Office Condo Site Exclusively Listed by ATX Investments, Lila Nelson Beard, President Foam Insulation Reducing Air Leakage, Outside Sound Intrusion and Increasing Indoor Air Quality Landscaping Exceeds Ordinance Requirements The Design Incorporates Sustainable “Green Building” Approach. Office Condos For Sale Crystal Falls Parkway Leander, Texas FOR MORE INFORMATION Lila Nelson Beard (512) 657-7349 [email protected]ATX Investments 4408 Spicewood Springs Rd. Suite 203 Austin, TX 78759
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Office Condo Site Exclusively Listed by ATX Investments, Lila Nelson Beard, President
The Oaks on Crystal Falls Office Condominium development will consist of approximately 24,000+/- square foot of Medical-Professional office condos conveniently located on Crystal Falls Parkway(CR 275) the major East / West corridor in Leander, Texas.
Office Condos designed to incorporate sustainable "Green" building ranging from approximately1200 to 5000 square feet with a 1:210 parking ratio.
The Oaks on Crystal Falls is architecturally designed with the character of the great southwest withhandcrafted native Texas limestone columns and metal roofs.
The Oaks on Crystal Falls is located in Leander’s fastest growing market, convenient to Triad RegionalMedical Center, Seton Surgery Center, Scott and White, retail shopping, restaurants and manyneighborhoods.
Although ATX INVESTMENTS has used reasonable care in obtaining data and making estimates and projections based upon that data, this material is submitted without representation warranty.
control of ATX INVESTMENTS. No representation is made
2005 Demographics
Population Race
Total Population 51,941 White 74.47%
Male Population 50.0% Black 4.61%
Female Population 50.0% American Indian/Eskimo 0.23%
Office Condo Site Exclusively Listed by ATX Investments, Lila Nelson Beard, President
PRICE LIST
Prices below reflect purchasing a "modified" black box. Purchasers will be provide a corewhich will include an ADA bathroom (fixtures only) no finishes, a mechanicalequipment / storage room and plumbing stub outs for conference / break room. Powerwill be brought to box at side of building but panel will not be supplied. Conduits willbe run to buildings with communication lines. Interior finish out cost will be added intothe loan and escrowed for release as interior finish out is constructed.