OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core Concrete Interaction (CCI) Tests: CCI-2 Test Plan Rev. 0 January 31, 2004 by: M. T. Farmer, D. J. Kilsdonk, S. Lomperski, and R. W. Aeschlimann Nuclear Engineering Division Argonne National Laboratory 9700 S. Cass Avenue Argonne, IL 60439 USA S. Basu Project Manager U.S. Nuclear Regulatory Commission
18

OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

May 16, 2018

Download

Documents

hakien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

OECD/MCCI-2004-TR02

OECD MCCI Project

2-D Core Concrete Interaction (CCI) Tests:

CCI-2 Test Plan

Rev. 0

January 31, 2004

by:

M. T. Farmer, D. J. Kilsdonk, S. Lomperski, and R. W. Aeschlimann Nuclear Engineering Division Argonne National Laboratory

9700 S. Cass Avenue Argonne, IL 60439 USA

S. Basu

Project Manager U.S. Nuclear Regulatory Commission

Page 2: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

i

Table of Contents

1. INTRODUCTION.......................................................................................................................1

2. FACILITY DESCRIPTION ......................................................................................................3

2.1 Test Apparatus ......................................................................................................................3

2.2 Instrumentation and Data Acquisition ..................................................................................7

2.3 Corium Composition.............................................................................................................11

2.4 Concrete Composition ..........................................................................................................12

3. TEST PROCEDURES................................................................................................................13

3.1 Pretest Preparations...............................................................................................................13

3.2 Test Operations .....................................................................................................................13

3.3 Posttest Procedures ...............................................................................................................14

4. REFERENCES...........................................................................................................................14

Page 3: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

ii

List of Figures Figure Page 2-1 Schematic of CCI Test Facility ................................................................................................4 2-2 Top View of Lower Test Section .............................................................................................4 2-3 Side View of Lower Test Section Showing Inert MgO Sidewall Sections..............................5 2-4 Side View of Lower Test Section Showing Concrete Sidewall Section ..................................6 2-5 Test Section Water Supply System ..........................................................................................7 2-6 Illustration of CCI-2 Crust Lance Assembly Mounted in Test Section ...................................8 2-7 Plan View of Basemat Instrumentation Layout (dimensions are in cm)..................................9

2-8 Elevation View of Basemat Type C Thermocouple Locations ................................................10 2-9 CCI Data Acquisition and Control Systems.............................................................................11

List of Tables Table Page 1-1 Specifications for CCI-2...........................................................................................................2 2-1 Post-Reaction Bulk Composition for CCI-2 Thermite (Fully Oxidized PWR Corium Containing 8 wt % Limestone/Common Sand Concrete at ~2100 ˚C).....................................12 2-2 Detailed Pre- and Post-Reaction Compositions for CCI-2 Thermite .......................................12 2-3 Chemical Composition of Limestone/Common Sand Concrete...............................................13

Page 4: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

1

1.0 INTRODUCTION The Melt Attack and Coolability Experiments (MACE) program addressed the issue of the ability of water to cool and thermally stabilize a molten core-concrete interaction when the reactants are flooded from above. These tests provided data regarding the nature of corium interactions with concrete, the heat transfer rates from the melt to the overlying water pool, and the role of noncondensable gases in the mixing processes that contribute to melt quenching. As a follow-on program to MACE, The Melt Coolability and Concrete Interaction Experiments (MCCI) project is conducting reactor material experiments and associated analysis to achieve the following objectives:

i. resolve the ex-vessel debris coolability issue through a program that focuses on providing both confirmatory evidence and test data for the coolability mechanisms identified in MACE integral effects tests, and

ii. address remaining uncertainties related to long-term two-dimensional molten core-concrete interactions under both wet and dry cavity conditions. Achievement of these two program objectives will demonstrate the efficacy of severe

accident management guidelines for existing plants, and provide the technical basis for better containment designs for future plants.

In terms of satisfying these objectives, the Management Board (MB) approved the conduct of two long-term 2-D Core-Concrete Interaction (CCI) experiments designed to provide information in several areas, including: i) lateral vs. axial power split during dry core-concrete interaction, ii) integral debris coolability data following late phase flooding, and iii) data regarding the nature and extent of the cooling transient following breach of the crust formed at the melt-water interface. The first of these two tests, CCI-1, was conducted on December 19, 2003.1 This test investigated the interaction of a fully oxidized 400 kg PWR core melt, initially containing 8 wt % calcined siliceous concrete, with a specially designed two-dimensional siliceous concrete test section with an initial cross-sectional area of 50 cm x 50 cm.

