality Test Witness" ofBucket Truck to be suppliedfor central ztone powerdistribution project from 10-16 March, 2013 in China. 4) Basic Engineering ReviewMeeting against BHOLA 225mw ccpp Project from 16 - 27August/2013 in China. 5) Detailed engineeringdesign review meeting oncostruction of Bhola 225 MWP/S construction project from10.04.14 to 21.04.14 for 14days in China 6) Inspection againstdistribution control systemfrom 20.08.14 to 26.08.14 inSingapore.. 7) Familiarization Visit from27.08.14 to 31.08.14 in SaudiArabia.
G.O. isued dated05.04.16 for Seconddetail design reviewand approvalmeeting againstGhorasal 365 MWCCPP project from 08-15 May/2016 in China.
8) Detailed engineering design review meeting on Ghorasal 365 MW CCPP Construction Project, from Jan/2015 for 12 days in China. 9) GT balancing test inspection against Ghorasal 365 MW CCPP Construction Project from 11/11/2015 to 17/11/2015 in Germany. 10) Inspection of Gas turbine and generator from 15.01.16 to 21.01.16 in Germany
Page 9
2 1-01389 14.10.74 Mr. Shayamal Kumar Das, Dhaka, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, in charge) 22.02.16 (XEN) 0171-5001271
i) Training on StrengtheningManagement andPerformance Standard inPower Sector throughpromotion of TQM (PI Solving)from 23.02.08 to 09.03.08 for 16days (by JICA).
ii) "Improvement for ElectricPower Distribution Grid" from01.09.09 to 10.10.09. 3) Training on Operation &Maintenance against Bhola225 MW CCPP Project from13.04.15 to 27.04.15 .
Japan
Japan
Italy
3 1-01528 01.09.72 Mr. Mohammad NazrulIslam, Barisal, B.Sc.Engr.(Civil.),
29.04.2001(AE) 10.02.14 (XEN, in charge)
XEN , in charge Bhola 225 MW PowerPlant ConstructionProject,Dhaka
1) Basic Engineering Drawingagainst Chandpur 150MWCombined Cycle PowerStation Construction Projectfrom28.07.10 to 11.08.10 for 15days in China 2) Chandpur 150MWCombined Cycle PowerStation Construction Project,a Training Program named"Detailed Design ReviewMeeting" from 20.01.11 to31.01.11 for 12(Twelve) daysin China 3) Detailed engineeringdesign review meeting oncostruction of Bhola 225 MWP/S construction project from10.04.14 to 21.04.14 for 14days in China.
PD (Addl. CE, Incharge) Bibiana-3 Power PlantConstructionProject,PDB,Sylhet.
1) Training on Maintenance ofH.T. Switchgear from 30.12.86to 26.04.87 2) Training on VHF EquipmentOperation & Maintenancefrom 15.11.09 for 30 days.
Russia
New Zealand
1) Inspection on CFL Bulbagainst Efficient Lightinginitiative for Bangladesh(Phase-1 & Phase-II) fromJuly/10 for 05 days in China.
2) Attending a program ofPower Division named"Management of PPP" from11.11.12 to 25.11.12 inMalaysia. 3) Inspection on "TechnicalOrientation & Quality testwitness" from 05.07.13 to14.07.13 for 10 days inSwitzerland 4) technical orientation &quality test witness againstSCADA Project from 2015 10days in Singapore. 5) Basic design engineeringreview meeting againstBibiana-3 CCPP project from27.01.16 to 05.02.16 in India.
Bibiana-3 Power PlantConstructionProject,PDB,Sylhet.
1) 71MW Gas Turbine PowerStation Against RetrofittingOn-Line Machinery &Management SystemSoftware. From 18.06.07 to23.06.07, 06(Six Days).
Abu Dhabi 1) 132KV SwitchgearEquipment Inspectionagainst Bhera 70MW PeakingPower Plant Construction Project fromOctober/10 for 07 days inIndia. 2) Technical orientation &quality test witness on 25Nos.- 33 KV ACR from 11.11.13to 19.11.13 in South Korea. 3) Witnessing ofmanufacturing processagainst Shikalbaha 150 MWPeaking Power Plant from26.10.2014 to 02.11.14 inGermany. 4) Preliminary Design &Drawing against Ghorasal365 MW CCPP Project from31.03.15 to 13.04.15 in China.
Bibiana-3 Power PlantConstructionProject,PDB,Sylhet. Addl. Charge Bibiana (South) PowerPlant ConstructionProject,PDB,Sylhet.
