Top Banner
ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager
14

ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

Mar 27, 2015

Download

Documents

Gabriel Romero
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

ODOT Procurement Office (OPO)Donnell FowlerProcurement Operations Manager

Page 2: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

OPO Billing Rate Process• Current process has resulted in

– Generally inconsistent rate schedules for a given firm across their contracts with ODOT.

– Significant Consultant and Agency workload to process rate schedule change requests.

– Schedules that often don’t correlate to Actual Salary Rates (ASRs).

• We need a better way to – Accommodate salary growth over time, – Standardize realistic rate schedules, – WITHOUT significant time investment.

Page 3: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

Consultant ABR1

ATA/PA1 ATA/PA2

ATA/PA4ATA/PA3

• A given consultant might have 10 or more different Billing Rate schedules (BR) across all their ODOT contracts.

• Each BR is contract unique.

• Each BR uses different ASRs and Overhead rates.

• Each contract needs to be amended each year for new rates – huge workload impact .

Consultant ABR2

Consultant ABR3

Consultant ABR4

None of these are the same

BR = Billing Rate Schedule

Current Model

Page 4: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.
Page 5: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

SrEngMgr

$38.53

SrEngMgr

$94.10

SrEngMgr

$87.94

SrEng Mgr

$73.12

SrEng Mgr

$69.15

SrEngMgr

$74.58

SrEngMgr

$66.15

SrEngMgr

$63.31

SPIN

Page 6: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

SrEngMgr

$38.53

SrEngMgr

$94.10

SrEngMgr

$87.94

SrEng Mgr

$73.12

SrEng Mgr

$69.15

SrEngMgr

$74.58

SrEngMgr

$66.15

SrEngMgr

$63.31

SPIN

Page 7: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

SrEngMgr

$38.53

SrEngMgr

$94.10

SrEngMgr

$87.94

SrEng Mgr

$73.12

SrEng Mgr

$69.15

SrEngMgr

$74.58

SrEngMgr

$66.15

SrEngMgr

$63.31

SPIN

Page 8: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

SrEngMgr

$38.53

SrEngMgr

$94.10

SrEngMgr

$87.94

SrEng Mgr

$73.12

SrEng Mgr

$69.15

SrEngMgr

$74.58

SrEngMgr

$66.15

SrEngMgr

$63.31

SPIN

Page 9: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

• Schedule based on ASRs by classification.

• Escalation built-in to the Master Schedule.

Proposed Model

Consultant A Master Multi-year Schedule

ATA/PA1

ATA/PA2

ATA/PA4

ATA/PA3

Page 10: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

New OPO Billing Rate Strategy• Process will standardize to ONE Master Schedule

per Consultant (based on ASRs) that most of their ODOT contracts will reference.– NTEs will still apply if new rates are adopted.

• Master Schedules will build-in annual escalation.• Average Rates per Classification will be utilized for

budget (SES) preparation.– Some exceptions will be allowed when specific staff are

anticipated to work a project.• Desired outcomes

– Consultant and Agency staff time minimized.– Improved rate consistency.– More realistic rates to support estimating.

Page 11: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

FAQs• On Master Schedules, do I include the whole firm?

– NO, just use names, classifications and current ASRs for staff anticipated to be used on ODOT contracts.

– We are developing a central data base to store these schedules to be referenced in ATAs, PAs and Contracts.

• How do I change staff on a project? Is an Amendment required?– Changes to project staff (other than Key Personnel or changes

that alter class. averages) require courtesy notification to the Agency.

– Staff changes should generally be at or below the Classification Maximum ASR.

– Other changes that alter classifications or class. averages will be reviewed annually or as required.

Page 12: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

FAQs• Do I have to estimate with the average

classification rate on all projects?– Estimating with the average will be the general

practice, however Agency may authorize contract exceptions for use of ASRs for specific staff.

• Do I invoice the average rate or the actual rate?– For T&M contracts you will always invoice ASRs.

The average classification rates will be used to develop the NTE.

Page 13: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

FAQs• What about Overhead Rate updates?

– We are further developing this strategy; we are looking to incorporate OH changes as they are approved.

– Working w/stakeholders, including FHWA.

• How do I get started?– We have started this process on a few pilot contracts

to get the bugs worked out.– We have a queue of rate change requests that we’ll

apply the process to.– We will send out the required forms as we process the

actions referenced above.

Page 14: ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager.

Next Steps• Refine approach with input from industry

and other stakeholders– ACEC/OPO Procurement & Contract Standing

Committee – On select upcoming projects, collaborate with the

Consultants involved

• Contacts– Mike Jenkins

[email protected], 503-986-2717

– Vic Folk• [email protected], 503-986-2709