The second of these two planned tests, CCI-2, will be conducted with a nearly identical test facility and experiment boundary conditions, but with a Limestone/Common Sand (LCS) concrete test section to investigate the effect of concrete type on the two-dimensional core-concrete interaction and debris cooling behavior. The objective of this report is to provide the overall test plan for CCI-2 to enable pretest calculations to be carried out. The report begins by providing a summary description of the CCI-2 test apparatus, followed by a description of the planned test operating procedure. Overall specifications for CCI-2 are provided in Table 1-1.

Page 5: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

2

Table 1-1. Specifications for CCI-2.

aBased on an assumed melt density of 6500 kg/m3

Parameter Specification Corium 100 % oxidized PWR with 8 wt % LCS concrete Concrete type Limestone/common sand (LCS) Initial basemat dimension 50 cm x 50 cm Initial melt mass (deptha) 400 kg (25 cm) Test section sidewall construction Nonelectrode walls: concrete

Electrode walls: MgO protected by UO2 pellet layer. Radial ablation limit 35 cm Axial ablation limit 35 cm System operating pressure Atmospheric Melt formation technique (timescale) Chemical reaction (~30 seconds) Initial melt temperature 2100 C Melt heating technique Direct Electrical (Joule) Heating Power supply operation prior to water addition

Constant power at 150 kW

Criteria for water addition 1) 5.5 hours of operation with DEH input, or 2) radial or axial ablation reaches 30 cm

Inlet water temperature 20 C Inlet water flow rate (2 MW/m2 equivalent quench rate)

2 liters/second

Sustained water depth over melt 50 ± 5 cm Power supply operation after water addition

Constant voltage

Test termination criteria 1) Melt temperature falls below concrete solidus, 2) basemat ablation is arrested, or 3) maximum radial/axial ablation limit of 35 cm is reached.

Page 6: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

3

2.0 FACILITY DESCRIPTION

2.1 Test Apparatus

The CCI test facility consists of a test apparatus, a power supply for Direct Electrical Heating (DEH) of the corium, a water supply system, two steam condensation (quench) tanks, a ventilation system to complete filtration and exhaust the off-gases, and a data acquisition system. A schematic illustration of the facility for CCI-2 is provided in Figure 2-1, while test specifications are provided in Table 1-1. The apparatus for containment of the core material consists of a test section that is ~ 3.4 m tall with a square internal cross-section which measures 50 cm x 50 cm. The concrete crucible is located at the bottom of the test section. A top view of this component is shown in Figure 2-2, while cross-sectional views of the electrode and non-electrode sidewalls are provided in Figures 2-3 and 2-4, respectively. As is evident from these figures, the concrete basemat has a cross-sectional area of 50 cm x 50 cm, and is 55 cm deep. Thus, up to 35 cm of axial ablation can be accommodated in the current design.

As shown in Figure 2-2, the electrode sidewalls are fabricated from castable MgO refractory, while the non-electrode sidewalls are fabricated from concrete. The concrete and MgO are contained within a flanged steel form that is used to secure the lower section to the balance of the existing test section components with an aluminum transition plate. The lower section is fabricated with vertical, flanged casting seams between the MgO and concrete so that the lower sidewalls can be disassembled to reveal the solidified corium following the test. The MgO sections are intended to be reusable, while the concrete sidewall remnants will be disposed of as radioactive waste. A layer of crushed UO2 pellets is used to protect the interior surface of the MgO sidewalls against thermo-chemical attack by the corium. In the event that the UO2 layer does not provide adequate protection, then tungsten back-up plates are embedded in these sidewalls as a final barrier to terminate sidewall attack. Multi-junction Type C thermocouple assemblies are cast within the sidewalls so that the time-dependent heat loss from the melt can be calculated from the local temperature gradient and the thermal conductivity of the MgO. Melt generation is achieved through an exothermic chemical reaction yielding the target initial melt mass over a timescale of ~ 30 seconds. After the chemical reaction, DEH is supplied to the melt to simulate decay heat through two banks of tungsten electrodes. As shown in Figures 2-2 and 2-3, the electrodes line the interior surfaces of the two opposing MgO sidewalls. The electrodes are 9.5 cm in diameter and are pitched at 1.9 cm intervals. They are attached by copper clamps and water-cooled buss bars to 560 kW AC power supply. As shown in Figure 2-2, the electrodes span a total width of 120 cm on each sidewall of the lower section. At the start of the experiment, the electrical current is drawn through the center 50 cm lateral span of electrodes that are in direct contact with the melt. As the test progresses and the concrete sidewalls are eroded, additional electrodes are exposed to the corium. Current is drawn through these newly exposed heating elements, thereby maintaining a uniform internal heat pattern in the melt over the course of the experiment. Given the overall electrode span of 120 cm, then up to 35 cm of radial sidewall ablation can be accommodated in this design while maintaining uniform heat input. As shown in Figure 2-4, the concrete sidewalls have been designed to be 56 cm thick, which provides ~ 20 cm of remaining sidewall thickness once the 35 cm radial ablation limit has been reached.

