Page 1 of 2 OBLIGATION AGREEMENT Property Owner/Grantor: Stimson Lumber Company, an Oregon corporation Taxlot: 01S10W-802 File Number: 001 In addition to the negotiated and accepted compensation of $227,951.79 and items acquired in the Permanent Right of Way Easement and the Temporary Construction Easement, Tillamook County agrees to: • Construct four road approaches and mutually agreed approved gates adjacent the right of way alignment at station locations 332+62 LT & RT, 343+00 RT and 362+50 RT that will extend approximately 145 ft & 130 ft, 100 ft and 110 ft from the road centerline. (See attached Exhibit A for stationing locations.) • To assist with cable logging operations and tail hold anchors. (See attached Exhibit A for stationing locations.) County will install pipes under the roadway every 150 ft between stations 336+00 and 351+00 (inclusive). It is understood and agreed that County’s performance of this agreement shall be a portion of the consideration for the concurrent real property transaction evidenced by the Right of Way Permanent Easement and the Temporary Construction Easement between the Grantor and Tillamook County. This document shall not be effective nor binding until the Grantor receive notice from Tillamook County, accepting the conveyance of the real property interests. Dated this _________ day of ________________________, 2021. Grantor: Stimson Lumber Company __________________________________ Daniel McFall, Chief Financial Officer and Chief Operating Officer (See following page for signatures and acceptance)
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1 of 2
OBLIGATION AGREEMENT
Property Owner/Grantor: Stimson Lumber Company, an Oregon corporation Taxlot: 01S10W-802 File Number: 001 In addition to the negotiated and accepted compensation of $227,951.79 and items acquired in the Permanent Right of Way Easement and the Temporary Construction Easement, Tillamook County agrees to:
• Construct four road approaches and mutually agreed approved gates adjacent the right of way alignment at station locations 332+62 LT & RT, 343+00 RT and 362+50 RT that will extend approximately 145 ft & 130 ft, 100 ft and 110 ft from the road centerline. (See attached Exhibit A for stationing locations.)
• To assist with cable logging operations and tail hold anchors. (See attached Exhibit A for
stationing locations.) County will install pipes under the roadway every 150 ft between stations 336+00 and 351+00 (inclusive).
It is understood and agreed that County’s performance of this agreement shall be a portion of the consideration for the concurrent real property transaction evidenced by the Right of Way Permanent Easement and the Temporary Construction Easement between the Grantor and Tillamook County. This document shall not be effective nor binding until the Grantor receive notice from Tillamook County, accepting the conveyance of the real property interests. Dated this _________ day of ________________________, 2021. Grantor: Stimson Lumber Company __________________________________ Daniel McFall, Chief Financial Officer and Chief Operating Officer (See following page for signatures and acceptance)
Page 2 of 2
Tillamook County Acceptance: Dated this _______ day of__________________, 2021. THE BOARD OF COMMISSIONERS FOR TILLAMOOK COUNTY, OREGON Aye Nay Abstain/Absent ______________________________ ___ ___ ______/_______ Mary Faith Bell, Chair ______________________________ ___ ___ ______/_______ David Yamamoto, Vice-Chair ______________________________ ___ ___ ______/_______ Erin D. Skaar, Commissioner ATTEST: Tassi O’Neil, APPROVED AS TO FORM County Clerk By.____________________________ ___________________________ Special Deputy Joel W. Stevens County Counsel
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
INDEX TO SHEETS
DESCRIPTIONNO.
SHEET
5-(x)
4
3
2
1
RIGHT-OF-WAY PLAN SHEETS
VICINITY MAP
TYPICAL SECTION
SYMBOLS & ABBREVIATIONS
TITLE SHEET
NUMBER
SHEET
1
R
EN
OR
AI
N
N
ST F
R
I
D
DEPA
T
NTOFT A SP
TT
O
UTE
ATESOAM
ERIC
A
M
STATE PROJECTSHEETS
TOTAL
OR
TILLAMOOK B780(1) 8
PA
CF
IC
IO
EC
AN
COLUMBIA RIV
ER
SN
AKE
RIV
ER
Lake
MalheurLake
Harney
Lake
Summer
DES
CH
UT
ES RIV
ER
Lake
Klamath
Upper
Abert
Lake
WASHINGTON
ID
AH
O
CALIFORNIA
OREGON KEY MAP
LAKE N.P.
