OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS HYDRAULIC WORKS AND RENEWABLE ENERGIES PT EN
25

OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

Jan 30, 2018

Download

Documents

ĐỗDung
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS

HYDRAULIC WORKS AND RENEWABLE ENERGIES

PT EN

Page 2: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS

HYDRAULIC WORKS AND RENEWABLE ENERGIES

PT EN

Page 3: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

INTRODUÇÃOINTRODUCTION

# 22.602.02 APROVEITAMENTO HIDROELÉCTRICO DE LUQUIXE IILUQUIXE II SMALL HYDROPOWER SCHEME

# 22.483.04 APROVEITAMENTO HIDROELÉCTRICO DE KAYELEKERA KAYELEKERA HYDROPOWER SCHEME

# 22.630.01 APROVEITAMENTOS HIDROELÉCTRICOS DE LUAPASSO E DE CAMANENGACAMANENGA AND LUAPASSO HYDROPOWER SCHEMES

# 22.557.06 PLANO DE ELECTRIFICAÇÃO DE TIMOREAST TIMOR ELECTRIFICATION MASTERPLAN

# 22.629.01 APROVEITAMENTOS DE GOUVÃES, PADROSELOS, ALTO TÂMEGA E DAIVÕES GOUVÃES, PADROSELOS, ALTO TÂMEGA AND DAIVÕES HYDROPOWER SCHEMES

# 22.504.01APROVEITAMENTO HIDROELÉCTRICO DE VALES VALES HYDROPWER SCHEME

# 22.424.03 CAPTAÇÃO, ESTAÇÃO ELEVATÓRIA E RESERVATÓRIO DE SÃO JORGES. JORGE WATER INTAKE, PUMPING SYSTEM AND STORAGE TANK

# 22.279.05BARRAGEM DE SAMBADE SAMBADE DAM

# 22.432.03BARRAGEM DAS OLGASOLGAS DAM

# 22.432.02 BARRAGEM DE PRETAROUCAPRETAROUCA DAM

# 22.432.02 BARRAGEM DA FERRADOSA FERRADOSA DAM

06

10

12

14

16

18

20

APROVEITAMENTOS HIDROELÉCTRICOSHYDROPOWER SCHEMES 24

26

28

30

32

# 22.560.01BARRAGEM DE SERRINHA E REDE DE REGA DE NAVALHOSERRINHA DAM AND NAVALHO IRRIGATION NETWORK

# 22.325.07 BARRAGEM E REDE DE REGA DE RIO SECO RIO SECO DAM AND IRRIGATION NETWORK

# 22.467.01 AÇUDE INSUFLÁVEL DE ABRANTES ABRANTES RUBBER DAM WEIR

# 25.506.01DESVIO DOS RIOS CHICAPA E LUÓCHICAPA AND LUÓ RIVERS DIVERSION

ABASTECIMENTO URBANOURBAN WATER SUPPLY

36

38

42

44

REGAIRRIGATION

DIVERSOSMISCELLANEOUS

ÍNDICE INDEX

PT EN

Page 4: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

®

INTRODUÇÃOINTRODUCTION

PT EN

CENOR Consultores, S.A. was founded in 1980, and has presently a total staff of about 200 employees.

CENOR is an Engineering Consultants company (design and construction supervision), covering different fields of expertise: Renewable Energies, Infrastructures, Water Supply, Wastewater Drainage, Irrigation, Transportation, Industrial Building and Parks, Geotechnical Works, Geology, Bridges and Foundations.

CENOR Consultores, S.A. is the holding company of several Portuguese and International enterprises:

CENOR Group companies:ECGPLAN, Engenharia, Gestão e Planeamento, Lda.Madeira Island, Portugal

CENOR, Açores, Lda.Azores Island, Portugal

CENOR, Consultores Angola, Lda.Luanda, Angola

CENOR, ArgéliaAlger, Algeria

CENOR, ColômbiaBogotá, Colômbia

CENOR, IraqueBaghdad, Iraq

Subsidiary Companies:NVISTLisbon, Portugal

CENORVIA MZMaputo, Mozambique

SCCONSULTBelo Horizonte, Brazil

DALANDíli, East Timor

Visit us at www.cenor.pt and get to know a solid company ever more prepared to take on new challenges.

A CENOR Consultores, S.A. foi fundada em 1980 e congrega, actualmente, cerca de 200 colaboradores.

