By:- Rohit (EE 2 nd year) Sch No 13- 1-3-043 NIT Silchar (2013-17)
By:-Rohit (EE 2nd year)Sch No 13-1-3-043NIT Silchar (2013-17)
A walk to power scenario in INDIAHistory
• The first demonstration of electric light in Calcutta was conduted 24 th July 1879.
• The first hydroelectric installation in India was installed near a tea estate
at Sidrapong for the Darjeeling Municipality in 1897.• The first hydroelectric power station in j&k was established at mohra in
baramulla by Maharaja Partap Singh in 1905. • Company(B.E.S.T.) set up a generation station in 1905 to provide
electricity for tramway.• The first electric train ran between Bombay’s Victoria Terminus and
Kurla along the Harbour Line.
First Hydel power station in India
The first Electric train introduced in 1928 between Colaba and Andheri.
India's and Asia's first nuclear reactor was the Apsara research reactor.
Electricity Production in India till 2012
Milestones achieved:
Sources of electricity in India by Installed Capacity as of 2013
NTPC Profile• Type Government owned corporation
Public company• Industry Electric Utility• Founded 1975• Headquarter New Delhi, India• Key people Arup Roy Choudhury
(Chairman & MD)• Products Electrical power
Natural gas• Services Electricity generation and distribution
natural gas exploration, production, transportation and distribution
• Revenue INR 73904 Crores (US$ 12.34 billion) (2013-14)• Net income INR 13834 Crores (US$ 2.31 billion) (2013-14)• Number of
employees 24,546 (April 2015)• Website www.ntpc.co.in
Vision To be the world’s largest and best power producer, powering . . India’s growth.
Mission Develop and provide reliable power, related products and services at
competitive prices, integrating multiple energy sources with innovative and eco-friendly technologies and contribute to society.
NTPC Growth Plan
21
NTPC BARH
Stage 1U#1 U#2 U#3
Stage 2U#4 U#5
Barh Super Thermal Power Station
Barh Super Thermal Power Station
Thank you