Top Banner
October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo Dell’Acqua Meteo-France
21

October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

Mar 27, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-1

RMDCN-TT report

Matteo Dell’AcquaMeteo-France

Page 2: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

Agenda

RMDCN Task Team members and ToRs IMTN overview and status RMDCN status 1st TT meeting outcome

Page 3: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-3

Task Team members

Hans Janßen, Germany Leonid Bezrouk, Russian Federation Steve Foreman, United Kingdom   Giuseppe Leonforte, Italy Klas Linne, Sweden Isabella Weger, ECMWF Yves Buhler, EUMETSAT Mariana Grueva, Bulgaria Roar Skålin, Norway Zhao Licheng, China Hiroyuki Ichijo, Japan

Page 4: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-4

Task Team ToR

To review the matters related to the operation of the RMDCN

To ensure coordination between all RA-VI Member countries and other Members connected to the RMDCN

To maintain close coordination with the TT on WIS Development and Implementation

To make proposals for upgrading the capacities of the RMDCN considering the future implementation and operation of the WIS and the impact of the future GISCs and DCPCs on the performance of the network

To assist the RA-VI Member countries in joining the RMDCN and implementing their connection

Page 5: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-5

Task Team ToR – con’t

To liaise with the CBS-OPAG-ISS– WIS core network is driven by ICG-WIS ! Liaising with ICG-WIS need to

be included in the ToRs : comment from Hiro• MdA : this cn be done through myslef and through the chairs of OPAG-ISS,

who are both members of the TT

To prepare in collaboration with ECMWF possible changes in the RMDCN, including the preparation of a new procurement for the RMDCN

To review the TORs of the RMDCN Operation Committee (ROC) and its membership taking into account the current RMDCN configuration and its future

Chaired by M. Dell’Acqua 1st meeting of the TT 20-21 May 2010 in Prague

Page 6: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

Consolidation of IMTN clouds

Migration process forming WIS core network

IMTNcloud I

IMTN

WIS core network

IMTNcloud II

IMTN

Exeter

SofiaMelbourne

Buenos Aires

TokyoBeijing

Nairobi

Washington

Network INetwork I

Jeddah

Prague

Toulouse

Dakar Algiers

Offenbach

Brasilia

Cairo

New DelhiMoscow

Network IINetwork II

Exeter

SofiaMelbourne

Buenos Aires

TokyoBeijing

Nairobi

Washington

Network INetwork I

Jeddah

Prague

Toulouse

Dakar Algiers

Offenbach

Brasilia

Cairo

New DelhiMoscow

Network IINetwork II

Exeter

Sofia

Melbourne

Buenos Aires

TokyoBeijing

Nairobi

Washington

Jeddah

Prague

Toulouse

Dakar Algiers

Offenbach

Brasilia

Cairo

New Delhi

IMTN cloud

Moscow

RA I

RA II

RA III

RA IV

RA V

RA VI

Exeter

Sofia

Melbourne

Buenos Aires

TokyoBeijing

Nairobi

Washington

Jeddah

Prague

Toulouse

Dakar Algiers

Offenbach

Brasilia

Cairo

New Delhi

IMTN cloud

Moscow

RA I

RA II

RA III

RA IV

RA V

RA VI

Exeter

Sofia

Melbourne

Buenos Aires

TokyoBeijing

Nairobi

Washington

Jeddah

Prague

Toulouse

Dakar Algiers

Offenbach

Brasilia

Cairo

New Delhi

IMTN cloud

Moscow

RA I

RA II

RA III

RA IV

RA V

RA VI

Exeter

Sofia

Melbourne

Buenos Aires

TokyoBeijing

Nairobi

Washington

Jeddah

Prague

Toulouse

Dakar Algiers

Offenbach

Brasilia

Cairo

New Delhi

IMTN cloud

Moscow

RA I

RA II

RA III

RA IV

RA V

RA VI

Exeter

Sofia

Melbourne

Buenos Aires

TokyoBeijing

Nairobi

Washington

Jeddah

Prague

Toulouse

Dakar Algiers

Offenbach

Brasilia

Cairo

New Delhi

IMTN cloud

Moscow

RA I

RA II

RA III

RA IV

RA V

RA VI

Exeter

Sofia

Melbourne

Buenos Aires

TokyoBeijing

Nairobi

Washington

Jeddah

Prague

Toulouse

Dakar Algiers

Offenbach

Brasilia

Cairo

New Delhi

IMTN cloud

Moscow

RA I

RA II

RA III

RA IV

RA V

RA VI

Exeter

Sofia

Melbourne

Buenos Aires

TokyoBeijing

Nairobi

Washington

Jeddah

Prague

Toulouse

Dakar Algiers

Offenbach

Brasilia

Cairo

New Delhi

IMTN cloud

Moscow

RA I

RA II

RA III

RA IV

RA V

RA VI

Consolidation was completed in Nov 2009

Page 7: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

Before consolidation of clouds

Exeter

SofiaMelbourne

Buenos Aires

Tokyo

Beijing

Nairobi

Washington

IMTN Cloud IMTN Cloud I

Jeddah

Prague

Toulouse

Dakar Algiers

Offenbach

Brasilia

Cairo

New DelhiMoscow

IMTN Cloud II: IMTN Cloud II: RMDCNRMDCN

Page 8: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

After consolidation of clouds

Exeter

Sofia

Melbourne

Buenos Aires

TokyoBeijing

Nairobi

Washington

Jeddah

Prague

Toulouse

Dakar Algiers

Offenbach

Brasilia

Cairo

New Delhi

IMTN cloud :