Page 7: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

4

P

DRAIN OR FILL

PUMP

TEST SECTION QUENCH TANK

FMTC

WATER IN WATEROUT

TC

CORIUM

CONCRETE

BY-PASS LINE

WATER SPRAY

BELLOWS

FILTERS

6 INCH LINE

175 GAL

320 GAL

(5)

BELLOWS

(2)

TC

FMCELLEXHAUST

TC

P

TC

TC

TC

LS

LS

DRAWING: CCI2 TEST APPARATUSDRAWING NO.: MCCI378DRAWN BY: D. KILSDONKDATE: 1/27/04FILE: CCI2_TA.DWG(AC100)

SPRAY TANK Figure 2-1. Schematic of CCI Test Facility.

A

TOP VIEW

DRAWING: CCI2 BOTTOM SECTION(TOP VIEW) DRAWING NO.: MCCI379DRAWN BY: D. KILSDONK 2-4746DATE: 1/27/04 FILE: CCI2_BSTV.DWG(AC100)

ELECTRODE SUPPORT ROD (9.5 mm OD TUNGSTEN)

68.50" [174.0cm]

45.25" [114.9cm]

CRUSHED PELLETS

TUNGSTEN BACKUP PLATES

A

NORTH

TUNGSTEN ELECTRODES(9.5 mm OD)

LIFTING LUGS

BASEMAT(50 cm X 50 cm)

CONCRETE SIDEWALLS (2)56.2 cm THICK, MAXIMUM ABLATIION DEPTH = 35 cm

MgO REFRACTORY SIDEWALLS

B

B

50 cm

50 cm

19.75" [50.2cm]

22.13" [56.2cm]

Figure 2-2. Top View of Lower Test Section.

Page 8: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

5

AT CENTER LINE

INITIAL POWDER HEIGHT

COLLAPSED MELTHEIGHT

DRAWING: CCI2 BOTTOM SECTION(SOUTH VIEW) DRAWING NO.: MCCI376DRAWN BY: D. KILSDONK 2-4746DATE: 1/27/04 FILE: CCI2_BSSV.DWG(AC100)

VIEW FROM SOUTHWEST EAST

0

-30

-45-50

-40

-35

-15

-25

-20

-10

-5

+ 15

+ 5

+ 10

+ 25

+ 20

+ 35

cm

+ 30

+ 65

+ 60

+ 55

+ 50

+ 45

+ 40

+ 70

+ 75

+ 80

+ 85

36.0" [91.4cm]

ALUMINUM TRANSITION PLATE (1" THICK)

EXISTING MACE 50 cm X 50 cm MgO TEST SECTION

TUNGSTEN ELECTRODES

47.0" [119.4cm]TUNGSTEN BACKUP PLATES

SWHL 1-4

SWHL 9-12

SWHL 5-8

SWHL 13-16

MgO BRICKS

CRUSHED PELLETS

MgO REFRACTORY SIDEWALLS

55 cm

25 cm

BASEMAT

MgO BRICKS

Figure 2-3. Side View of Lower Test Section Showing Inert MgO Sidewall Sections.