CRATER
REFUGE
WILDLIFE
NATIONAL
MALHEUR
RANGE
ANTELOPE
NATIONAL
HART MT.Grants Pass
MEDFORD
Ashland
Roseburg
EUGENE
Bend
Corvallis
Newport
SALEM
PORTLAND
Astoria
Pendleton
La Grande
Ontario
Burns
Falls
Klamath
Bend
North
City
Baker
Dalles
The
199
395101
97
30
26
97
20
95
395
395197101
20 20
26
2626
5
5
84
82
84
205
NEVADA
N
Cape Meares Lighthouse Drive
Section 18
T. 1 S., R. 10 W., Willamette Meridian
]Int_ft
2D
[
c:\p
w-w
ork\d0262104\or-a0577801ja.d
gn
1:17 P
M
9 A
pril 2
019
PACIFIC OCEAN
Lighthouse
Cape Meares
ekaL seraeM
ep
aC
TILLAMOOK BAY
Cape Meares
4th St
NW
Larson Creek
Project Location
LENGTH 1.697 MILES
OR TILLAMOOK B780(1)
CAPE MEARES ROAD RELOCATION
END PROJECT
TYPE OF CONSTRUCTION:
retaining walls, drainage
aggregate, paving, MSE walls,
Excavation, embankment, roadway
SPECIFICATION:
on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
SCALE IN FEET
01000 1000 2000
RIGHT OF WAY PLANS FOR PROPOSED PROJECT
OREGON
TILLAMOOK COUNTY
CAPE MEARES NATIONAL WILDLIFE REFUGE
390+15.58
REFUGE
WILDLIFE
NATIONAL
CAPE MEARES
WN dR n
aeco
yaB
rD
er
oh
sy
aB
rD
er
oh
sy
aB
dR seraeM
STATE PARK
CAPE MEARES
Lighthouse Dr
Cape Meares
To Oceanside, Oregon
To State H
wy 131
To Tilla
mook, Oregon
Bayocean Dike Rd
To State Hwy 131
BEGIN PROJECT
299+30.00
rhagerty
Typewritten Text
EXHIBIT A
rhagerty
Typewritten Text
rhagerty
Typewritten Text
rhagerty
Typewritten Text
rhagerty
Typewritten Text
rhagerty
Typewritten Text
N
DI DI
wall face
T T
E
EL. 94.61 ft N
36 3631 31
1 1 6 6
15 15
22 22
161
SEC.
161
SEC.
400
BCAC IRIP PC
Cap
Alum.
Cap
Brass
Pipe
Iron
Rod
Iron
Cap
Plastic
Stone
GLO
WVGG W
NO SCALE
SYMBOLS AND ABBREVIATIONS
]Int_ft
2D
[
c:\p
w-w
ork\d0262104\or-a0577801jb.d
gn
NUMBER
SHEET
2
9:50 A
M
23 January 2
018
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
OREGON
TILLAMOOK COUNTY
OR TILLAMOOK B780(1)
CAPE MEARES ROAD RELOCATION
STATE PROJECTSHEETS
TOTAL
OR
TILLAMOOK B780(1) 9
North Arrow
Miscellaneous Utility Features
Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
Utility Colors and Designators
(Underground utilities are denoted by bars on either side of desiginator)
Underground Utilities
Overhead/Above Ground Utilities
Building
Underdrain
Box Culvert
Pipe Culvert with Drop Inlet
Pipe Culvert with Headwall
Pipe Culvert with End Section
Pipe Culvert (arrow shows flow)
Signs (single, double post; portable)
Retaining Wall
Cattleguard
Gate with Fence
Fence
Transition
Toe of Fill
Slope Stake Limits Top of Cut
Detour Centerline Not Applicable
Roadway Centerline
Construction Easement Not Applicable
Permanent Easement
Right-of-Way Line
PROPOSEDEXISTING
FM = force main, SA = sanitary sewer, SD = storm drain, SS = storm sewer,
P = power,
UP = transformer or junction box, EM = electric meter,
WF = water fountain
T = telephone pedestal, TV = CATV pedestal,
IRR = irrigation, W = water, STEAM = steam, G = gas, O = oil,
FO = fiber optic, T = telephone, TV = CATV
Spot Elevation; Coordinate Grid Tick
Indian Reservation Boundary
BLM Lands Boundary
National Wildlife Refuge Boundary
National Forest Boundary
National Park Boundary
City Boundary
County Boundary
State Boundary
National Boundary
Treeline
Individual Trees
Material Source
Type:
Survey Monument
Common Ownership
Parcel Number
Property Line w/Found Property Corner
Section Corner (Found, Projected)161
Section Line161
Section Corner (Found, Projected)41
Section Line41
Section Corner (Found, Projected)
Section Line
Township or Range Line
Gas & Water Meter; Gas & Water Valve
Intermittent Drainage or Small Creek
Edge of Water (OHW)
Large Creek or River
Spring or Seep
Lake, Pond or Reservoir; Marshland
Trail
Railroad
Existing Roadway (Road, Paved, Gravel)
Clearing Limits
appr.