1) Project Management from02-13 september/2013.
Thailand 1) Breaker Inspection From20.04.02 to 29.04.02 in India 2) Central Zone PowerDistribution Project, aTechnical Orientation andQuality Test WitnessProgram for 11KV Drop OutFuse Link, 11KV LightningArrester, 200 Amps MCCB, 100Amps MCCB & TransformerOil in May/2011 for 07 days inChina.
4 1-01317 01.01.70 Mr. Md. Rukan Uddin, Munshigonj, B.Sc.Engr.(Elec.),
Bibiana-3 Power PlantConstructionProject,PDB,Sylhet.
1)Pri-shipment inspectionagainst Chittagong PC poleConstruction plant from16.04.12 to 26.04.12 for 10days in China. 2)Witnessing ofmanufacturing process ofcondenser, tube & expansionjoint against Barapukuria P/Sfrom 01.02.16 to 07.02.16 inChina.5 1-01460 01.01.72 Mr. Md. Shahedul Azim,
XEN (Incharge), Bibiana-3 Power PlantConstructionProject,PDB,Sylhet.
1) Gang Isolator Orientation/Technical Training on 33 KV &11 KV Gang Isolator fromDecember/04 for 07 days 2) Chandpur 150 MW CCPPProject aganist Others HRSGfrom 30.05.2011 to 12.08.2011for 75 days (bond for 5 years)
India
China
1 )GIS, 33KV Capacitor Bankand Associated SwitchgerNove/07, 07days in Germany. 2) Inspection on 11 MeterSteel Pole (350 daN-500 Nos.)''Type Test in addition toFactory Test'' from 27.12.07to 02.01.08 for 07 Days inChina. 3) "Witness of factory test ofsub-station gantry &hardware" from 10.05.14 to16.05.14 in India. 4) Basic design engineeringreview meeting againstBibiana-3 CCPP project from27.01.16 to 05.02.16 in India.
Page 12
Ghorasal 365 MW CC Power Plant Construction ProjectSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
PD (CE) 365 MW Ghorasal PowerPlant Construction Project,PDB, Narsindi.
H V Network, Operation &Maintenance from 25.04.1994to 03.06.1994.
France 1)Trouble Shooting,Programming ofProgrammable Energy metreFrom 21.08 04 to 10.09.04 for21 Days in USA 2) Inspection against 10-Town Power Distributionproject for QualitryAcceptance test of 33 KVCircuit breaker from 15.09.13to 18.09.13 in India 3) Quality test witness of 11KV disk insulator againstChitt. Zone power dist.system dev. project from15.01.16 to 21.01.16 in India &China.
Page 13
2 1-0683 29.12.60 Mr. Md. Haroon Ur Rashid, Kishoregonj,
1)Improvement of Operationof Electric Power From 09.01.01to 11.02.01 2) Training on 33/11KV 2x10MVA sub station equipment10 days, May/2006. 3) Training on Single Phase &Three Phase Pre-paymentMeters From 08.11.07 to15.11.07 07 days. 4) Project Management fron 15-21 December. 5) upgrading & retrofittingwork from 03.03.14 to 16.03.14 6) Oeration & MaintenanceTraining against Bhola 225MW Power Plant Project from03.08.14 to 09.08.14 7) Operation & MaintenanceTraining on GT & Gas Boosteragainst Bhola 225 MW CCPPProject from 14.04.15 to28.04.15 .
Japan
Norway.
South Africa
Thailand
USA
China
France & USA
1) Inspection On 33KVinsulator from 04.5.02 to11.05.02 India. 2) Inspection On 11KVHotstick January/2001 for 07days in USA. 3) "Technical Orientationand Quality Test Witness" ofBucket Truck to be suppliedfor central ztone powerdistribution project from 10-16 March, 2013 in China. 4) Basic Engineering ReviewMeeting against BHOLA 225mw ccpp Project from 16 - 27August/2013 in China. 5) Detailed engineeringdesign review meeting oncostruction of Bhola 225 MWP/S construction project from10.04.14 to 21.04.14 for 14days in China 6) Inspection againstdistribution control systemfrom 20.08.14 to 26.08.14 inSingapore.. 7) Familiarization Visit from27.08.14 to 31.08.14 in SaudiArabia.
G.O. isued dated05.04.16 for Seconddetail design reviewand approvalmeeting againstGhorasal 365 MWCCPP project from 08-15 May/2016 in China.