Page 9: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

6

BASEMAT

55 cm

TUNGSTEN ELECTRODES

CONCRETE SIDEWALLS

INITIAL POWDER HEIGHT

ALUMINUM TRANSITION PLATE (1" THICK)

EXISTING MACE 50 cm X 50 cm MgO TEST SECTION

NORTH SOUTHVIEW FORM WESTAT CENTER LINE

IBEAM

ELECTRODE CLAMP

47.0"

1.00"

8.0"

-50

-45

-35

-40

-30

-20

-25

-15

-5

-10

0

+ 10

+ 5

+ 15

+ 75

+ 45

+ 30

+ 20

+ 25

+ 40

+ 35

+ 60

+ 50

+ 55

+ 70

+ 65

+ 80

+ 85cm

-55 DRAWING: CCI2 BOTTOM SECTION(WEST VIEW) DRAWING NO.: MCCI377DRAWN BY: D. KILSDONK 2-4746DATE: 1/27/04 FILE: CCI2_BSWVC.DWG(AC100)

TYPE C TC IN TUNGSTEN THERMOWELL

TYPE K TC'S

TYPE K TC'S

MgO INSULATION

SWK

SWIWNSWG

SWE

SWC

SWA

SWL

SWJWSSWH

SWF

SWD

SWB

Figure 2-4. Side View of Lower Test Section Showing Concrete Sidewall Sections.

A few minutes after the melt is formed, core-concrete interaction with the concrete

basemat and sidewalls will begin. As shown in Figure 2-1, a large (15 cm diameter) gas line is used to vent the helium cover gas and the various gas species arising from the core-concrete interaction (i.e., CO, CO2, H2O, and H2) into two adjacent tanks that are partially filled with water. In the initial phase of the experiment when the cavity remains dry, the tanks serve to cool the off-gases and filter aerosols generated from the core-concrete interaction. In the late phase after the cavity is flooded, the tanks serve to condense the steam and, based on the measured condensation rate, provided data on the corium cooling rate. In either case, the helium covergas and non-condensables (CO, CO2, and H2) pass through the tanks and are vented through an off gas system that includes a demister, filters, and a gas flow meter. The gases are exhausted through the containment ventilation system and a series of high efficiency filters before finally being released from the building stack.

Page 10: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

7

After a specified period of core-concrete interaction, the cavity will be flooded using an instrumented water supply system. The water enters the test section through two weirs located in the opposing (non-electrode) sidewalls of the top test section. The water supply system is shown in Figure 2-5.

After a specified time with water present in the cavity, the crust formed at the melt-water interface will be broken with an insertable crust lance to obtain data on the crust breach cooling mechanism. An illustration of the lance installed in the test section is shown in Figure 2-6. The lance is made from 2.54 cm diameter, 304 stainless steel rod with a pointed tip. The lance contains an electrical isolation hub so that there is no need to terminate power input to the melt during the crust loading procedure. As shown in Figure 2-6, the driving force for the lance is simply a 450 kg dead weight that is remotely lowered with the crane during the test. 2.2 Instrumentation and Data Acquisition

The CCI facility is instrumented to monitor and guide experiment operation and to log

data for subsequent evaluation. Principal parameters that are monitored during the course of the test include the power supply voltage, current, and gross input power to the melt; melt temperature and temperatures within the concrete basemat and sidewalls; crust lance position and applied load; supply water flow rate; water volume and temperature within the test apparatus, and water volume and temperature within the quench system tanks. Other key data recorded by the DAS includes temperatures within test section structural sidewalls, off gas temperature and flow rate, and pressures at various locations within the system.

NORTH

TOP VIEW

INSIDE ENCLOSURE

TOP TEST SECTION

WATERSUPPLYTANK

500 G(2000 L)

WS-1TC

P

PUMP

LS-1

PRESSURE RELIEFVALVE

MAGNETICFLOAT

RECIRCULATION

DRAIN/FILL

PT-1

RP-1

MV-WS-4

MV-WS-1 MV-WS-2

TV-WS-3

MV-WS-3

PT-2

TRAP

MV-WS-7 MV-WS-8

RV-5

FM-1

MV-WS-9

RV-1

RV-2

TV-WS-1

2" LINE

RV-3TV-WS-2

TO WEIRS

COMPRESSEDAIR

RV-4MV-WS-5

MV-WS-6

TRAP

PRESSUREGAGE

COMPRESSOR(IN PIT)