É uma empresa especializada em Consultoria de Engenharia no âmbito do projecto e da Fiscalização nos seguintes domínios: Energias Renováveis, Infra-estruturas, Hidráulica Agrícola e Urbana, Saneamento Ambiental, Parques e Unidades Industriais, Engenharia de Transportes, Estruturas e Fundações, Geotecnia e Obras de Arte.

A CENOR Consultores, S.A. detém participações em diversas empresas Nacionais e Internacionais.

Empresas Grupo CENOR:ECGPLAN, Engenharia, Gestão e Planeamento, Lda.Madeira, Portugal

CENOR, Açores, Lda.Açores, Portugal

CENOR, Consultores Angola, Lda.Luanda, Angola

CENOR, ArgéliaArgel, Argélia

CENOR, ColômbiaBogotá, Colômbia

CENOR, IraqueBagdá, Iraque

Empresas Participadas:NVISTLisboa, Portugal

CENORVIA MZMaputo, Moçambique

SCCONSULTBelo Horizonte, Brasil

DALANDíli, Timor Leste

Visite-nos em www.cenor.pt e conheça uma empresa cada vez melhor preparada para responder a novos desafios.

Page 5: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

APROVEITAMENTOS HIDROELÉCTRICOSHYDROPOWER SCHEMES

PT EN

Page 6: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

10 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#Açude de derivação em betão de pequena altura.Conduta forçada com 1.100m de extensão e 1,8m de diâmetro nominal, parte em betão e parte em aço soldado.Chaminé de equilíbrio com 12m de diâmetro e 13m de altura.Central equipada com duas turbinas “Cross-Flow”, com as seguintes características:

- Caudal máximo: 2x4 = 8m³/s; - Queda nominal: 31,7m; - Potência: 2x1.050 = 2.100Kw.

Small height concrete diversion weir.1.100m long Ø1.800 penstock, part concrete and part welded steel.13m high and 12m wide cylindrical surge tank;Powerhouse equipped with two “cross-flow” turbines, with the following characteristics:

- maximum flow: 2x4 = 8m³/s; - nominal fall: 73m; - power: 2x1.050 = 2.100Kw.

EN

PT APROVEITAMENTO HIDROELÉCTRICO DE LUQUIXE II

LUQUIXE II SMALL HYDROPOWER SCHEME

CLIENTE_ OPWAY

SERVIÇOS_ Projecto de Execução

INÍCIO_2009

CONCLUSÃO_ 2009

LOCALIZAÇÃO_ Província do Uíge, Angola

CLIENT_ OPWAY

SERVICES_Construction Design

BEGINING_ 2009

CONCLUSION_ 2009

LOCATION_Província do Uíge, Angola

PROJECT

22602

02

PROJECTO 22.602.02

Page 7: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

12 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#Barragem de betão gravidade com 35m de altura.Tomada de água na albufeira criada pela barragem.Túnel sub-horizontal com 3m de diâmetro útil e 1.500m de extensão. Chaminé de equilíbrio com 12m de diâmetro e 29m de altura.Conduta de aço soldado com 2,2m de diâmetro e 50m de extensão.

Central equipada com duas turbinas Francis, com as seguintes características:

- Caudal máximo: 2x9 = 18m³/s; - Queda nominal: 73m; - Potência: 2x5,6 = 11,2Mw.

35m high concrete gravity dam. Water intake in the reservoir created by the dam. 1.500m long and Ø3.000 low slope tunnel. 29m high and 12m wide cylindrical surge tank. 50m long and Ø2.200 welded steel penstock.

Powerhouse equipped with two Francis turbines with the following characteristics:

- maximum flow: 2x9 = 18m³/s; - nominal fall: 73m; - Power: 2x5,6 = 11,2Mw.

PROJECT

22483

04

PROJECTO 22.483.04

EN

PT APROVEITAMENTO HIDROELÉCTRICO DE KAYELEKERA

KAYELEKERA HYDROPOWER SCHEME

CLIENTE_ Mota-Engil | ESCOM

SERVIÇOS_ Estudo Prévio

INÍCIO_2009

CONCLUSÃO_ 2009

LOCALIZAÇÃO_ Rio Norte Rukuru, Karonga, Malawi

CLIENT_ Mota-Engil | ESCOM

SERVICES_Preliminary Design

BEGINING_ 2009

CONCLUSION_ 2009

LOCATION_North Rukuru River, Karonga, Malawi

Page 8: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

14 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#Aproveitamento de Luapasso:

- Barragem mista de betão e de terra, com 25,8m de altura máxima acima da fundação.

