Top Banner
October 2010 CERN-Korea J. Schukraft 1 ALICE Status ALICE Status 8 8 th th CERN-Korea meeting CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday General ALICE status report on Wednesday
14

October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

Jan 13, 2016

Download

Documents

Edith Harmon
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

October 2010 CERN-Korea J. Schukraft 1

ALICE Status ALICE Status 88thth CERN-Korea meeting CERN-Korea meeting

ALICE Status ALICE Status 88thth CERN-Korea meeting CERN-Korea meeting

Collaboration News

Korean participation

General ALICE status report on WednesdayGeneral ALICE status report on Wednesday

Page 2: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

Oct 2010 CERN-Korea J. Schukraft2

Collaboration News Collaboration News New Institutes (since Oct 2009)

Frankfurt Institute of Computer Science (Germany) HLT

Chicago State University (NSF, USA) Physics, EMCAL,Trigger U Texas Austin (DOE USA) Physics, EMCAL

Comsats (Pakistan) : ‘associate members status’, Physics, Computing

Applying (decision in November) KISTI (Korea) : ‘associate members status’ Computing Gahauti Univ (Assam) & Bose Institute (Kolkata) Physics, Upgrades

Ongoing Discussions Pinstech (Pakistan) : ‘associate members status’, Physics, Computing Egypt , Lebanon , …

Spokesperson & CB-chair Spokesperson: P. Giubellino (Torino), starting 1.1.2011 for 3 year term

CB chair : P. Braun-Munzinger (GSI), starting 1.1.2011 for 3 year term

Page 3: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

Oct 2010 CERN-Korea J. Schukraft33

Detector:

Size: 16 x 26 meters

Weight: 10,000 tons

Collaboration:

> 1000 Members> 100 Institutes > 30 countries

ALICEALICE

Page 4: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

Oct 2010 CERN-Korea J. Schukraft4

Korean Participation in ALICEKorean Participation in ALICE

Participating Groups: Kangnung:

TOF assembly & commissioning, Muon arm operation, physics Sejong:

Grid computing, physics Yonsei:

TRD assembly and commissioning, physics Pusan (replacing Pohang)

HMPID R&D and operation, physics

Kisti: (now applying as associate member)

ALICE-Korea GRID computing center

Activity Report by Prof. IK Yoo Activity Report by Prof. IK Yoo

Page 5: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

CCRC F2F 10/01/2008CCRC F2F 10/01/2008 5555

ALICE KISTI T2 centreALICE KISTI T2 centre• In stable operation since 2009

• Providing 180 CPU cores and 30TB of disk storage

Page 6: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

CCRC F2F 10/01/2008CCRC F2F 10/01/2008 6666

KISTI Global Data Science CenterKISTI Global Data Science Center

• Provides T1 services for ALICE• Setup of centre completed (extremely efficient & quick !)

• Initial resources 144 CPU cores, 100TB disk, 100TB tapes

• Bandwidth to CERN(through GLORIAD)200 MBps

Additional Computing very important to ALICE

(sign. shortfall of CPU resources expected)

Page 7: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

Oct 2010 CERN-Korea J. Schukraft7

ALICE Status

0

1

2345

6

7

9

8

1112 13 14

15

17

0

12

3

4

1610

2x2x

2x

2x

2x

Installation WS Installation WS 2010/112010/11

9 week WS : very busy schedule ! install 6 EMCAL & 3 TRD modules

continuous 2 shift operation contingency: reduced scope

very sign. physics gain ! x 2 for TRD J/ jets in emcal

Korean participation commissioning the 3 TRD modules

very appreciated

Page 8: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

Financial issues2011 Construction Budget

Korea has no ongoing construction expenses

Page 9: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

9

Common Fund, C&I Contributions1997 - 2010

Institute Fee:Institute Fee:Kangnung/Sejong: Kangnung/Sejong: fully paid: 100 kCHFfully paid: 100 kCHF

Yonsei: Yonsei: fully paid: 50 kCHFfully paid: 50 kCHF

Associate members

don’t pay

Common Fund

Page 10: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

M&O cat. A invoices/income 2002 - 2010 M&O A:M&O A:‘‘02-’10: fully paid02-’10: fully paid

Page 11: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

11ALICE MB 7 October 2010 - RRB-2010-075 draft and RRB-2010-077-draft

Sharing of the 2011 M&O-A Budget (unit: kCHF)

Rebate from 2009 energy

Total Budget 2.592kCHFSpent 513 kCHF (29.75%)

2009 Invoiced to NMS =771 kCHF

2009 Corrected NMS =153 kCHF

2010 Rebate = 618 kCHF

11

2011 M&O Budget for Korea 2011 M&O Budget for Korea

10 scientists: 127.26 kCHF10 scientists: 127.26 kCHF

(with Energy rebate bill is (with Energy rebate bill is 97.4 kCHF97.4 kCHF))

Page 12: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

2011 M&O B sharing (kCHF)

Page 13: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

Oct 2010 CERN-Korea J. Schukraft13

‘‘Upgrades’Upgrades’ ALICE essentially finished since mid 2008

2 detectors were added later and will be completed by end 2010/early 2011 TRD (Germany, Korea, + …) EMCAL (US, France, Italy)

EMCAL extension (‘DCAL’) (~ 40% of emcal) approved in August 2010 US DOE, Japan, China, France construction to be completed for installation in 2012

Longer term upgrade planning several options are under study

improved vertex dets, forward calo, PID, .. Korean groups interested/participating

concrete plans require first HI data upgrades to be presented & discussed in 2011

Page 14: October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.

Oct 2010 CERN-Korea J. Schukraft14

SummarSummaryy

Korean participation in ALICE: going very well ! increase in 2010 with 1 new associate member participation in detector construction/operation/computing very effective Korea well integrated and active inside the Collaboration