8) Detailed engineering design review meeting on Ghorasal 365 MW CCPP Construction Project, from Jan/2015 for 12 days in China. 9) GT balancing test inspection against Ghorasal 365 MW CCPP Construction Project from 11/11/2015 to 17/11/2015 in Germany. 10) Inspection of Gas turbine and generator from 15.01.16 to 21.01.16 in Germany
3 1-01025 24.06.69 Mr. Mohammad Abu BakarSiddique, Shirajgonj, B.Sc.Engr.(Elec.)19.07.94(AE) 03.02.03(SDE) 31.07.12 (XEN)
1)Operation & Maintenanceof Thermal Power Plant From20.05.99 to 17.08.99
China, 1) "Basic Design" againstSylhet 150MW Gas TurbinePower Plan July/10 for 15days in China 2) Approval of "ConstructionDrawings" aganist Sylhet150MW Combined CyclePower Plant ConstructionProject for 08(Eight) days inChina. 3) Preliminary Design &Drawing against Ghorasal365 MW CCPP Project from31.03.15 to 13.04.15 in China
Improved Maintenance ofThermal Power Plants.Fro17.03.2003 to 21.03.2003
Malaysia, 1) Inspection againstFaridpur 50MW PeakingPower Plant ConstructionProject for 07 days inIndonesia. 2) PIM (Power ManagementInstitute) NTPC for 03 days atFebruary/11.
"Factory Training" againstFaridpur 50MW Peaking PowerPlant Construction Projectfrom 12/09/2011 to 11/10/2011for 30 days (Bond for 5 years)
Norway 1) Inspection of 132kv CircuitBreaker against Faridpur50MW Peaking Power PlantConstruction Project inJanuary/2011 for 07 days inUSA. 2) Preliminary Design &Drawing against Ghorasal365 MW CCPP Project from31.03.15 to 13.04.15 in China.
1) Technical orientation &quality test witness on 50Nos.- ACR from 15.11.13 to21.11.13 in South Korea. 2) Preliminary Design &Drawing against Ghorasal365 MW CCPP Project from31.03.15 to 13.04.15 in China. 3)Inspection againstGhorasal 365 MW CC powerplant constructio PlantConstruction Project from 8-14 March/2016 in Germany
Page 15
8 1-01304 01.01.69 Mr. Md. Nannu Mia, Gazipur, B.Sc.Engr.(Mech.),
XEN(Incharge), Ghorasal 300-450 MW gasTurbine power plantconstruction project, PDB,Dhaka.
1) Critical Mechine Protection& Management System From23.03.03 to 29.03.03 2) Counterpart TrainingProgram in Power Sector/2013.
3) Micro Hydro Power from15-23 March/2013 4) Renewable Energy from01.06.13 to 30.06.13 for 1month. 5) Procurement & supply chainmanagement from 30.09.13 to11.10.13.
Singapore,
Japan
Australia
Thailand
Thailand
1) "Approval of EngineeringDrawing Design & Data" forSantaher, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to01.03.11 for 07 (seven) daysin China.
Deputed toMinistry
Gopalganj 100 MW Peaking Power Plant Construction ProjectSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0995 10.11.68 Mr. Md. Kamrul Islam, Noakhali, B.Sc.Engr.(Civil.),
Gopalgonj 100MWPeaking Power PlantConstruction Project, PDB,Dhaka.
1)Traning On Planning &Design Against 210 MW.Siddhirgong From 02.09.04 forOne Month
Russia, 1) Inspection on Alternatoragainst Gopalgonj 100MWPeaking Power PlantConstruction Project from10.02.11 to 16.02.11 for 07days in Germany. 2) “Factory Test Witness forBalance'' (For Balance ofPlant” in India andIndonesia & For EmergencyDiesel Generator inSingapore) againstGopalgonj 100MW andFaridpur 50 MW PeakingPower Plant ConstructionProject for 07 days in Indiaand Indonesia.
Bera 70 MW Peaking Power Plant Construction ProjectSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1)Operation and maintenanceof sub-station. 09.01.91 to08.04.91 (3 Months) 2)Training of measure testwith the required testEquipment 15.10.01 to 15.11.01(01 Month)
China,
UK (England)
1)from 22.02.02 for 07days inIndia 2) 500 Nos.09 Meter SteelPole (200 DAN) & 100 Nos. 09Meter Steel Pole (350 DAN)From 14.04.07 to 22.04.07 for07(Seven Days) in China. 3) "Engine Inspection"against Santahar 50 MW andKatakhali 50 MW PeakingPower Plant ConstructionProject in July/2011 for 07days in Germany. 4) Inspection of Step-upTransformer againstSantahar 50 MW andKatakhali 50 MW PeakingPower Plant ConstructionProject in March/2012 for 7days (excluding travel time)from the date of actualjourney in China.