- Circuito hidráulico formado por três túneis, cada uma com 3,5m de diâmetro e 220m de comprimento.

- Central hidroeléctrica equipada com 3 turbinas Kaplan e com uma potência instalada total de 24,63MW.

Aproveitamento de Camanenga: - Duas barragens mistas de betão e de terra, com 23,5m de altura máxima acima da fundação.

- Circuito hidráulico formado por três condutas forçadas de aço soldado, cada uma com 3,3m de diâmetro e 650m de comprimento.

- Central hidroeléctrica equipada com 3 turbinas Francis e com uma potência instalada total de 31,2MW.

Luapasso Scheme: - Mixed concrete/earth dam, 25,8m high above foundation.

- Hydraulic circuit composed by 3 parallel tunnels, each with a diameter of 3,5m and a length of about 220m.

- Powerhouse equipped with 3 Kaplan turbines having a total installed power of 24,63 MW.

Camanenga Scheme: - Two mixed concrete/earth dams, with a maximum height of 23,5m above foundation.

- Hydraulic circuit composed by three welded steel penstocks, each with a 3,3m diameter and a 650m length.

- Powerhouse equipped with 3 Francis turbines and having a total installed power of 31,2MW

EN

PT APROVEITAMENTOS HIDROELÉCTRICOS DE LUAPASSO E DE CAMANENGA

CAMANENGA AND LUAPASSO HYDROPOWER SCHEMES

CLIENTE_ ESCOM

SERVIÇOS_ Estudo de Viabilidade Técnico-Económica

INÍCIO_2008

CONCLUSÃO_ Em curso

LOCALIZAÇÃO_ Rio Luachimo, Lunda Norte, Angola

CLIENT_ ESCOM

SERVICES_Feasibility Study

BEGINING_ 2008

CONCLUSION_ In course

LOCATION_Luachimo River, Lunda Norte, Angola

PROJECT

22630

01

PROJECTO 22.630.01

Page 9: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

16 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#

No âmbito do Plano de Electrificação de Timor Leste com energias renováveis, a Martifer Renewables encarregou a CENOR de assegurar a componente hidroeléctrica, que compreende a identificação, o pré dimensionamento, a estimativa de custo e classificação de todos os aproveitamentos hidroeléctricos tecnicamente viáveis no país e com relevância para a sua rede de distribuição de energia.

Within the East Timor Electrification Masterplan, CENOR performed its hydropower component, comprising the identification, preliminary design, costing and ranking of all feasible hydropower schemes in the country.

EN

PT PLANO DE ELECTRIFICAÇÃO DE TIMOR

EAST TIMOR ELECTRIFICATION MASTERPLAN

CLIENTE_ Martifer Renewables

SERVIÇOS_ Projecto de Execução

INÍCIO_2008

CONCLUSÃO_ 2009

LOCALIZAÇÃO_ Timor Leste

CLIENT_ Martifer Renewables

SERVICES_Final Design

BEGINING_ 2008

CONCLUSION_ 2009

LOCATION_East Timor

PROJECT

22557

06

PROJECTO 22.557.06

Page 10: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

18 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

# A CENOR elaborou, em associação com a AQUALOGUS, o Anteprojecto do complexo constituído pelos Aproveitamentos Hidroeléctricos de Gouvães, de Padroselos, de Alto Tâmega e de Daivões, estando agora a desenvolver o projecto dos dois últimos, cujas características são as seguintes:

- Aproveitamento hidroeléctrico de Alto Tâmega: Barragem no rio Tâmega, em abóbada de dupla curvatura, com 108m de altura máxima acima da fundação e com 285m de desenvolvimento do coroamento.Central hidroeléctrica de pé-de-barragem, com 2 grupos, equipada para o caudal máximo de 160m³/s e para a potência máxima 118MW.

- Aproveitamento hidroeléctrico de Daivões: Barragem no rio Tâmega, em arco-gravidade, com 75m de altura máxima acima da fundação e com 266m de desenvolvimento do coroamento. Central hidroeléctrica de pé-de-barragem, com 2 grupos, equipada para o caudal máximo de 220m³/s e para a potência máxima 118MW.