R1PI-1

RV-14BACKUP SUPPLYLINE FROMOVERFLOW/ SPRAYTANKS

COMPRESSEDAIR (BACKUP)

R12

MV-WS-10

VENTMUFFLER

(UNDER PLATFORM)

MV-WS-11

LEAKAGECOLLECTION/DETECTIONLINE

CCI2 WATER SUPPLY SYSTEM

DRAWING: CCI2 WATER SUPPLY SYSTEMDRAWING NO.: MCCI375DRAWN BY: D. KILSDONKDATE: 1/27/04 FILE: CCI2_WATER.DWG(AC100)

NOT USED

NOT USED

PROCEDURALLYCLOSED

PROCEDURALLYCLOSED

Figure 2-5. Test Section Water Supply System.

Page 11: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

8

38.75" [98.30 cm]

38.75" [98.43 cm]

13.25" [33.66 cm]

52.00" [132.08 cm]

INSULATOR

PROBE SHIELD

SEAL

LOAD CELL

POSITIONFULL OUT

POSITIONFULL IN

MgO BRICKS

CRUSHED PELLETS

MgO BRICKS

CCI2 IN-SITU CRUSTSTRENGTH MEASUREMENT

MgO REFRACTORY SIDEWALLS

55 cm

25 cm

BASEMAT

TUNGSTEN BACKUP PLATES

SWHL 1-4

SWHL 9-12

SWHL 5-8

SWHL 13-16

36.0" [91.4cm]

ALUMINUM TRANSITION PLATE (1" THICK)

EXISTING MACE 50 cm X 50 cm MgO TEST SECTION

TUNGSTEN ELECTRODES

47.0" [119.4cm]

DRAWING: CCI2 IN-SITU CRUSTSTRENGTH MEASUREMENT (SOUTH VIEW) DRAWING NO.: MCCI373DRAWN BY: D. KILSDONK 2-4746DATE: 1/27/04 FILE: CCI2_ISCSM.DWG(AC100)

VIEW FROM SOUTHWEST EAST

0

-30

-45-50

-40

-35

-15

-25

-20

-10

-5

+ 15

+ 5

+ 10

+ 25

+ 20

+ 35

cm

+ 30

+ 65

+ 60

+ 55

+ 50

+ 45

+ 40

+ 70

+ 75

+ 80

+ 85

AT CENTER LINE

INITIAL POWDER HEIGHT

COLLAPSED MELTHEIGHT

Figure 2-6. Illustration of CCI-2 Crust Lance Assembly Mounted in Test Section.

Page 12: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

9

Detailed plan and elevation views of the basemat thermocouple layout are provided in Figures 2-7 and 2-8, respectively, while the concrete sidewall instrumentation locations are shown in Figure 2-4. Both the basemat and sidewalls of the test section are instrumented with multi-junction Type K thermocouple assemblies to determine the 2-D ablation profile as a function of time. In addition, Type C thermocouple assemblies in tungsten thermowells protrude upwards from the basemat and radially inwards from the concrete sidewalls in several locations. The purpose of these instruments is to provide data on the axial and radial melt temperature distribution as a function of time.

Other significant test instrumentation includes a stationary (lid mounted) video camera for observing physical characteristics of the core-concrete interaction.

All data acquisition and process control tasks are managed by a PC executing LabVIEW 6.i under Windows XP. Sensor output terminals are connected inside the test cell to model HP E1345A 16-channel multiplexers, which are integrated into a mainframe chassis in groups of eight. An illustration of the DAS setup is provided in Figure 2-9. The multiplexers direct signals to an HP E1326B 5 ½ digit multimeter incorporated into each chassis. Three independent 128 channel systems are used for a total capacity of 384 channels

DRAWING: CCI2 TC LAYOUT50 cm X 50 cm BASEMAT (TOP VIEW)DRAWING NO.: MCCI374DRAWN BY: D. KILSDONK 2-4746DATE: 1/27/04 FILE: CCI2_TCL_TV.DWG(AC100)

-5

-25

-20

-25

-15

-10

+ 10

+ 5

0

+ 20

+ 15

+ 25

-20 -15 -10 -5 + 50 + 15+ 10 + 25+ 20

X

Y

MULTI-JUNCTION Cr/Al, INCONEL 600 SHEATH, TIP OF TC FLUSHWITH BASEMAT SURFACE (1 UNIT, 11 JUNCTIONS).LOCATIONS: 0.0, -1.3, -2.5, -5.1, -7.6, -11.4, -15.2, -19.1, -24.1, -29.2, -34.3 cm.

