NSWLC Shipyard Modernization Project Bob Hillstrom, SMP Project Manager October 16, 2014
12

NSPS Deputy Ministers Governance Committee Meeting

Nov 22, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NSPS Deputy Ministers Governance Committee Meeting

NSWLC Shipyard Modernization Project

Bob Hillstrom, SMP Project Manager

October 16, 2014

Page 2: NSPS Deputy Ministers Governance Committee Meeting

Shipbuilding Stages of Construction • Fabrication

– Cutting of parts from raw material – Forming of parts

• Subassembly – Joining of parts by welding to create interim

products up to ~20 tonnes

• Block Assembly – Assembly of 12m x 12m standard hull blocks

• Pre-Outfitting – Installation of outfit on hull blocks

• Blast and Paint – Abrasive blasting for surface preparation – Coating of hull structure and outfit items

• Pre-Erection – Joining of blocks to create grand blocks

• Erection – Erecting and joining of grand blocks to create

the vessel

2

Page 3: NSPS Deputy Ministers Governance Committee Meeting

Panel Shop

Forming Shop

Block Assembly

Pre-Outfitting

N/C

B&P

Erection

Pre-Erection

Repair B&P

Careen Drydock

Building and Area Identification

Loadout

Pier

Page 4: NSPS Deputy Ministers Governance Committee Meeting

Facility Process Flow

Page 5: NSPS Deputy Ministers Governance Committee Meeting

Shop and Area Capabilities Subassembly Shop (24m x 168m)

• Cranes – (1) 20-tonne with permanent magnet lifting

beam for plates

– (1) 5-tonne for handling profiles

– (3) 10-tonne to support subassembly operations

• Robotic profile line – Automatically cuts, bevels, marks and provides

layout information from N/C files

5

Subassembly Shop Cranes

Plasma Cutting Machine

Robotic Profile Line

• Plasma cutting machine – Cuts plates up to 3m x 10m from N/C

files

• Oxy-Fuel cutting machine – Used for fitting aids and small parts

Page 6: NSPS Deputy Ministers Governance Committee Meeting

• New 1000T plate press

– Forms compound shape

in hull plating

– Capacity up to 60 mm

thick plate

• Existing forming equipment

– 1000T press brake

– 300T press brake

– 400T stiffener forming

– 500T C-frame press

– 8 ft plate rolls

6

Shop and Area Capabilities Forming Shop (14m x 130m)

1000T Plate Press

Page 7: NSPS Deputy Ministers Governance Committee Meeting

• Panel Line

– Automated conveyor line to produce

12m x 12m flat stiffened panels

• Single-side plate welding

• Panel cutting, layout & marking

• Stiffener fitting

• Stiffener welding

– Three manual stations at end of line for

installation of web frames, bulkheads,

etc.

7

Shop and Area Capabilities Panel Shop (28m x 170m)

Stiffener Fitting Gantry Panel Cutting

Single-Side Plate Welding

Page 8: NSPS Deputy Ministers Governance Committee Meeting

• Cranes

– (2) 40T bridge cranes each with two 40T trolleys for block turnover

– (2) 15T cranes for setting of web frames, bulkheads, etc.

8

Shop and Area Capabilities Block Assembly Shop (30m x 130m)

• Pin Jigs

– Telescoping pipes adjusted to height to match hull form configuration

– Supports accurate assembly of complex curved hull blocks

Chip Barge Construction in Block Assembly Pin Jig Upright and Base Pipes

Page 9: NSPS Deputy Ministers Governance Committee Meeting

9

Shop and Area Capabilities Blast and Paint Shops (New Const. 30m x 60m & Repair 28m x 76m)

• New Construction

– Two blast positions

• Steel grit vacuum and

elevator recovery system

• Dedicated dust collection

system

– Four paint positions

• Repair

– Building shell relocated to new foundation

– New cladding, ventilation and blasting equipment installed

– Accommodates vessels up to 75m in length and 22m in height

Exhaust Ventilation System New Construction Paint

Repair B&P Building Relocation Dust Collection System

Page 10: NSPS Deputy Ministers Governance Committee Meeting

10

Shop and Area Capabilities Pre-Outfitting Shop (New Const. 30m x 180m)

• Block outfitting

– Installation of outfit components on structural hull blocks

– 5 bays each 16m x 28m

– 10 block outfitting positions

• Module construction

– Installation of outfit components on a structural framework

– Two bays each 16m X 28m

Block Outfitting

Module Construction

Pre-Outfitting Shop

Page 11: NSPS Deputy Ministers Governance Committee Meeting

• 300T Goliath Crane

– Schedule • Order Feb 28, 2013

• Design Mar-June

• Manufacture June-Dec

• Erection Mar-Apr, 2014

• Test Aug

– Capabilities • 300T block lift

• 200T block turnovers

– Crane specifications • Two trolleys

– 2 x 100 T

– 1 x 150 T

• Hook height 70 m

• Bridge span 76 m

• Travel speed 30 m/min

• Hoist speed 12 m/min

11

Shop and Area Capabilities Pre-Erection and Erection (76m x 230m)

Page 12: NSPS Deputy Ministers Governance Committee Meeting

12

Shop and Area Capabilities Pre-Erection and Erection cont. (76m x 230m)

• Careen Drydock

– Capable of launching Panamax vessels up to ~200m

• SPMTs – 32 axles & 2 power units

– Grandblock and vessel moves to 960T

• Loadout Pier – Provides level vessel transfer to floating drydock

• Rolling Mobile Shelters

– (3) 30.5 m x 29m x 20m