Conversion of 2Ă—35 MW Shahjibazar GT Power station to 105 MW CCPP Construction ProjectSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0830 15.09.62 Mr. Md. Altaf Hossain, Patuakhali, B.Sc.Engr.(Elec.)
18.2.88(AE) 21.11.99(SDE) 03.08.10 (XEN)
PD (Incharge) Conversion of 2Ă—35 MWShahjibazar GT Powerstation to 105 MW CCPPConstruction Project, PDB,Shahjibazar
1) Trining for Technical Know-how & Technology Transfer,33 KV Current Transformer for18.05.06 to 24.05.06, 07 daysin China. 2) Technical Orientation &Quality Test Witness of 33/11KV Power Transformer from01.02.2015 to 07.02.2015 inChina. 3) Technical orientation &quality test witness againstChit. Dis . Dev. Project Pur -117 for 7 days Oct/2015 inIndia &China.
Conversion of Baghabari 100 MW Power Plant Construction Project
Page 17
SL.NO. ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-0957 10.01.59 Mr. Khandaker Abul Aslam
Satkhira B.Sc.Engr.(Mech.)
28.10.84(AE) 12.07.2002(SDE) 03.08.10 (XEN)
PD (Incharge) Conversion of Baghabari100 MW Power PlantConstruction Project,PDB,Dhaka.
1) Training on TQM 29.01.03 to28.02.03 2) O & M Traning on Planning& Design Against 210 MW.Siddhirgonj from 03.09.04 to01.11.04 (Bond for 03 Yearsfrom 01.09.04 to 31.10.04.) 3) Training on Siddirgonj 210MW Peaking Powe PlantConstruction Project from27.01.09 to 15.03.09 in India.
Japan
Russai
India
1) Inspection from 25.11.10 to01.12.10 in Ukraine
2 1-01737 03.09.77 Mr. Mohammad ErfanulHaque Dhaka B.Sc.Engr(Elect.) 07.04.06 (AE) 28.01.14 (SDE) 24.11.14 (XEN, Incharge)
XEN (Incharge) Conversion of Baghabari100 MW Power PlantConstruction Project,PDB,Dhaka.
1) ''Inspection of HeatRecovery Steam Generatoragainst Dudkhandi 50MWPeaking Power PlantConstruction Project for 07days in China. 2) "Technical Orientation &Quality Test Witness"against ACSR Grosbeak, ACSRMERLIN, GUY WIRE from06.22.13 to 28.05.13 in China
PD 52.5 MW Power PlantConstruction Project,Katpotti, Munshiganj.
1) "Basic Design" againstSylhet 150MW Gas TurbinePower Plan from 28.07.10 to11.08.10 for 15 days in China 2) Visit manufacturer'sFactory against 52.5 MWpower Plant contructionproject, Katpotti, Munshiganjfrom 14.10.2012 for 5 days inSouth Korea.
Hatiya Off-Grid Wind - Solar Hybrid System Installation Project
Page 18
SL.NO. ID No. Date ofBirth
Name, Dist, Qualification andDate of Joining
Place of Posting Field of Training & Duration Country Inspection Comments
1 1-01760 16.07.84 Mr. R U M Rashidul Hasan Comilla, B.Sc.Engr(Mech.) 31.05.09 (AE) 24.12.14 (SDE, Incharge) 25.06.15 (SDE) 0167-8033876
Chandpur 150 MW CCPP Projectaganist Plant DCS from30.05.2011 to 12.08.2011 for 75days (bond for 5 years)
1) Factory witness test(Engineering Inspection)HRSG & Auxiliaries andNature Gas Supply &Auxiliaries aganist Chandpur150MW Combined CyclePower Station ConstructionProject for 10 days in China.
PD (XEN) Kaptai 5 MW Solar PV GridConnected Power PlantConstion Project.
1) Inspection on 11 MeterSteel Pole (350 daN-500 Nos.)"Type Test inaddition toFactory Test" from 24.01.08 to30.01.08 for 07 days in China.
2) Inspection againstCentral Zone PowerDistribution Project,Mymensingh to inpect 33 KVXLPE Cable from 19.02.13 to27.02.13 in India. 3) Factory acceptance test ofenergy meter from 10-16March/2016 in Sweden.