MULTI-JUNCTION W5Re/W26Re, TANTALUM SHEATH, TUNGSTENTHERMOWELL (5 UNITS, 4 JUNCTIONS EA.).

NOTE: ALL TC DIMENSIONS ARE CENTIMETERS

NORTH

CL

CLR = 18 cm

WNW (-10.6,+ 10.6)

B (-12.5, + 12.5)

A (0, -1.9)

WCL (0,1.9)

C (+ 12.5, + 12.5)

E (-12.5, -12.5) D (+ 12.5, -12.5)

WNE (+ 10.6,+ 10.6)

WSW (-10.6,-10.6) WSE (+ 10.6,-10.6)

MULTI-JUNCTION Cr/Al, INCONEL 600 SHEATH, TIP OF TC FLUSHWITH BASEMAT SURFACE (4 UNITS, 9 JUNCTIONS EA.).LOCATIONS: 0.0, -2.5, -5.1, -8.9, -14.0, -19.1, -24.1, -29.2, -34.3 cm.

Figure 2-7. Plan View of Basemat Instrumentation Layout (dimensions are in cm).

Page 13: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

10

0

+ 5

+ 10

+ 15

+ 20

-5

-10

-15

-20

-25

-30

-35

-40

-45

-50

-5

-35

-50

-45

-40

-20

-30

-25

-15

-10

+ 10

+ 5

+ 20

+ 15

COLLAPSED MELT DEPTH

TERMINATIONS (3")

TW= 14"35.6 cmL = 17"TC

38.1 cmL = 15"35.6 cmTW= 14"

TC

-1.5

-6.5

-16.5

-11.5

WSE

TW= 12"30.5 cmL = 13"33.0 cm

-12.0

-7.0

TC

-22.0

-17.0

WSW

-60

-55-55

-60

cm+ 25

cm+ 25

43.2 cm

CONCRETE

DRAWING: CCI2 TC LAYOUT50 cm X 50 cm BASEMAT (SIDE VIEW)DRAWING NO.: MCCI380DRAWN BY: D. KILSDONKDATE: 1/27/04 FILE: CCI2_TCL_SV.DWG(AC100)

NOTE: ALL TC LOCATIONS ARE cmTW = THERMOWELLX, Y LOCATIONS ARE RELATIVE TOCENTER OF BASEMAT

TOP OF BM SCREEN

TOP OF BASEMAT PLATE

LIMIT OF ABLATION

X LOCATION, cm

Y LOCATION, cm

0.0

1.9

-10.6

10.6 10.6

10.6

-10.6

10.6

-10.6

-10.6

CCI2 W/Re TC LAYOUT50 cm X 50 cm BASEMAT

15.0

0.0

5.0

WCL

10.0

43.2 cmL = 17"35.6 cmTW= 14"

TC

9.5

4.5

-5.5

-0.5

WNW

43.2 cmL = 17"35.6 cmTW= 14"

TC

4.0

-1.0

-11.0

-6.0

WNE

Figure 2-8. Elevation View of Basemat Type C Thermocouple Locations.

Page 14: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

11

75 O Coaxial Cable

HP E1345A16-Channel Multiplexer (x7)

HP E1326B5-1/2 Digital Multimeter

x3 HP 75000

+ -

Sensor

POWER SUPPLY

HalltiplierControl Panel

SCXI 110032 Channel MUX Amp

I, V

DRAWING: CCI2 DATA ACQUISITIONSYSTEMSDRAWING NO.: MCCI381DRAWN BY: D. KILSDONK 2-4746DATE: 1/28/04 FILE: CCI2_DAS.DWG(AC100)

MONITORS

PCI-GPIBPCI-6023E 200 kHz12-bit A/D

PC

HP-IBEXTENDER

GPIB Cable

TEST CELL WALL(1.5 m Concrete)

HP-IBEXTENDER

GPIB Cable

75 O Coaxial Cable

Figure 2-9. CCI Data Acquisition and Control Systems.