CENOR, in association with AQUALOGUS, made the preliminary design of Gouvães, Padroselos, Alto Tâmega and Daivões hydropower schemes, the two latter one having now entered the design for tender phase, based on the following characteristics:

- Alto Tâmega hydropower scheme: Double curvature arch dam, in Tâmega river, 108m hight above foundation and 285m long at crest. Dam-toe powerhouse, with two non-reversible Francis turbines: 160m³/s maximum discharge and 118MW maximum output.

- Daivões hydropower scheme: Arch-gravity dam, in Tâmega river, 75m hight above foundation and 266m long at crest. Dam-toe powerhouse, with two non-reversible Francis turbines: 220m³/s maximum discharge and 118MW maximum output.

PROJECT

22629

01

PROJECTO 22.629.01

EN

PT APROVEITAMENTOS DE GOUVÃES, PADROSELOS, ALTO TÂMEGA E DAIVÕES

GOUVÃES, PADROSELOS, ALTO TÂMEGA AND DAIVÕES HYDROPOWER SCHEMES

CLIENTE_ Iberdrola

SERVIÇOS_ Anteprojecto

INÍCIO_2008

CONCLUSÃO_ 2009

LOCALIZAÇÃO_ Rios Tâmega, Torno e Beça, Trás-os-Montes, Portugal

CLIENT_ Iberdrola

SERVICES_Draft Design

BEGINING_ 2008

CONCLUSION_ 2009

LOCATION_Tâmega, Torno and Beça Rivers, Trás-os-Montes, Portugal

Page 11: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

20 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#Aproveitamento para produção de energia eléctrica, constituído por: 2 açudes de betão gravidade, com tomadas de água do tipo tirolês; canal de derivação de secção transversal rectangular, com 2.640m de comprimento; câmara de carga; conduta forçada de aço (Ø1.000mm), com 244m de comprimento e por central hidroeléctrica equipada com uma turbina Francis de eixo horizontal, que, com uma queda útil total de 127,72m e um caudal máximo turbinável de 2,90m³/s, terá uma potência instalada de 3.321MW.O açude principal (rio Tinhela) terá 14,7m de altura máxima, acima da fundação, e coroamento com 43m de desenvolvimento. A captação secundária (ribeira de Chã do Meio) terá apenas 2,65m de altura e coroamento com cerca de 8m de desenvolvimento. A ligação desta captação ao canal de derivação será feita mediante aqueduto de betão com secção de 0,8 x 0,8m².

Hydroelectric Development comprising 2 gravity concrete weirs, tyrol type water intake structures, diversion channel with 2.640m long, loading chamber, steel high presssure pipe line (Ø1.000mm), with 244m long and by an hydroelectric plant equipped with an horizontal axis’ Francis turbine, which, with a nominal fall of 127,72m and a maximum throughput of 2,90m³/s, will have a nominal load of 3.321MW.The primary weir (Tinhela’s river) has 14,7m of maximum height above foundation and a crest with 43m. The secondary collection (Chã do Meio) has 2,65m height and a crest with 8m long. The connection between this collection and the by-pass channel is made through a concrete aqueduct with a section of 0,8X0,8m².

PROJECT

22504

01

PROJECTO 22.504.01

EN

PT APROVEITAMENTO HIDROELÉCTRICO DE VALES

VALES HYDROPOWER SCHEME

CLIENTE_ HIDROERG – Projectos Energéticos, Lda.

SERVIÇOS_ Projecto para Concurso Projecto de ExecuçãoAssistência Técnica

INÍCIO_2004

CONCLUSÃO_ 2006

LOCALIZAÇÃO_ Rio Tinhela, Vila Real, Trás-os-Montes, Portugal

CLIENT_ HIDROERG – Projectos Energéticos, Lda.

SERVICES_Invitation to Tender Process Final DesignTechnical Assistance

BEGINING_ 2004

CONCLUSION_ 2006

LOCATION_Tinhela River, Vila Real, Trás-os-Montes, Portugal

Page 12: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

ABASTECIMENTO URBANOURBAN WATER SUPPLY

PT EN

Page 13: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

24 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#Captação de Água na Albufeira de Touvedo: Estação elevatória com aproximadamente 2MW de potência, instalada e equipada com 4 grupos submersíveis, dimensionados, cada um deles, para um caudal de 250l/s e uma altura de elevação de 175m.Transporte: conduta elevatória (DN700 de FFD), com 1.100m de extensão, que liga à ETA de S. Jorge. Reservatório de água tratada com duas células e 15.000m³ de capacidade, situado imediatamente a jusante da ETA.