Page 19
2 1-01373 23.08.72 Mr. Mohammad ShafiqulIslam, Chittagong, B.Sc.Engr.(Civil.),
PD (XEN) Kaptai 5 MW Solar PV GridConnected Power PlantConstion Project.
1) International TrainingProgramme on Solar EnergyTechnologies andApplications from 14/11/2011to 03/12/2011 for 3 (three)weeks (excluding travel time)
2)Renewable Energy from01.06.13 to 30.06.13
India.
Thailand
1) 2002 in India 2)Training on 11 Meter SteelPole (350 daN-500 Nos.) from07 days March/08 in China 2) “Technical Orientationand Quality Test Witness of11KV PT ” from January/10 for05 days in China. 3) Solar Power Plant "TestWitness" from October/10 for07 days in China. 4) Travel India inSept./2011for 05 (five) days(excluding travel time) toreview Conceptual Drawingof Feasibility Report in orderto build 2*660 MW PowerPlant in Khulna. 5) Procurement of design,supply and installation of7.4 MW solar PV Gridconnected Power generationPlant at Kaptai from 06.07.15to 11.07.15 in Mexico &France.
1) PSCDP training Programnamed "Project Management(Batch-3)" from 15.12.13 to21.12.13
Thailand 1) Engineering Data &Drawing Sanction From17.10.03 for 10 Days In China 2) "Basic Design" againstSylhet 150MW Gas TurbinePower Plan from 28.07.10 to11.08.10 for 15 days in China. 3) PIM (Power ManagementInstitute) NTPC for 03 days atFebruary/11. 4) Technical Orientationagainst Construction ofPower Plant on 16th Floor ofBiddyut Bhaban in July/2011for 07 days in China. See N.B.
A proposal sent toministry dated10.05.16 forConstruction Drawingreview meetingagainst Barapukuria275 MW project from28.05.16 to 10.06.16 inChina.
N.B. 5) Inspection program on "Energy Efficient Buildings" from 12.03.13 to 18.03.13 in India. 6) Basic Engineering review meeting from 16.08.13 to 27.08.13 in China. 7) Detail engineering design review meeting against contruction of Bhola 225 MW CCPP from 30.03.14 to 12.04.14 in China. 8) Engineering review meeting (Basic Design & Drawing) against Shikalbaha 225 MW Duel-Fuel CCPP Project from 16.11.14 to 27.11.14 in India. 9) Construction Drawing Review Meeting against Barapukuria 275 MW Coal Based Power Plant from 15.01.16 to 21.01.16 in China. 10) Observation & Inspection of boiler factory against Barapukuria 275 MW P/S project from 7-13 April/2016 in China.
SE, Incharge 275 MW BarapukuriaCoal based Power PlantConstruction Project,PDB, Dhaka.
1)145KV and 36KV CT & PT(RRAGS) From 08.10.03 to08.01.04 for 03 Months 2003
China 1) To attend a course onProject Budgeting and CostControl from 09.12.12 to22.12.12 or from the date ofactual journey in Malaysia. 2) "Long-range EnergyAlternatives Planning Modelfor Greenhouse GasMitigation Assesment" from15.07.13 to 19.07.13 inThailand. 3) Witnessing ofmanufacturing process ofCoal mill journal againstBarapukuria P/S from 10-16March/2016 in China.
Page 22
3 1-01423 12.01.73 Mr. S.M. Zahid Hasan, Naugaon, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, in charge)
XEN, in charge 275 MW Barapukuria Coalbased Power PlantConstruction Project, PDB,Dhaka.
1) Training on GreaterChittagong Power DistributionProject Against 132/33KV Gas"Control Panel" for 25.11.07 to10.12.07 for 14 days. 2) Administration ofEnvironmental and socialconsideration process forimplementation from 18.05.08to 31.05.08 for 15 days 3) DAAD (Scholarship)Humboldt against "ProjectCycle Management" from17.08.09 to 11.09.09.(Selfarranged) 4) Attending the CounterpartTraining Program of JICA inpower Sector from 28.11.12 to22.12.12.
China.
Japan
Germany
Japan
1) Technical Orientation &Quality Test Witness at theManufacurer's Premisesagainst 11kv, 3x100KVAR AutoControlled Switched TypeCapacitor Bank completewith all Equipment &Accessories from 07.02.07 to15.02.07 in India. 2) Visit to establishprepayment e meteringthroughout the country inOctober/2011 in South Africaand England. 3) Inspection on "TechnicalOrientation & Quality testwitness" from 05.07.13 to14.07.13 for 10 days inSwitzerland. 4) Inspection of GE Machineagainst Bhola 225 MW CCPPConstruction Project from06.01.14 to 13.01.14 in Austria& Belfort.