Signal noise is reduced by the digitizer through integration over a single power line cycle (16.7 ms). The digitized sensor readings are routed from the test cell to the PC in the control room via two HP-IB extenders. The extenders allow the ASCII data from the HP to be sent through the cell wall over a BNC cable. The extender within the control room then communicates with a GPIB card within the PC. This configuration also permits remote control of the multimeter through LabVIEW.

Integration of the signal over the period of a power line cycle limits the speed with which the multiplexer can scan the channel list. The minimum time for the digitizer to scan the channel list is ~1.7 s (16.7 ms • 100 channels/chassis for this test). Though the three systems operate independently, implying the ability to update all 300 channels in roughly two seconds, the actual time required for the update is about 5.5 s. 2.3 Corium Composition

As shown in Table 1-1, the corium composition for CCI-2 is specified to contain 8 wt % calcined LCS concrete as an initial constituent. As part of the developmental work for the SSWICS-1 experiment,3 a specific thermite was developed to produce this particular melt composition. The thermite reaction is of the form:

Page 15: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

12

1.22U3O8 + 3.3Zr + 0.6Si + 0.32SiO2 + 0.46Mg + 0.91 CaO + 0.13Al + 2.01CrO3 →

3.66UO2 + 3.3ZrO2 + 0.92SiO2 + 0.46MgO + 0.91CaO + 0.065Al2O3 + 2.01Cr;

Q = -262.2 kJ/mole (1.816 MJ/kg);

Tadiabatic = 2567 ˚C

Tactual ~ 2100 ˚C

The composition of the melt produced from this reaction is summarized in Table 2-1, while the detailed pre- and post-reaction compositions are provided in Table 2-2. Table 2-1. Post-Reaction Bulk Composition for CCI-2 Thermite (Fully Oxidized PWR

Corium Containing 8 wt % Limestone/Common Sand Concrete at ~2100 ˚C). Constituent Wt% Total Mass (kg)

UO2 60.62 242.48 ZrO2 24.90 99.60

Calcined Concrete 8.07a 32.28 Cr 6.41 25.64

Total 100.00 400.00 aCalcined limestone/common sand concrete, consisting of 42.0/14.1/38.8/5.1 wt% SiO2/MgO/CaO/Al2O3

Table 2-2. Detailed Pre- and Post-Reaction Compositions for CCI-2 Thermite.

Wt % Constituent Reactant Product

U3O8 63.01 - UO2 - 60.62 Zr 18.42 -

ZrO2 - 24.90 Si 1.03 -

SiO2 1.18 3.39 Mg 0.69 -

MgO - 1.14 Al 0.22 -

Al2O3 - 0.41 CaO 3.13 3.13 CrO3 12.32 -

Cr - 6.41 2.4 Concrete Composition

As shown in Table 1-1, limestone/common sand concrete is specified for CCI-2. The nominal composition for this concrete is provided in Table 2-3. This concrete is identical to that used in the ACE/MCCI and MACE experiment programs.

Table 2-3. Chemical Composition of Limestone/Common Sand Concrete.

Page 16: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

13

Constituent Wt% SiO2 28.3 MgO 9.6 CaO 26.0

Al2O3 3.5 K2O 0.6

Fe2O3 1.6 TiO2 0.14 Na2O 1.1 H2O 6.1 CO2 21.4

3.0 TEST PROCEDURES 3.1 Pretest Preparations

Assembly of the apparatus begins through the installation of tungsten electrodes into machined copper electrode clamps. The electrode clamps are then attached to the bottom of the 1.9 cm thick aluminum support plate, which serves as the foundation for the entire apparatus. With the electrode clamps installed, the support plate is moved into position on the test stand. The instrumented basemat and lower section sidewall components (four total) are then set in place on the support plate. The lower section flange bolts and clamping bars are then installed and tightened. Following this step, the basemat instruments are connected to terminal boxes that are prewired to the data acquisition system. Once the lower section is assembled, preparations for loading of the corium charge are initiated. A single large 1.7 mil aluminized Saran bag is preinstalled over the basemat. During loading, most of the thermite is repackaged into this single bag in order to reduce the amount of bagging material present in the thermite charge. Once the large Saran bag is filled with thermite, the sparklers used to initiate the chemical reaction are placed in the top of the powders, and the bag is folded and sealed. Tungsten starter coils (4 total) for initiating the thermite reaction are then connected near the tops of the electrodes and laid on top of the large Saran bag. Once loading is completed, the remainder of the test apparatus is assembled. This includes installation of the two upper sections and the enclosure lid. Peripheral instrumentation, including the lower section sidewall Type K TC’s used to monitor the radial ablation progression, is then installed and connected to terminal boxes. The main gas line from the test section to the quench tank is installed, as well as the pressure relief line from the test section to the auxiliary tank. After assembly is completed, system checkout is performed to ensure that the facility is in proper working order. This includes a proof test of the test section at 83 kPad, which is 20 % in excess of the pressure relief system activation pressure of 69 kPad. 3.2 Test Operations