AH
ADT
abut.
brg.
br.
BP
BM
BK
CUYD
culv.
CUFT
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D
exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.61 ft
e
E
ftg.
ft3
ft2
flg.
fin.
galv.
ga.
HW
hex.
hdwl.
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L
mon.
min.
MGAL
max.
matl.
M.P.
M.L.
NC
N
OG
OD
o. to o.
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT
reqd.
reinf.
rdwy.
R/W
R.
R
sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S
typ.
Ts
TS
thd.
TBM
T.
T
VPI
vph
V
W
yd3
yd2
spiral central angle
diameter
curve central angle
total central angle
approach
ahead
average daily traffic
abutment
bearing
bridge
balance point
bench mark
back
cubic yard(s)
culvert
cubic foot (feet)
centers
point of curve to spiral
continuous
construction joint
connection
concrete
column
corrugated metal pipe
clear
centerline
center to center
drawing(s)
distance
diaphragm
diagonal
diameter
design hourly volume
diameter
expansion joint
excavation
edge of water
edge of road
equation
edge of pavement
embankment
elevation
elevation with number
superelevation rate
east
footing
cubic foot (feet)
square foot
flange
finish
galvanized
gage (gauge)
high water
hexagon
headwall
joint
inside diameter
low water
left
length of spiral
lump sum
longitudinal
linear foot (feet)
latitude
lamination
length of curve
monument
minimum
thousand gallon
maximum
material
mile post
main line
normal crown
north
original ground
outside diameter
out to out
on center
pavement
point of tangent
point of spiral to tangent
point of spiral to curve
point of tangent to spiral
point on tangent
point on spiral
point on curve
plate
point of intersection
point of curve to spiral
point of compound curve
point of curve
route
right
required
reinforcement
roadway
right-of-way
range
radius
symmetrical
point of spiral to tangent spiral
structural
stiffener
stringer
standard
station
point of spiral to tangent
point of spiral to spiral (no curve)
point of spiral to reverse spiral
square yard
square foot
spacing, spaces or spaced
slurry unit
shoulder
section
point of spiral to curve
seasonal average daily traffic
south
typical
tangent distance (spiraled curve)
point of tangent to spiral
thread
temporary bench mark
township
tangent distance
vertical point of intersection
vehicles per hour
design speed
west
cubic yard(s)
square yard
TYPICAL SECTION
]Int_ft
2D
[
c:\p
w-w
ork\d0262104\or-a0577801jc.d
gn
NUMBER
SHEET
3
10:51 A
M
5 A
pril 2
019
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
OREGON
TILLAMOOK COUNTY
OR TILLAMOOK B780(1)
CAPE MEARES ROAD RELOCATION
STATE PROJECTSHEETS
TOTAL
OR
TILLAMOOK B780(1) 9
FOOTNOTE:
See Section 609 for anchoring methods.[5]
The field notes reflect the curve widening.
Apply half of the curve widening to both traveled ways.[4]
distance proportionally.
height dimension and reduce the front slope rounding
For cut heights less than "B" reduce "B" to the cut [3]
Construct slopes as shown in the Staking Report.[2]
indicated on the plan and profile curve data.