XEN, in charge 275 MW Barapukuria Coalbased Power PlantConstruction Project, PDB,Dhaka.
1) JICA Counterpart trainingfrom 06.11.15 to 21.11.15
Japan
5 1-01802 07.12.79 Mr. Faozul Islam Shaker Sunamgonj B.Sc.Engr(Elec.) 01.06.09 (AE) 21.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge) 01712679792
XEN, in charge 275 MW Barapukuria Coalbased Power PlantConstruction Project, PDB,Dhaka.
1) Training on Power andEnergy sector from 02.04.16 to10.04.16
Japan 1) Inspection on CoalThermal Power Stationconstruction from 18.11.09 to24.11.09 for 07 days in India. 2) Approval of "ConstructionDrawings" aganist Sylhet150MW Combined CyclePower Plant ConstructionProject March/11 for 08(Eight)days in China.
Page 23
Meghnaghat 750 MW IPP-2, Power Plant Constrution ProjectSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Comments
USSR, 1)Saint-peters burg Ins. &Seminar of ProductionFacilities From 06.07.04 to19.07.04 In Russia 2) To inspect proposedmodel of HP & IP rotor forBoropukuria Steam PowerPlant as a member ofacceptence committee from13.10.04 to 26.10.04 for 14days in China 3) "Runner Hub" From20.02.09 to 26.02.09 for 08days in Italy. 4) Visit to Powership onKarkey (Allown with SecraryPower Division) KaradenizElektrik Utetim A.S agains115 MW Furnace Oil from07.07.10 for 01 days inSingapur. 5) Solar Power Utilization(Bangladesh) against KoreaInternational CooperationAgency (KOICA) from 11.10.10to 28.10.10 for 18 days inKorea. 5) Inspection & Equipmenttesting under PSCDP projectfrom 15.01.13 to 25.01.13 inItaly. 6) a conference "8th AnnualSmart Grid Asia 2013" from22.05.13 to 23.05.13 inThailand.
Page 24
Chapainawabganj100 MW Power Plant Construction ProjectSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
PD Chapainawabganj100MW Power PlantConstruction Project, PDB,Chapainawabganj. (CAMPoffice Dhaka)
1)145KV and 36KV CT & PT(RRAGS) from 08.10.03 to08.01.04 for 90 days
China 1) "Technical Orientationand Quality test Witness" inAugust/2011 for 10 (Ten) daysin China. 2) Technical orientation &quality test witness on 30Nos.- oil CentrifugingMachine from 29.11.13 to07.12.13 in China. 3) Basic design Approvalmeeting from20.08.15 to03.09.15 in China. 4)Factory test witness ofWartsila Engine andGenerator againstChapainawabganj 100 MWProject from 09.04.16 to17.04.16 in Finland
XEN, Incharge Construction Project, PDB,Chapainawabganj. (CAMPoffice Dhaka)
1) Shantahar 50 MW peakingpower plant arranged by M/s.Dongfang ElectricInternational Corporation(DEC), China from 22.09.12 for1 month
China 1) ''Managing Fuel forReliable Power Generation''from 13.12.10 to 15.12.10 inIndia. 2) "Approval of EngineeringDrawing Design & Data" forKatakhali, 50MW PeakingPower Plant ConstructionProject from 23.02.11 to01.03.11 for 07(Seven) days inChina. 3) Factory test witness of 3phase x-former againstChapainawabganj Powerplant cons. Project from23.04.16 to 01.05.16 in China.
Page 25
1320 MW Moheshkhali Coal Based Thermal Power Plant Construction Project, PDB, Cox'Bazar.SL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0642 31.05.60 Mr. Motahar Hossain, Chittagong, B.Sc.Engr.(Elec.),
1)SCADA System From 28.11.88to14.3.89 2)Training On Tower Design,Pole Design, etc. Operation &Maintenance Against Ctg.Distribution Project From08.07.04 for 06 Weeks 3) Training on 1132/33KV Sub-Station Power/ Transformer,33KV 11KV Gas InsulatedSwitchgear, 33/11KV Sub-station & Control Panel &Protection Equipment AgainstChittagong Power DistributionProject ''Design &Maintenance of 33KVCapacitor Bank'' 05.06.07 to21.08.07 for 42 days
UK
China
China
.A proposal sent toministry dated25.04.16 for FactoryAcceptance Testagainst Chitt. Zonepower dist. Dev.Project from 20.05.16to 26.05.16 in China.