Prior to initiating the thermite reaction, a helium gas flow rate is established through the lid of the test section. The thermite is ignited using the sparklers located at the top of the powder charge. Once the reaction is complete (~ 30 seconds), the power supply is ramped at a rate of ~ 3000 Amps/minute up to the initial target power level. As shown in Table 1-1, target power for

Page 17: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

14

the dry core-concrete interaction phase of the test is 150 kW. After melt formation, the input power would be held constant at the 150 kW target for 5.5 hours of dry core-concrete interaction, or until a 30 cm ablation depth was reached in either the radial or axial directions. After one of these two criteria was met, the cavity would then be flooded. However, if a crust was present at the melt upper surface, the crust lance would be used to fail the crust prior to flooding so that the water would be able to contact the underlying melt. Following water addition, the power supply operation would be switched from constant power at 150 kW to a constant voltage operating mode. (With constant voltage, the input power density would remain relatively constant if a significant quench front developed). Thirty minutes after water addition, or after the debris cooling rate had been reduced to a relatively low level, the crust would be failed with the lance to obtain data on the transient crust breach cooling mechanism. After breach, power supply operations would continue for an additional 30 minutes, yielding a total operating period of 60 minutes with water present in the cavity, or until the ablation limit of 35 cm was reached in either the radial or axial directions. At this point, the input power would be turned off and the test terminated.

3.3 Posttest Operations

Following the experiment, the apparatus is carefully disassembled to document the

posttest debris configuration. The test section main gas line, lid, and the top and middle sidewall sections are removed to reveal the lower test section, which contains the solidified core debris. The upper surface of the debris is then photographed, and specimens are collected for subsequent chemical analysis. At this point, two vertical core samples will be drilled through the extent of the corium. The cores will be removed, photographed, and samples will be collected at several different axial elevations for characterization by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP/AES). This analysis will provide raw data on the axial composition variation within the material.

After these measurements are collected, the four concrete sidewalls of the lower section will be removed, thereby fully revealing the solidified corium over the remaining basemat. Since the corium is revealed, a detailed map of the cavity erosion profile can be developed. Additional chemical samples will be collected at this point in order to further characterize the debris through chemical analysis. When these measurements are completed, the corium ingot will be placed in a storage container and archived as part of the test records. The two MgO sidewall sections will be cleaned for reuse in subsequent tests, while remnants of the two concrete sidewalls will be disposed of as radioactive waste. 4.0 REFERENCES

1. M. T. Farmer, S. Lomperski, D. J. Kilsdonk, and R. W. Aeschlimann, “Core Concrete Interaction (CCI) Tests: CCI-1 Test Data Report-Thermalhydraulic Results,” Rev. 0, OECD/MCCI-2004-TR01, January 31, 2004.

2. S. Lomperski, M. T. Farmer, D. J. Kilsdonk, and R. W. Aeschlimann, “SSWICS-1 Test

Data Report – Thermalhydraulic Results,” OECD/MCCI-2002-TR04, Rev. 0, September 20, 2002.

Page 18: OECD/MCCI-2004-TR02 OECD MCCI Project 2-D Core … · file: cci2_bssv.dwg(ac100) west eastview from south 0-30-45-50-40-35-15-25-20-10-5 +15 +5 +10 +25 +20 +35 cm +30 +65 +60 +55

15

3. S. Lomperski, M. T. Farmer, D. J. Kilsdonk, and R. W. Aeschlimann, “SSWICS-2 Test Data Report – Thermalhydraulic Results,” OECD/MCCI-2002-TR06, Rev. 0, September 20, 2002.