Water intake located on Touvedo dam reservoir right bank. 2MW pumping station equipped with four submersible units, each of them able to pump 250l/s to a 175m head.DN700 cast iron pumping conduit, 1.100m long, connecting the pumping station to a water treatment plant and to a large storage tank. 15.000m³ two cell tank for treated water.

PROJECT

22424

03

PROJECTO 22.424.03

EN

PT CAPTAÇÃO, ESTAÇÃO ELEVATÓRIA E RESERVATÓRIO DE SÃO JORGE

S. JORGE WATER INTAKE, PUMPING SYSTEM AND STORAGE TANK

CLIENTE_ Águas do Minho e Lima, S.A.

SERVIÇOS_ Estudo Prévio Projecto de Execução Assistência Técnica

INÍCIO_2005

CONCLUSÃO_ 2006

LOCALIZAÇÃO_ Arcos de Valdevez, Minho, Portugal

CLIENT_ Águas do Minho e Lima, S.A.

SERVICES_Preliminary Study Detail DesignAdvisory Services

BEGINING_ 2005

CONCLUSION_ 2006

LOCATION_Arcos de Valdevez, Minho, Portugal

Page 14: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

26 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#

Barragem para abastecimento urbano, de terra com perfil zonado, com 29m de altura máxima acima da fundação, 357m de desenvolvimento do coroamento e 246.823m³ de volume de aterro. Descarregador de cheias dimensionado para um caudal máximo de 27m³/s. Torre de tomada de água na albufeira com 3 orifícios Ø300mm, para captação de água a diferentes níveis.

Earth dam with central clay core, for urban water supply, with 29m of maximum height above foundation, 357m of crest length and 246.823m³ of landfill volume. Spillway designed for a maximum flow of 27m³/s. Water intake tower in the reservoir, with entrance holes at 3 different levels.

PROJECT

22279

05

PROJECTO 22.279.05

EN

PT BARRAGEM DE SAMBADE

SAMBADE DAM

CLIENTE_ Águas de Trás-os-Montes e Alto Douro

SERVIÇOS_ Reformulação do Projecto de ExecuçãoAssistência Técnica à Obra

INÍCIO_2004

CONCLUSÃO_ 2006

LOCALIZAÇÃO_ Alfândega da Fé, Trás-os-Montes, Portugal

CLIENT_ Águas de Trás-os-Montes e Alto Douro

SERVICES_Final Design Technical Assistance

BEGINING_ 2004

CONCLUSION_ 2006

LOCATION_Alfândega da Fé, Trás-os-Montes, Portugal

Page 15: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

28 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#Barragem para abastecimento urbano, de betão gravidade clássico, com 34,5m de altura máxima acima da fundação, 123m de desenvolvimento do coroamento e 30.300m³ de volume de betão.Descarregador de Cheias dimensionado para um caudal máximo de 196m³/s, constituído por soleira descarregadora livre (tipo Creager), canal de descarga em degraus sobre o paramento de jusante da barragem e bacia de dissipação de energia do tipo III do USBR.Descarga de fundo (Ø800mm) inserida no corpo da barragem e dimensionada para um caudal máximo de 2,43m³/s.Torre de tomada de água na albufeira, com estação de bombagesm no seu interior e com 3 orifícios (Ø300mm) para captação de água a diferentes níveis.

Concrete gravity dam, for urban water supply, with 34,5m of maximum height above foundation, 123m crest length and 30.300m³ of concrete volume.Uncontrolled spillway on the dam body, designed for a maximum flow of 196m³/s.Bottom outlet (Ø800mm) embedded in the dam’s body and designed for a maximum flow of 2,43m³/s.Water intake tower in the reservoir, with a pumping station inside and with intake holes at 4 different levels.