Bibiana (South) 400 MW Power Plant Construction Project, PDB, sylhet.A157SL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0574 01.01.58 Mr. Mohammed KhorshedAlam Noakhili
Bibiyana (South) powerplant construction project,Dhaka.
1) 133/33/11KV Sub StationEquipment From 25.12.91 to31.3.922)Power Distribution Projectthrough promotion of TQMfrom 17.02.2004 to 20.03.2004
China,
Japan,
1) Inspection against “132KVTransformer from October/10for 07 days in China. 2) Factory Full Speed No LoadTest of Unit-2 GT againstShahjibazar 330 MW CCPPProject from 08.02.15 for 7days in Belfort, France.
Bibiyana (South) powerplant construction project,Dhaka.
1) Inspection on 14 MeterSteel Pole (450 daN-130 Nos.& 530 daN-70 Nos.), 11 MeterSteel Pole (350 daN-500 Nos)09 Meter Steel Pole (200 daN-330 Nos & 300 daN -17 Nos)''Test in addition to FactoryTest'' from 24.01.08 to30.01.08 for 07 Days in China 2) Inspection of generatortest against Bibiana southproject from 09.05.16 to15.05.16 in Germany.
Page 26
3 1-0943 01.01.60 Mr. Belal AhmedChowdhuri,Sylhet B.Sc.Engr.(Elec.),
Bibiyana (South) powerplant construction project,Dhaka.
1)Factory Test Witness From20.01.2004 to 25.01.2004 inIndia. 2)Orientation & TechnicalTraining from 28.01.05 for 05days in India. 3) Pre-Paiyment Metaringfrom 09.02.07 to 12.02.07 inSouth Africa. 4) "Gas Turbine Model V94.2Inspection" for Sylhet 150MWCombined Cycle Power PlantConstruction Project from 25-01-2011 to 30-01-2011 for06(Six) days in Italy. 5) "Pre- shipment inspectionof design, supply andinstallation of 400 kw solarphotovoltaic power plantwith associated distributionline construction works ofturnkey basis" from 9-15march/2014 in China 6) Rotor final balancing testfor the gas turbine againstBibiana south 400 MW CCPPproject from 25.01.16 to03.02.16 in Gremany.
XEN (incharge) Bibiana (South) PowerPlant Construction Project,PDB, sylhet.
1) Attending the CounterpartTraining Program of JICA inpower Sector from 28.11.12 to22.12.12.
Japan 1) 132KV SwitchgearEquipment Inspectionagainst Bhera 70MW PeakingPower Plant Construction Project fromOctober/10 for 07 days inIndia. 2) Technical orientation &quality test witness of 33 KVACR from 27.01.15 to 02.02.15in South Korea.
5 1-01328 12.06.72 Mr. Md. Azizur Rahman, Dhaka, B.Sc.Engr.(Mech.),
PD (Incharge) Ghorasal 3rd Unit Re-Powering Project, PDB,Narshindi.
1) Hydro Electric PowerEngineering for Stable &Sustainable Supply , JicaJapan 04.06.06 to 12.07.06 for39 days 2) PSCDP Training on"Performance Management"from 26.08.13 to 06.09.13
Japan.
Thailand
1) Technical Orientation andQuality Test Witness" from04.12.10 to 14.12.10 for 07days in China. 2) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.
2 1-01579 03.09.58 Mr. Md. Zia Uddin Chandpur, Diploma(Mach),
21.08.78(SAE),
27.03.03(AE), 10.02.10(SDE) 09.02.14 (XEN)
XEN (Incharge) Ghorasal 3rd Unit Re-Powering Project, PDB,Narshindi.
Ghorasal 4th Unit Re-Powering Project, PDB, NarshindiSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
PD (Incharge) Ghorasal 4th Unit Re-Powering Project, PDB,Narshindi.
1) Operation & Maintenanceof Thermal Power Station(Design Field ) of Khulna110/60MW P/St. UnderRehabilitation From 18.05.99to 15.08.99 (3 three Months)
China, 1)SF6 Circuit Breaker PracticalDemonstration from 16.02.03to 23.02.03, 07 days in India, 2) Orientation & TechnicalTraining against (PPRP)Khulna on Spares &Consumables from08.12.04.04 for 07 days inCzech Republic 3) Inspection & Factory TestWitnessing at Manufacture'sFactory for the RotorIntegrated Inspection for GTUnit-3 from 19.02.08 to28.02.08 to 10 days, in Japan.
