SUMMER TRAINING 2014 NTPC LIMITED BADARPUR THERMAL POWER STATION Presented by Alok Yadav 1103021006
26
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NTPC Summer Training Presentation

SUMMER TRAINING

2014

NTPC LIMITED

BADARPUR THERMAL

POWER STATION

Presented by –

Alok Yadav

1103021006

Page 2: NTPC Summer Training Presentation

INDEX

1) INTRODUCTION

2) ABOUT BTPS

3) OPERATION OF POWER PLANT

4) PARTS OF A POWER PLANT

5) ELECTRICAL MAINTENANCE DEPARTMENT-I

6) ELECTRICAL MAINETNANCE DEPARTMENT-II

7) CONTROL AND INSTRUMENTATION

8) REFERENCES

Page 3: NTPC Summer Training Presentation

INTRODUCTION

India’s largest power company, Set up in 1975

to accelerate power development in India.

became a Maharatna company in 2010.

The total installed capacity is 43,019 MW (17

coal based, 7 gas based stations and 7 solar

based plants).

Target of an installed power generating

capacity of 1,28,000 MW by the year 2032.

Page 4: NTPC Summer Training Presentation

About BTPS Established on 1973 and it was the part of

Central Government. On 01/04/1978 is was

given to NTPC.

Started with a single 95 MW unit.

2 more units (95 MW each) installed in next

2 consecutive years.

Now it has total five units with total capacity of

720 MW. Ownership of BTPS was transferred to

NTPC with effect from 01.06.2006

Page 5: NTPC Summer Training Presentation

Given below are the details of unit with the year

they’re installed

Page 6: NTPC Summer Training Presentation

Basic Steps of Electricity Generation

Generation of electricity involves following

steps:

Coal to steam

Steam to mechanical power

Mechanical power to electrical power

Page 7: NTPC Summer Training Presentation

OPERATION OF A POWER PLANT

Generator works on the principle of FARADAY’s Law . To change the flux ,turbine is moved in a great speed with steam.

To produce steam, water is heated in the boilers by burning the coal.

After it passes through the turbine, the steam is condensed in a condenser.

The BTPS has Steam Turbine-Driven Generatorswhich has a collective capacity of 705 MW.

Page 8: NTPC Summer Training Presentation

PARTS OF A POWER PLANT1. Cooling tower

2. Cooling water pump

3. Transmission line (3-phase)

4. Unit transformer (3-phase)

5. Electric generator (3-phase)

6. Low pressure turbine

7. Condensate extraction pump

8. Condenser

9. Intermediate pressure turbine

10. Steam governor valve

11. High pressure turbine

12. Deaerator

13. Feed heater

14. Coal conveyor

15. Coal hopper

16. Pulverised fuel mill

17. Boiler drum

18. Ash hopper

19. Super heater

20. Forced draught fan

21. Reheater

22. Air intake

23. Economiser

24. Air preheater

25. Precipitator

26. Induced draught fan

27. Flue Gas

Page 9: NTPC Summer Training Presentation

ELECTRICAL MAINTENANCE DEPARTMENT – I (EMD-I)

It includes:

Motors

High Tension/Low Tension Switchgear

Coal handling plant

Page 10: NTPC Summer Training Presentation

MOTORS

AC MOTORS

Squirrel cage motor

Slip ring induction motor

In modern thermal power plant three phase

squirrel cage induction motors are used but

sometime double wound motor is used when we

need high starting torque.

Ns (speed) =120f/p

Page 11: NTPC Summer Training Presentation

SWITCH GEAR

Switching device that opens & closes a circuit and defined as apparatus used for switching, Lon rolling & protecting the electrical circuit & equipments.

Concerned with switching & interrupting currents either under normal or abnormal operating conditions.

Circuit breakers used in B.P.T.S are VCB, OCB, and SF6 gas circuit breaker.

The most expensive circuit breaker is the SF6 type .

Various manufacturer:VOLTAS, JYOTI, and KIRLOSKAR.

It includes switches, fuses, circuit breakers, relays & other equipments.

Page 12: NTPC Summer Training Presentation

OIL CIRCUIT

BREAKERS

AIR CIRCUIT

BREAKERS

SF6 CIRCUIT

BREAKERS

Page 13: NTPC Summer Training Presentation

COAL HANDLING PLANT (CHP)

The coal handling plant consists of two plants:

Old Coal Handling Plant (OCHP)

New Coal Handling Plant (NCHP)

The OCHP supplies coal to Unit- I, II, III &

NCHP supplies coal to Unit- IV and V.

COAL SUPPLIED AT BTPS

Coal is supplied to BTPS by Jharia coal mines.

Page 14: NTPC Summer Training Presentation
Page 15: NTPC Summer Training Presentation

CHP Control Room

Page 16: NTPC Summer Training Presentation

ELECTRICAL MAINTENANCE DEPARTMENT –II (EMD-II)

It includes:

Generators

Transformers

Switch yard

Page 17: NTPC Summer Training Presentation

GENERATORS The generator works on the principle

of EMI.

The stator cooling is done by de-mineralized (DM) water through hollow conductors.

A boiler and a turbine are coupled to electric generators.

Steam from the boiler is fed to the turbine through the connecting pipe. Steam drives the turbine rotor.

The turbine rotor drives the generator rotor which generate electricity.

Page 18: NTPC Summer Training Presentation

RATINGS OF THE GENERATORS USED

Turbo generator 100MW

Turbo generator 210 MW

The 100 MW generator generates 10.75 KV and 210 MW generates 15.75 KV. The voltage is stepped up to 220 KV with the help of transformer and is connected to the grid.

The voltage is stepped down to 6.6 KV with the help of UNIT TRANSFORMER and this voltage is used to drive the HT motors.

The voltage is further stepped down to 415 V and then to 220 V and this voltage is used to drive LT Motors.

Page 19: NTPC Summer Training Presentation

TRANSFORMERS

Static machine which increases or decreases the AC voltage without changing the freqency of the supply.

It is a device that: Transfer electric power from one circuit

to another.

It accomplishes this by electromagnetic induction.

In this the two electric circuits are in mutual inductive influence of each other.

WORKING PRINCIPLE:It works on FARADAY’S LAW OF ELECTROMAGNETIC INDUCTION.

Page 20: NTPC Summer Training Presentation
Page 21: NTPC Summer Training Presentation

SWITCH YARD

Electrical energy can’t be stored like cells, so what we generate should be consumed instantaneously.

But as the load is not constants therefore we generate electricity according to need i.e. the generation depends upon load.

The yard is the places from where the electricity is send outside. It has both outdoor and indoor equipments.

OUTDOOR EQUIPMENTS

BUS BAR.

LIGHTENING ARRESTER

BREAKER

CAPACITATIVE VOLTAGE TRANSFORMER

EARTHING ROD

CURRENT TRANSFORMER.

POTENTIAL TRANSFORMER

INDOOR EQUIPMENTS

RELAYS.

CIRCUIT BREAKERS

Page 22: NTPC Summer Training Presentation
Page 23: NTPC Summer Training Presentation
Page 24: NTPC Summer Training Presentation

This division basically calibrates various instruments and takes care of any faults occur in any of the auxiliaries in the plant.

“Instrumentation can be well defined as a technology of using instruments to measure and control the physical and chemical properties of a material.”

Control and Instrumentation Department has following labs:

Manometry Lab.

Protection and Interlocks Lab.

Automation Lab.

Electronics Lab.

Water Treatment Plant.

Furnaces Safety Supervisory System Lab

CONTROL & INSTRUMENTATION

Page 25: NTPC Summer Training Presentation

References

Course Material for Trainees by NTPC,

Badarpur

Modern Power System Analysis

(By D P Kothari | I J Nagrath)

Wikipedia

www.ieee.org

Page 26: NTPC Summer Training Presentation