Lay-down AreaOctober 03, 2013Findings / *Corrective
ActionPhotosFindings / *Corrective ActionPhotos
Timbers scattered around the area (lay-down1). *arrange the
compliant timbers..Timbers scattered around the area (lay-down1).
*arrange the compliant timbers.
Main FabricationOctober 03, 2013Findings / *Corrective
ActionPhotosFindings / *Corrective ActionPhotos
Scaffolding pipe, plastic straws and candy wrappers were found
in the area.*Talked to Mr. Gonzalvo regarding this matter.
Scaffolding pipe, plastic straws and candy wrappers were found in
the area. *Talked to Mr. Gonzalvo regarding this matter. n the
area.
Lay-out and CuttingOctober 03, 2013Findings / *Corrective
ActionPhotosFindings / *Corrective ActionPhotos
Pool of water infront of the shop. * advise to sweep out water
from the shop.
Weeds near the shop* advise for pulling of weeds.
Taken after the weeds have been removed.