4) "Diverse Solutions for theRegions Power IndustryChallenges" from 27-09-2011to 29-09-2011 for 03 (Three)days in Malaysia. 5) Witnessing ofmanufacturing processagainst Haripur PowerStation from 14.12.14 to20.12.14 in Japan.
Page 28
2 1-01436 10.10.71 Mr. Md. Shafiqul Islam, Gaibandha, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, in charge) 22.02.16 (XEN) 01714-012287
XEN Ghorasal 4th Unit Re-Powering Project, PDB,Narshindi.
1)Technical Training forengineers in Oil, Gas andPetrochemicalIndustries(MTCP),12-11-06 to27-11-06 in Malaysia.
G.O. issued dated14.03.2016 forObservation &inspection of steamturbine againstBarapukuria 275 MWproject from 13/06/16to 04/07/16 in China.
Ghorasal 6th Unit Re-Powering Project, PDB, NarshindiSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
Ghorasal 6th Unit Re-Powering Project, PDB,Narshindi
1)Traning on Gas TurbinePower Station Against Tongi80 MW From 25.07.04 To ThreeMonth 2) Operation & maintenanceof steam turbine from 28.10.13to 08.11.13
China,
India
Inspection on PlantEquipment from 16.1.11 to22.1.11 in Phillipines.
Conversion of Sylhet 150 MW GT to 225 MW CCPP Project, PDB, DhakaSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-01690 01.03.76 Mr.Khan Muhammad Ali Bhola B.Sc.Eng(Elec) 06.2006(AE) 27.12.2011(SDE) 01.10.14 (XEN, Incharge) 0167-8177382
XEN (Incharge) Conversion of Sylhet 150MW GT to 225 MW CCPPProject, PDB, Dhaka
1) ''Factory Training" againstDaudkandi 50MW PeakingPower Plant ConstructionProject for 30(Thirty) daysfrom 30.05.2011 to 30.06.2011(Excluding travel time) (Bond for 5 years) 2) "Clean DevelopmentMechanism" from 27.01.13 to01.02.13.
China
Indonesia
1) 132KV Current Transformer& Voltage Transformeragainst Dawadkandi 50MWPeaking Power Plant from13.11.10 to 22.11.10 for 07days in China.
Page 29
Shirajganj 300-400 MW Power Plant Construction ProjectSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0684 12.01.60 Mr. Shahadat HossainKhan Eusufzai, Mymensing, B.Sc.Engr.(Mech.),
SE (Incharge) O & M Circle, PDB,Mymensingh. & PD (Addl. Charge) Shirajganj 300-400 MWPower Plant ConstructionProject
1) 7 transmission Project inFrance for 06 weeks,1994 2) Purchasing Double tariffnon-programmable energymeter from 30.10.12 to09.11.12 in India. 3) Witnessing ofmanufacturing processagainst Chandpur 150 MWCCPP from 21.04.15 to 27.04.15in China.
Moheshkhali 2Ă—600-700 MW Ultra Super Critical Coal based Power Plant Construction ProjectSL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
PD (Addl. CE, Incharge) Moheshkhali 2Ă—600-700MW Ultra Super CriticalCoal based Power PlantConstruction Project (Unit-1 & 4), Moheshkhali, PDB,Dhaka
1) 90 MW. CCPP operationMaintenance From 01.10.94 to24.12.94 2)“Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1(Turbine Division, BoilerDivision, Electrical Division,Instrument & Control Division,Operation Division) fromAugust/10 for 15 days
Japan 1)Factory Inspection,Technology Transfer &Orientation ProgrammeAgainst Barupukuria From21.06.04 to 23.06.04 In China. 2) Witnessing ofmanufacturing processagainst shikalbaha 150 MWP/S from 18.11.15 to 24.11.15in China.
2 1-01687 01.01.75 Mr. Md. Monjurul Alam Sirajgong B.Sc.Eng(Civil) 06.2006(AE) 27.12.2011(SDE) 22.03.15 (XEN, Incharge)
XEN, Incharge Moheshkhali 2Ă—600-700MW Ultra Super CriticalCoal based Power PlantConstruction Project,Moheshkhali, PDB, Dhaka
Training on Operation &Maintenance from 01.05.16 to15.06.16
India 1) Tests and/or Inspectionagainst 8 mm dia and 9 mmdia 3500 Quintal HighTensile Steel (HTS) Wire for10 days in China.
Page 30
Renewable Energy dependent Power generation Pilot Project at Inexcessable Haor Area. SL.NO. ID No. Date of
BirthName, Dist, Qualification and
Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments