Top Banner
Environmental Footprinting of Organisations MSc thesis Industrial Ecology Sanne de Groot 14 November 2013 Imagine the result
17
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Oef arcadis 1106_nl

Environmental Footprintingof Organisations

MSc thesis Industrial Ecology

Sanne de Groot14 November 2013

Imagine the result

Page 2: Oef arcadis 1106_nl

IntroductionIndustrial Ecology at ARCADIS

Leiden University - Institute of Environmental Sciences

Reinout Heijungs

TU Delft - Technology, Policy and Management

Ellen van Bueren

Arcadis Nikki Spapens

Bianca Nijhof

Koen Seghers

| 6 november 2013 | © ARCADIS 2013Dia 2

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

Context

D. Tool

Page 3: Oef arcadis 1106_nl

Context

ARCADIS is a member of LfN network

• Incorporating biodiversity

• Internal actions

• Business opportunities

• Need for full range of environmental

aspects

• CO2,

• Water,

• Land use,

• Materials

• Multiple sectors

| 6 november 2013 | © ARCADIS 2013Dia 5

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

Context

D. Tool

Page 4: Oef arcadis 1106_nl

Goals

• Product for the market

• Component database

• Avoid missing environmental aspects

• ReCiPe

• Existing methods

• Carbon Footprint

| 6 november 2013 | © ARCADIS 2013Dia 7

2. Benefits

3. Boundary

1. Goals

4. Methods

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

D. Tool

Context

Page 5: Oef arcadis 1106_nl

Boundary

Environmental impacts

• Focus on biodiversity

| 6 november 2013 | © ARCADIS 2013Dia 8

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

D. Tool

Context

2. Benefits

3. Boundary

1. Goals

4. Methods

Page 6: Oef arcadis 1106_nl

Benefits

• Regulatory risks

Stringent regulations without proactive actions

• Reputational risks

• Market and product risks

Competitive advantage and added value

• Cost reductions

Energy saving, reduction in resource use, etc.

• Operational risks

Supply chain is depending on resources

Indirect emissions could increase costs

• Financing risks

| 6 november 2013 | © ARCADIS 2013Dia 9

2. Benefits

3. Boundary

1. Goals

4. Methods

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

D. Tool

Context

Page 7: Oef arcadis 1106_nl

Methods

EF

Carbon Footprint

ReCiPe

• Combined human toxicity

• Land occupation

Organisational Environmental Footprint (OEF)

• Location specific

• Acidification,

• Terrestrial Eutrophication

• Water depletion

• Combined resource consumption| 6 november 2013 | © ARCADIS 2013Dia 11

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

D. Tool

Context

2. Benefits

3. Boundary

1. Goal

4. Methods

Page 8: Oef arcadis 1106_nl

Component database

Generic environmental impact data of certain

measures

| 6 november 2013 | © ARCADIS 2013Dia 12

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

D. Tool

Context

2. Structure

3. Component

database

1. Overview

4.

Page 9: Oef arcadis 1106_nl

Scope 1

in

scopes

1/2/3/3+

Scope 2

Scope 3

Impact assessment

| 6 november 2013 | © ARCADIS 2013Dia 13

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

Context

D. Tool

1 kWh electrici ty mix, NL

Global Warming [kg CO2-eq] kg CO2-eq

Sulphur emiss ions [kg SO2] mol H+ eq

Nitrogen oxide emiss ions [kg NOx eq] mol N eq

Freshwater eutr. [kg P to freshw.] kg P to freshw.

Marine eutr. [kg N to freshwater] kg N to freshw.

Terrestria l ecotox. [kg 1,4-DB eq] kg 1,4-DB eq

Freshw. ecotox. [kg 1,4-DB eq] kg 1,4-DB eq

Marine ecotox. [kg 1,4-DB eq] kg 1,4-DB eq

Agr. Land occ. [yr*m2] yr*m2

Urban land occ. [yr*m2] yr*m2

Nat. land transf. [m2] m2

Ozone depletion [kg CFC-11 eq] kg CFC-11 eq

Human toxici ty [kg 1,4-DB eq] kg 1,4-DB eq

Photochemica l ozone f.[kg NMVOC] kg NMVOC

Particulate matter [kg PM10 eq] kg PM10 eq

Ionis ing radiation [kg U235 eq] kg U235 eq

Water consumption [m3] m3 eq

Minera l cons . [kg Fe eq] kg Sb eq

Foss i l cons . [kg oi l eq]

Impact

assessm

ent,NL

Component:

Page 10: Oef arcadis 1106_nl

EnFOrsEnvironmental Footprinting of Organisations

• Geharmoniseerd met OEF-Guide van EC

• 18 milieu indicatoren

• 3 Niveaus: Organisatie - Locatie – Product

• LCA methodiek desgewenst inclusief

upstream en downstream

• Tijdsefficiënte assessment

• Hotspot identificatie

• Vergelijking met referentie

• Besluitvorming adhv alternatieve

componenten| 6 november 2013 | © ARCADIS 2013Dia 14

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

D. Tool

Context

Page 11: Oef arcadis 1106_nl

Steps

1. Doel en afbakening

2. Input van bedrijfsspecifieke data (inventory)

3. Omrekening naar impact categorieën

4. Resultaten, vergelijking met referenties

| 6 november 2013 | © ARCADIS 2013Dia 16

2. Input

3. Results

1. Goal and scope of

study

4. Interpre-tation and reporting

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

Context

D. Tool

Page 12: Oef arcadis 1106_nl

Goal and Scope

| 6 november 2013 | © ARCADIS 2013Dia 18

ORGANISATION

LOCATION B

SUPPLY CHAIN 1• Niveau bepaling

• Scoping

2. Input

3. Results

1. Goal and scope of

study

4. Interpre-tation and reporting

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

Context

D. Tool

Page 13: Oef arcadis 1106_nl

Scope 1

in

scopes

1/2/3/3+

Scope 2

Scope 3

Amount input

| 6 november 2013 | © ARCADIS 2013Dia 19

2. Input

3. Results

1. Goal and scope of

study

4. Interpre-tation and reporting

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

1 kWh electricity mix, nl

Global Warming [kg CO2-eq] 0,1371119

Acidification [kg SO2 eq] 0,0006243

Freshwater eutr. [kg P to freshw.] 0,000146

Marine eutr. [kg N to freshwater] 3,897E-05

Terrestrial ecotox. [kg 1,4-DB eq] 3,584E-05

Freshw. ecotox. [kg 1,4-DB eq] 0,002442

Marine ecotox. [kg 1,4-DB eq] 0,0025941

Agr. Land occ. [yr*m2] 0,0033208

Urban land occ. [yr*m2] 0,0006602

Nat. land transf. [m2] 2E-05

Terr. eutr. [mol N eq] 0,0055957

Ozone depletion [kg CFC-11 eq] 1,818E-08

Human toxicity [kg 1,4-DB eq] 0,161869

Photochemical ozone f.[kg NMVOC] 0,0003255

Particulate matter [kg PM10 eq] 0,0002336

Ionising radiation [kg U235 eq] 0,7104028

Water depletion [m3 eq] 0,0048533

Mineral, fossil cons. [kg Sb eq] 0,0174815

Amount input

1.422.114 kWh,NL

Context

D. Tool

Component:

Page 14: Oef arcadis 1106_nl

Scope 1

in

scopes

1/2/3/3+

Scope 2

Scope 3

Results

| 6 november 2013 | © ARCADIS 2013Dia 20

2. Input

3. Results

1. Goal and scope of

study

4. Interpre-tation and reporting

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

Scope 1

in

scopes

1/2/3/3+

Scope 2

Scope 31 kWh electricity mix, nl

Global Warming [kg CO2-eq] 0,1371119 194.989

Acidification [kg SO2 eq] 0,0006243 888

Freshwater eutr. [kg P to freshw.] 0,000146 208

Marine eutr. [kg N to freshwater] 3,897E-05 55

Terrestrial ecotox. [kg 1,4-DB eq] 3,584E-05 51

Freshw. ecotox. [kg 1,4-DB eq] 0,002442 3.473

Marine ecotox. [kg 1,4-DB eq] 0,0025941 3.689

Agr. Land occ. [yr*m2] 0,0033208 4.723

Urban land occ. [yr*m2] 0,0006602 939

Nat. land transf. [m2] 2E-05 28

Terr. eutr. [mol N eq] 0,0055957 7.958

Ozone depletion [kg CFC-11 eq] 1,818E-08 0

Human toxicity [kg 1,4-DB eq] 0,161869 230.196

Photochemical ozone f.[kg NMVOC] 0,0003255 463

Particulate matter [kg PM10 eq] 0,0002336 332

Ionising radiation [kg U235 eq] 0,7104028 1.010.274

Water depletion [m3 eq] 0,0048533 6.902

Mineral, fossil cons. [kg Sb eq] 0,0174815 24.861

Amount input

1.422.114 kWh,NL

Context

D. Tool

Component:

Page 15: Oef arcadis 1106_nl
Page 16: Oef arcadis 1106_nl

Conclusies

• Compleet beeld (impact categorieën en

levenscyclus)

• Tijd efficiënte studie

• Vergelijking met sector gemiddelden

• Ondersteunen besluitvorming

• Input voor andere milieu standaarden (e.g.

ISO 14000, EMAS, prestatieladder Carbon

Disclosure Project)

| 6 november 2013 | © ARCADIS 2013Dia 22

B. Component

database

A. Goal and scope of method

C. Steps

E. Evaluation

Context

D. Tool

Page 17: Oef arcadis 1106_nl

| 6 november 2013 | © ARCADIS 2013Dia 23