PROJECT

22432

03

PROJECTO 22.432.03

EN

PT BARRAGEM DAS OLGAS

OLGAS DAM

CLIENTE_ Águas de Trás-os-Montes e Alto Douro

SERVIÇOS_ Projecto de Execução Assistência Técnica à Obra

INÍCIO_2004

CONCLUSÃO_ 2006

LOCALIZAÇÃO_ Torre de Moncorvo, Trás-os-Montes, Portugal

CLIENT_ Águas de Trás-os-Montes e Alto Douro

SERVICES_Final Design Technical Assistance

BEGINING_ 2004

CONCLUSION_ 2006

LOCATION_Torre de Moncorvo, Trás-os-Montes, Portugal

Page 16: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

30 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#Barragem para abastecimento urbano, de betão gravidade clássico, com 28,5m de altura máxima acima da fundação, 305m de desenvolvimento do coroamento e 37.000m³ de volume de betão.Descarregador de Cheias dimensionado para um caudal máximo de 194m³/s, constituído por soleira descarregadora livre (tipo Creager), por canal de descarga em degraus, sobre o paramento de jusante da barragem, e por bacia de dissipação de energia do tipo III do USBR. Descarga de fundo (Ø1.300mm) inserida no corpo da barragem e dimensionada para um caudal máximo de 8,80m³/s.Três tomadas de água para abastecimento (Ø800mm) sobre o paramento de montante da barragem.

Concrete gravity dam, for urban water supply and hydropower, with 28,5m of maximum height above foundation, 305m of crest length and 37.000m³ of concrete volume.The uncontrolled spillway was designed for a maximum flow of 194m³/s and it is located on the dam body. A Ø1.300 bottom outlet is embedded in the dam body, its maximum output being of 8,80m³/s.Three Ø800 water intakes are located on the dam upstream face.

PROJECT

22432

02

PROJECTO 22.432.02

EN

PT BARRAGEM DE PRETAROUCA

PRETAROUCA DAM

CLIENTE_ Águas de Trás-os-Montes e Alto Douro

SERVIÇOS_ Estudo PrévioProjecto de Execução Assistência Técnica

INÍCIO_2003

CONCLUSÃO_ 2006

LOCALIZAÇÃO_ Lamego, Portugal

CLIENT_ Águas de Trás-os-Montes e Alto Douro

SERVICES_Preliminary Design Final DesignTechnical Assistance

BEGINING_ 2003

CONCLUSION_ 2006

LOCATION_Lamego, Portugal

Page 17: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

32 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#Barragem para abastecimento urbano, de betão gravidade clássico, com 33,4m de altura máxima acima da fundação, 121m de desenvolvimento do coroamento e 34.200m³ de volume de betão.Descarregador de Cheias dimensionado para um caudal máximo de 50,1m³/s, constituído por soleira descarregadora livre (tipo Creager), canal de descarga em degraus, sobre o paramento de jusante da barragem, e bacia de dissipação do tipo III do USBR.Descarga de fundo (Ø800mm), inserida no corpo da barragem e dimensionada para um caudal máximo de 2,42m³/s.Torre de tomada de água na albufeira, com estação de bombagem no seu interior e com 4 orifícios (Ø300mm) para captação de água a diferentes níveis.

Concrete gravity dam for urban water supply, with 33,4 of maximum height above foundation, a crest with 121m and 34.200m³ of concrete volume.Flood spillway designed for a maximum flow of 50,1m³/s, with a Creager spillway sill.Bottom outlet (Ø800mm) included in the Dam’s body and designed for a maximum flow of 2,42m³/s.Water intake tower in the reservoir, with a pumping station inside and with 4 holes (Ø300mm) to water collection at different levels.

PROJECT

22432

02

PROJECTO 22.432.02

EN

PT BARRAGEM DA FERRADOSA

FERRADOSA DAM

CLIENTE_ Águas de Trás-os-Montes e Alto Douro

SERVIÇOS_ Estudo PrévioProjecto de Execução Assistência Técnica

INÍCIO_2003

CONCLUSÃO_ 2005

LOCALIZAÇÃO_ Freixo de Espada-à-Cinta, Trás-os-Montes, Portugal

CLIENT_ Águas de Trás-os-Montes e Alto Douro

SERVICES_Preliminary Design Final DesignTechnical Assistance

BEGINING_ 2003

CONCLUSION_ 2005

LOCATION_Freixo de Espada-à-Cinta, Trás-os-Montes, Portugal

Page 18: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

REGAIRRIGATION

PT EN

Page 19: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

36 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#Barragem para rega. Barragem de aterro com núcleo argiloso com cerca de 30m de altura máxima acima da fundação. O escoamento médio anual afluente à secção da barragem, que domina uma bacia hidrográfica com 7km², é de 1,4Mm³. A albufeira criada pela barragem de Serrinha inundará uma área com 20ha e terá uma capacidade de armazenamento de 2Mm³.A área a regar com a água captada na albufeira da barragem de Serrinha é próxima de 300 ha, sendo o correspondente consumo da ordem de 900.000m³/ano.

