October 2010 CERN-Korea J. Schukraft 1 ALICE Status ALICE Status 8 8 th th CERN-Korea meeting CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday General ALICE status report on Wednesday
Jan 13, 2016
October 2010 CERN-Korea J. Schukraft 1
ALICE Status ALICE Status 88thth CERN-Korea meeting CERN-Korea meeting
ALICE Status ALICE Status 88thth CERN-Korea meeting CERN-Korea meeting
Collaboration News
Korean participation
General ALICE status report on WednesdayGeneral ALICE status report on Wednesday
Oct 2010 CERN-Korea J. Schukraft2
Collaboration News Collaboration News New Institutes (since Oct 2009)
Frankfurt Institute of Computer Science (Germany) HLT
Chicago State University (NSF, USA) Physics, EMCAL,Trigger U Texas Austin (DOE USA) Physics, EMCAL
Comsats (Pakistan) : ‘associate members status’, Physics, Computing
Applying (decision in November) KISTI (Korea) : ‘associate members status’ Computing Gahauti Univ (Assam) & Bose Institute (Kolkata) Physics, Upgrades
Ongoing Discussions Pinstech (Pakistan) : ‘associate members status’, Physics, Computing Egypt , Lebanon , …
Spokesperson & CB-chair Spokesperson: P. Giubellino (Torino), starting 1.1.2011 for 3 year term
CB chair : P. Braun-Munzinger (GSI), starting 1.1.2011 for 3 year term
Oct 2010 CERN-Korea J. Schukraft33
Detector:
Size: 16 x 26 meters
Weight: 10,000 tons
Collaboration:
> 1000 Members> 100 Institutes > 30 countries
ALICEALICE
Oct 2010 CERN-Korea J. Schukraft4
Korean Participation in ALICEKorean Participation in ALICE
Participating Groups: Kangnung:
TOF assembly & commissioning, Muon arm operation, physics Sejong:
Grid computing, physics Yonsei:
TRD assembly and commissioning, physics Pusan (replacing Pohang)
HMPID R&D and operation, physics
Kisti: (now applying as associate member)
ALICE-Korea GRID computing center
Activity Report by Prof. IK Yoo Activity Report by Prof. IK Yoo
CCRC F2F 10/01/2008CCRC F2F 10/01/2008 5555
ALICE KISTI T2 centreALICE KISTI T2 centre• In stable operation since 2009
• Providing 180 CPU cores and 30TB of disk storage
CCRC F2F 10/01/2008CCRC F2F 10/01/2008 6666
KISTI Global Data Science CenterKISTI Global Data Science Center
• Provides T1 services for ALICE• Setup of centre completed (extremely efficient & quick !)
• Initial resources 144 CPU cores, 100TB disk, 100TB tapes
• Bandwidth to CERN(through GLORIAD)200 MBps
Additional Computing very important to ALICE
(sign. shortfall of CPU resources expected)
Oct 2010 CERN-Korea J. Schukraft7
ALICE Status
0
1
2345
6
7
9
8
1112 13 14
15
17
0
12
3
4
1610
2x2x
2x
2x
2x
Installation WS Installation WS 2010/112010/11
9 week WS : very busy schedule ! install 6 EMCAL & 3 TRD modules
continuous 2 shift operation contingency: reduced scope
very sign. physics gain ! x 2 for TRD J/ jets in emcal
Korean participation commissioning the 3 TRD modules
very appreciated
Financial issues2011 Construction Budget
Korea has no ongoing construction expenses
9
Common Fund, C&I Contributions1997 - 2010
Institute Fee:Institute Fee:Kangnung/Sejong: Kangnung/Sejong: fully paid: 100 kCHFfully paid: 100 kCHF
Yonsei: Yonsei: fully paid: 50 kCHFfully paid: 50 kCHF
Associate members
don’t pay
Common Fund
M&O cat. A invoices/income 2002 - 2010 M&O A:M&O A:‘‘02-’10: fully paid02-’10: fully paid
11ALICE MB 7 October 2010 - RRB-2010-075 draft and RRB-2010-077-draft
Sharing of the 2011 M&O-A Budget (unit: kCHF)
Rebate from 2009 energy
Total Budget 2.592kCHFSpent 513 kCHF (29.75%)
2009 Invoiced to NMS =771 kCHF
2009 Corrected NMS =153 kCHF
2010 Rebate = 618 kCHF
11
2011 M&O Budget for Korea 2011 M&O Budget for Korea
10 scientists: 127.26 kCHF10 scientists: 127.26 kCHF
(with Energy rebate bill is (with Energy rebate bill is 97.4 kCHF97.4 kCHF))
2011 M&O B sharing (kCHF)
Oct 2010 CERN-Korea J. Schukraft13
‘‘Upgrades’Upgrades’ ALICE essentially finished since mid 2008
2 detectors were added later and will be completed by end 2010/early 2011 TRD (Germany, Korea, + …) EMCAL (US, France, Italy)
EMCAL extension (‘DCAL’) (~ 40% of emcal) approved in August 2010 US DOE, Japan, China, France construction to be completed for installation in 2012
Longer term upgrade planning several options are under study
improved vertex dets, forward calo, PID, .. Korean groups interested/participating
concrete plans require first HI data upgrades to be presented & discussed in 2011
Oct 2010 CERN-Korea J. Schukraft14
SummarSummaryy
Korean participation in ALICE: going very well ! increase in 2010 with 1 new associate member participation in detector construction/operation/computing very effective Korea well integrated and active inside the Collaboration