RMDCN

Moscow

RA I

RA II

RA III

RA IV

RA V

RA VI

Page 9: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-9

WIS network architecture

Page 10: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-10

RMDCN status

48 Sites:– 44 NMCs, ECMWF, EUMETSAT (2), DRS for The Netherlands

– 27 Mission Critical Sites

All ECMWF Member States now Mission Critical– Minimum 2 Mbps AL; 1.5 Mbps IP Bandwidth

New Members in 2009-2010– IMTN:

• USA• Australia

– South Korea – supported by UK

– Morocco – ECMWF Co-operating State

some RA-VI countries have not joined RMDCN, mainly due cost concerns. This situation is not likely to change in a near future

Page 11: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-11

RMDCN status

Page 12: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-12

RMDCN Geographical coverage

Page 13: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-13

New potential Sites

Canada

South Africa

Brazil

Israel

16th ROC, 19-21 May 2010, Prague Slide 13

Page 14: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-1416th ROC, 19-21 May 2010, Prague Slide 14

Global RMDCN performance

Page 15: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-15

RMDCN status – con’t

ECMWF started a pilot project to demonstrate the use of automatically and dynamically assigned secure internet connections to provide resilience against RMDCN failure. – RTH Norrköping acts a backup to ECMWF

Technical workshop organised by ECMWF In February 2010 on the RMDCN to review the technologies available in order to start planning and designing the next generation RMDCN. – MPLS IP VPN is likely to continue to prevail as the dominant global

network technology for the coming years

Page 16: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-16

Meetings

The 16th meeting of the RMDCN Operations Committee (ROC) was held on 19-21 May 2010 in Prague

… in conjunction with the 1st meeting of RA VI Task Team on the RMDCN

Identify future options for the RMDCN Identify issues

– Network design

– Service Level requirements

– Financial implication

– Increasing needs for bandwidth

Establish outline plan for the next generation RMDCN and possible time schedule for an ITT process

Page 17: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-17

1st TT meeting - Actions

Refine requirements lists and look at the impact of requirements on others issues (techical, financial, contractual)– Should help in defining the level of the requirement – ECMWF, with TT members

Define scenarios for the strategic evolution of the RMDCN, as WIS core network and RA-VI GTS network, supporting various technology, various performance level and various SLA– Document the trade-off RMDCN/satellite broadcasting system for GTS

global exchanged data Liaise with EUMETSAT– Investigate mix terrestrial technology– Germany, Italy, ECMWF, EUMETSAT (local contribution), UK, Bulgaria

Investigate multi-vendors solutions– Contractual, administrative aspects– Impact on WMO / ECMWF MoU– ECMWF, UKMO, WMO Sec, Germany

Page 18: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-18

1st TT meeting - Actions (con’t)

What kind of products/data will be exchanged on a global basis in the forthcoming 5 years – Strategic view of traffic flows

– Japan, Russia, UK, France, China

EUMETSAT 5-years strategy for redistribution of high volume satellite data– EUMETSAT

Amend ToRs of TT to take into account the requirements of the WIS core network– MdA

Page 19: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-19

1st TT meeting - ROC Members

ECMWF ( chair and Secretariat) Experts from all RA-VI GISCs participating in the RMDCN (4) Experts from RA-VI DCPCs participating in the RMDCN (max of 3) Experts from RA-VI NCs participating in the RMDCN (2) Experts from 3 GISCs (different Region) outside Ra-VI

participating in the RMDCN on a rolling basis every 2-years WMO Secretariat Chair of RMDCN TT

Each countries can have only one representative Meeting in general annually and more if appropriate The chair can invite expert from RMDCN centres

Page 20: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-20

1st TT meeting - ROC ToRs

To monitor the operation of the RMDCN To control interfaces with the GTS To investigate options to improve the reliability, security and

performance of the network To assist in the implementation of connection to the RMDCN To assist in migration To review the performance and the evolution of the RMDCN and

make proposal to the TT To assist the TT with possible changes in the RMDCN To review new technologies and make proposal to the TT to

improve the RMDCN To report to the TT on the operation of the RMDCN and propose

options to improve it

Page 21: October 2010 RMDN TT report, Offenbach MD-1 RMDCN-TT report Matteo DellAcqua Meteo-France.

October 2010

RMDN TT report, Offenbach MD-21

1st TT meeting - Potential timetable for RMDCN NextGen

2H 2010 1H 2011 2H 2011 1H 2012 2H 2012 1H 2013 2H 2013 definition of requirements requirements

definitition of WIS requirements & ECMWF requirements WIS requirements conclusions of working groups reviewed by TT on RMDCN review and recommendations by ECMWF committees review

approval of ITT by ECMWF Council (Dec 2011) ITT process ITT

specification of requirements SoR tender evaluation / contract negotiation evaluation

authorization of contract signature by ECMWF Council implementation

migration of network to new provider migration phase