Earth dam with central clay core for irrigation purposes, with 30m of maximum height above foundation. The annual medium load of the influent to the dam, which has an hydrographic basin of 7km², is of about 1,4Mm³. The reservoir created by Serrinha’s dam will flood a 20ha area and will have about 2Mm³ of storage capacity. The irrigation area is approximately 300ha, with an estimated annual consumption of 900.000m³/year.

PROJECT

22560

01

PROJECTO 22.560.01

EN

PT BARRAGEM DE SERRINHA E REDE DE REGA DE NAVALHO

SERRINHA DAM AND NAVALHO IRRIGATION NETWORK

CLIENTE_ Município de Mirandela

SERVIÇOS_ Estudo Prévio

INÍCIO_2007

CONCLUSÃO_ Em curso

LOCALIZAÇÃO_ Mirandela, Trás-os-Montes, Portugal

CLIENT_ Município de Mirandela

SERVICES_Preliminary Design

BEGINING_ 2007

CONCLUSION_ In course

LOCATION_Mirandela, Trás-os-Montes, Portugal

Page 20: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

38 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#Barragem de aterro zonado, com núcleo central impermeável, com cerca de 20m de altura máxima acima da fundação, 750m de desenvolvimento do coroamento e 350.000m³ de volume de aterro.Descarregador de cheias dimensionado para um caudal máximo de 39m³/s. Torre de tomada de água na albufeira, com captações localizadas a 3 níveis.Perímetro de rega com 380ha / consumo médio anual de 6.250m³/ha. Modelo cultural: predominância de milho (50%) e de lameiros (20%).

Earth dam with central clay core, with 20m of maximum height above foundation, 750m of crest length and 350.000m³ of landfill volume.Spillway designed for maximum discharge of 39m³/s.Water intake tower in the reservoir with entrance holes at 3 different levels.380ha irrigation network, with an estimated annual consumption of 6.250m³/ha.

PROJECT

22325

07

PROJECTO 22.325.07

EN

PT BARRAGEM E REDE DE REGA DE RIO SECO

RIO SECO DAM AND IRRIGATION NETWORK

CLIENTE_ DRABI – Direcção Regional de Agricultura da Beira Interior

SERVIÇOS_ Estudo Base Estudo PrévioProjecto de Execução Assistência Técnica

INÍCIO_2006

CONCLUSÃO_ 2009

LOCALIZAÇÃO_ Guarda, Beira Alta, Portugal

CLIENT_ DRABI – Direcção Regional de Agricultura da Beira Interior

SERVICES_Draft Design Preliminary DesignFinal Design Technical Assistance

BEGINING_ 2006

CONCLUSION_ 2009

LOCATION_Guarda, Beira Alta, Portugal

Page 21: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

DIVERSOSMISCELLANEOUS

PT EN

Page 22: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

42 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#Açude móvel, destinado a criar um espelho de água permanente defronte da cidade de Abrantes, para fins cénicos e lúdicos.

- Este açude tem 6,5m de altura máxima acima do leito e 250m de extensão (comprimento de margem a margem).

- É constituído por 5 vãos, sendo 1 deles fixo com 40m de largura, sendo 3 deles móveis com comportas insufláveis de 45m de largura por 3,2m de altura e sendo o restante também móvel com comporta insuflável de 25,25m de largura por 1m de altura.

- Dispõe de um circuito para descarga de caudal ecológico, na margem direita, e de uma escada de peixes, na margem esquerda, dimensionada para um caudal da ordem de 2m³/s.

Weir designed to create a permanent impounding in front of Abrantes’ Town, for scenic and leisure purposes. The weir comprises:

- One fish ladder; - One spillway span 21,75m wide, equipped with a rubber inflatable gate 1m high;

- Three spillway spans, each 46m wide and equipped with 3,2m high rubber inflatable;

- One 40m wide concrete ogee crest spillway span; - One Ecological Flow Outlet.

This is a mobile weir, whose rubber gates will remain inflated for river flows between up to 750m³/s. Above this, the gate will automatically deflate.

