NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Jan 04, 2016

Download

Documents

Madeline Gibbs
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.
Page 2: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.
Page 3: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

NTSB StaffNTSB StaffRon Hynes IIC, Operations & MechanicalCy Gura Track, Signals & IICJim Henderson Hazmat & Emergency ResponseTom Lasseigne Environmental Derek Nash Materials Laboratory Ruben Payan Event Recorders Robert Moore WriterMargaret Athey EditorChristy Spangler Graphics

Estimated 3,100 man hours working on investigation

Page 4: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Parties Parties

• Federal Railroad Administration

• Canadian National Railroad

• ERICO Products Incorporated

• Brotherhood of Locomotive Engineers and Trainmen

Page 5: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Insulated Joint PlugInsulated Joint Plug

Page 6: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

 

Tamaroa Failure

Bond Wire Locations

Page 7: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Safety IssuesSafety Issues

• The effect of bond wire welding on rail integrity.

• Inconsistent instructions regarding the exothermic welding of bond wires.

Page 8: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.
Page 9: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.
Page 10: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Factors in Tamaroa Rail FailureFactors in Tamaroa Rail Failure

• Bond wire welds created brittle steel (untempered martensite)

• Decreased track support (soft ballast)

• Location of bond wire welds

Page 11: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.
Page 12: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Head of Rail

Exothermic Weld

Bond Wire

Page 13: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Tamaroa Track ConditionsTamaroa Track Conditions

• Soft ballast conditions

• Increased bending stresses

Page 14: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.
Page 15: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

ConclusionConclusion

• The known soft ballast condition in the area of the insulated joint increased the amount of rail flexing in that area which, in turn, significantly increased stresses in the rail.

Page 16: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

ConclusionConclusion

• The increased stresses due to the flexing of the rail in the area of the insulated joint caused the propagation of the cracks that had originated in areas of untempered martensite at the rail head, causing the rail to fail only 17 days after installation.

Page 17: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

St. John’s Insulated Joint PlugSt. John’s Insulated Joint Plug

Page 18: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

St. John’s Insulated Joint PlugSt. John’s Insulated Joint Plug

• Failed at an exothermic bond wire weld

• The welds were made on a high stress area outside the confines of insulated joint bars

Page 19: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.
Page 20: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Materials Laboratory Examinations

Derek Nash

Page 21: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Tamaroa Insulated JointTamaroa Insulated Joint

Page 22: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Tamaroa Insulated Joint Pieces (Field Side View)

Page 23: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Field side joint bar

Gage side joint bar

Rail head

Fracture Face North of Insulated JointFracture Face North of Insulated Joint

Page 24: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Rail

Heat affected zone

Section Through Rail Head FractureSection Through Rail Head Fracture

Page 25: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

CADWELD Demonstration WeldsCADWELD Demonstration Welds

Page 26: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.
Page 27: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Weld

Rail

Bond wire

Section of a Demonstration WeldSection of a Demonstration Weld

Page 28: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

St. Johns RailSt. Johns Rail

Page 29: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.
Page 30: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Weld

Rail

Heat affected zone A

Heat affected zone B

Rail

Heat affected zone C

St. Johns Rail Sections

Page 31: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Materials Laboratory Observations

•Bond wire welding produced untempered martensite.

•Fatigue cracks developed from areas of untempered martensite.

•The bond wire welds had been located at a high stressed portion of the insulated joint.

•The bond wire at the fracture initiation of the St. Johns rail had been installed on top of a previous bond wire weld.

Page 32: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.
Page 33: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Bond Wire Welding LocationsBond Wire Welding Locations

• Applied to the rail head, web, or base

Page 34: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Head of Rail

Exothermic Weld

Bond Wire

Bond Wire on Rail Head

Page 35: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Exothermic Weld

Bond Wire

Webof Rail

Bond Wire on Rail Web

Page 36: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Baseof Rail

Exothermic Weld

Bond Wire

Bond Wire on Rail Base

Page 37: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

American Railway Engineering and Maintenance-of-Way Association (AREMA)

American Railway Engineering and Maintenance-of-Way Association (AREMA)

Page 38: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Bond Wire Welding LocationsBond Wire Welding Locations

• AREMA allows placing welds at rail head

• ERICO instructions recommend welds at rail web

• UP reports problems from welds at rail web

• Further study is needed to develop guidance on placement of bond wire welds

Page 39: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Discrepancies Found in ERICO’s Cadweld Literature

Discrepancies Found in ERICO’s Cadweld Literature

• States that untempered martensite would not be produced in the welding process

• All welds examined during the investigation contained untempered martensite

• Other inconsistencies were also found in Cadweld bonding instructions

Page 40: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Rail Defects from Exothermic Bond Wire Welding

Rail Defects from Exothermic Bond Wire Welding

• About 64,000 rail defects found during rail inspection

• 327 rail defects from exothermic bond wire welding

• CN has a defect code for data entry

Page 41: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Rail Defects from Exothermic Bond Wire Welding

Rail Defects from Exothermic Bond Wire Welding

• An undetermined quantity on the Long Island Rail Road, BNSF, UP, & CSX

• UP has reported split-web defects in heavy haul territory

Page 42: NTSB Staff Ron HynesIIC, Operations & Mechanical Cy GuraTrack, Signals & IIC Jim Henderson Hazmat & Emergency Response Tom Lasseigne Environmental Derek.

Federal Railroad AdministrationFederal Railroad Administration

• No defect code for rail defects caused by bond wire welding in 49CFR213.113, Defective Rails

• No derailment cause code in the FRA Guide for Preparing Accident/Incident Reports