PROJECT

22467

01

PROJECTO 22.467.01

EN

PT AÇUDE INSUFLÁVEL DE ABRANTES

ABRANTES RUBBER DAM WEIR

CLIENTE_ Consórcio MSF | LENA | SETH

SERVIÇOS_ Projecto BaseProjecto para LicenciamentoProjecto de Execução Assistência Técnica à Obra

INÍCIO_2004

CONCLUSÃO_ 2006

LOCALIZAÇÃO_ Rio Tejo, Abrantes, Portugal

CLIENT_Consórcio MSF | LENA | SETH

SERVICES_Construction LicensingFinal DesignTechnical Assistance

BEGINING_2004

CONCLUSION_2006

LOCATION_ Tejo River, Abrantes, Portugal

Page 23: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

44 |

OB

RAS

HID

RÁU

LICA

S E

ENER

GIA

S R

ENO

VÁVE

IS

HYD

RAU

LIC

WO

RK

S AN

D R

ENEW

ABLE

EN

ERG

IES

#

Concepção geral:Desvio dos rios por meio de três barragens de terra e de um canal escavado, com 1.700m³/s de capacidade máxima.

Finalidade:Permitir a abertura de uma mina a céu aberto sob o actual leito do rio.

Características técnicas: - Canal:

- Comprimento: 2.700m; - Declive longitudinal: 0.00152; - Profundidade máxima: 10m; - Largura superficial: 20m; - Revestimento: Colchões - Reno; Volume de escavação: 2x106m3;

- Barragens: - Comprimento total: 1.700m; - Tipo: Terra com perfil zonado; - Altura maxima acima da fundação: 14m; - Largura do coroamento: 10m; - Volume de aterro: 0,45x106m³.

General Layout:River diversion by means of three earth cofferdams and an excavated channel, with a 1.700m³/s maximum capacity.

Purpose:To allow deep mining excavation of the natural river bed.

Technical Data: - Channel:

- Length: 2.700m; - Longitudinal slope: 0.00152; - Maximum depth: 10m; - Top width: 20m; - Lining: 0.30m thick Reno mattresses; - Excavation volume: 2x106m³;

- Dams : - Total length: 1.700m; - Type: zoned earth dams with clay core; - Maximum height above foundation: 14m; - Crest width: 10m; - Landfill volume: 0,45x106m³.

PROJECT

25506

01

PROJECTO 25.506.01

EN

PT DESVIO DOS RIOS CHICAPA E LUÓ

CHICAPA AND LUÓ RIVERS DIVERSION

CLIENTE_ LUÓ – Sociedade Mineira do Camachia

SERVIÇOS_ Revisão do Projecto de Execução

INÍCIO_2004

CONCLUSÃO_ 2006

LOCALIZAÇÃO_ Luanda Norte, Angola

CLIENT_ LUÓ – Sociedade Mineira do Camachia

SERVICES_Hydraulic Design Geological, Geotechnical InvestigationConstruction Design

BEGINING_ 2004

CONCLUSION_ 2006

LOCATION_Luanda Norte, Angola

Page 24: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

www.cenor.pt

Empresas Grupo CENOR_ CENOR Group companies_ECGPLAN, Engenharia, Gestão e Planeamento, Lda. [Madeira, Portugal_ Madeira, Portugal_]CENOR, Açores, Lda. [Açores, Portugal_ Azores, Portugal_]CENOR, Consultores Angola, Lda. [Luanda, Angola_ Luanda, Angola_]CENOR, Argélia [Argel, Argélia_ Alger, Algeria_]CENOR, Colômbia [Bogotá, Colômbia_ Bogotá, Colômbia_]CENOR, Iraque [Bagdá, Iraque_ Baghdad, Iraq_]

Empresas Participadas_ Subsidiary Companies_NVIST [Lisboa, Portugal_ Lisbon, Portugal_]CENORVIA MZ [Maputo, Moçambique_ Maputo, Mozambique_]SCCONSULT [Belo Horizonte, Brasil_ Belo Horizonte, Brazil_]DALAN [Díli, Timor Leste_ Díli, East Timor_]

Page 25: OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIScenor.pt/publicacoes/Cenor_PublicacoesHidraulicasRenovaveisPTEN... · 10 | OBRAS HIDRÁULICAS E ENERGIAS RENOVÁVEIS-HYDRAULIC WORKS AND RENEWABLE

NOVEMBRO 2013

CENOR Consultores, S.A.Rua das Vigias, 2 . Piso 1 Parque das Nações 1990-506 Lisboa LISBOA . PORTUGAL

T. +351 218 437 300 F. +351 218 437 301 E. [email protected]

www.cenor.pt

CO-FINANCIAMENTO