Top Banner
NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS Chen 2006, COMPRES Chen 2006, COMPRES Meeting Meeting
16

NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

Jan 19, 2016

Download

Documents

Ashlee Sullivan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

NSLS X-Ray High Pressure Research Workshop

(February 25 - 26, 2006 )

Strategic Plan for XR-DAC at the NSLS

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

Page 2: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

NSLS X-Ray High Pressure Research Workshop: Current operation and vision into NSLS II

February 25 - 26, 2006 Brookhaven National Lab, Upton NY

Convener: Jay Bass, Jiuhua Chen, Tom Duffy, Mark Rivers, Don Weidner47 participants (plus written contributions from N. Ross and R. Angel (VT), P. Dera (GL), and W. Crichton (ESRF))

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

Page 3: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

Scientific Technical

Elasticity

Conveners: Andrew Campbell / Gabriel Gwanmesia

Convener:

Baosheng Li

http://www.mpi.stonybrook.edu/NSLS/XHP/BreakoutSession.html

http://www.mpi.stonybrook.edu/NSLS/XHP/BreakoutSession.html

Rheology

Convener:

Pamela Burnley

Conveners: Sean Shieh/Helene Couvy/ Shenghua Mei

http://www.mpi.stonybrook.edu/NSLS/XHP/BreakoutSession.html

http://www.mpi.stonybrook.edu/NSLS/XHP/BreakoutSession.html

Phase Transition

Convener:

Jie Li

Conveners: Kurt Leinenweber / Yue Meng

http://www.mpi.stonybrook.edu/NSLS/XHP/BreakoutSession.html

http://www.mpi.stonybrook.edu/NSLS/XHP/BreakoutSession.html

Crystallography/Melts

Conveners: Darren Locke / Lars Ehm

Convener:

Guoyin Shen

http://www.mpi.stonybrook.edu/NSLS/XHP/BreakoutSession.html

http://www.mpi.stonybrook.edu/NSLS/XHP/BreakoutSession.html

Breakout sessions and summaries URL

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

Page 4: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

Plans for the DAC Program at X-17 Renewal Proposal

•Retain white beam on X-17C •White and mono on X17B3

–Unique facility for white/mono single crystal•Redesign table in 17B3•Replace laser heating system in 17B3

–Motorized motions, solid state laser•Detectors to be bought

–MAR345 or equivalent (share 17C, 17B3)–MARCCD or equivalent (share 17C, 17B2, 17B3)

•Gas loading system based on APS design

Summary of DAC Breakout session (Convener: Mark Rivers)

http://www.mpi.stonybrook.edu/NSLS/XHP/NSLS%20workshop%20breakout%20DAC_Mark.ppt

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

Page 5: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

Minimum Staffing

•1 beamline scientist per station•1 post-doc per station

–Laser heating specialist–Post-docs with nearby university supervision (Princeton, Stony Brook)

•1 mechanical tech shared at NSLS COMPRES HP•1 software person shared at NSLS COMPRES HP•More post-docs from BNL?

Summary of DAC Breakout session (Convener: Mark Rivers) - cont.

http://www.mpi.stonybrook.edu/NSLS/XHP/NSLS%20workshop%20breakout%20DAC_Mark.ppt

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

Page 6: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

New Members of Joint Management Team:

Existing solo: Added:Mark Rivers Jiuhua Chen (SBU)(U Chicago) Tom Duffy (Princeton)

Alex Goncharov (GL)

Features:

On-site management- daily operation, user interaction

Local resources- SB machine shop, electronic shop, computer/software support

DAC expertise- laser heating, internal/external heating

Collaboration- X17B2/B3, MAP/DAC/NSLS-IR, COMPRES/NSLS

Leverage additional resources- NSLS/SB joint appointment

Scientific researchChen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

Page 7: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

APS, NSLS and ALS brilliance calculated based on specific beamline parameters (Mark Rivers).

— Dan Shim (Workshop on Synergy of 21st Century High-Pressure Science and Technology, 2006)

Page 8: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

Tony Yu

Lars Ehm

Q. Guo

1. <

Ga-Ga>

2. <

Ga-Ga>

3. <

Ga-Ga>

4. <

Ga-Ga>

Z. Zhong

Diffraction at E=80keVDiffuse scattering of liquid Ga

Page 9: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

NSLS II damping wiggler

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

APS, NSLS and ALS brilliance calculated based on specific beamline parameters (Mark Rivers); NSLS II brilliance from Steve Dierker.

Page 10: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

XR-DAC at the NSLS: five-year vision for COMPRES renewal

Continue and develop upon NSLS' long history of success in high pressure research

Continue to be a place where new ideas are generated and new techniques developed

Take full advantage of one of the best synchrotron sources in the US for high-pressure research

Lead the high-pressure community toward the new capabilities and opportunities associated with NSLS-II

Enable, nurture, and support research at the frontier of Geoscience, condensed matter physics, and materials science

Build a truly community based facility listening to the community voice

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

Page 11: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

XR-DAC at the NSLS: five-year strategic plan for COMPRES renewal

State-of-the-art laser heating and high-resolution diffraction capabilities (COMPRES support)

White/Mono dual capability

Single crystal diffraction (seeking for community/leveraging contributions)

New initiatives such as high-energy experiments on amorphous materials

Flexible beamlines with up-to-date technical capabilities well-supported by first-rate scientific staff

Modern support laboratory for centralized high pressure sample preparation at the NSLS

Pursue integration and coordination of high-pressure capabilities at NSLS to foster interaction and collaboration, enable the best experiments, and grow the user community

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

Page 12: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

Budgetary: based the community suggestions => $530K (opt)

Personnel •1 beamline scientist per station

•1 post-doc per station

•1 mechanical tech shared at NSLS COMPRES•1 software person shared at NSLS COMPRES

More post-docs from BNL?

Supplies, Service & Travel

COMPRES allowed budget request: =>$400K

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

Personnel ($347K)•1 beamline scientist per station

=> one per station (total 2)•1 post-doc per station

=> half per station (total 1) (Junior beamline scientist)

•1 mechanical tech shared at NSLS COMPRES•1 software person shared at NSLS COMPRES

=> 1/4 per station (total 1/2)More post-docs from BNL?joint faculty position (SB-NSLS) DOE / NY leverageSupplies, Service & Travel ($53K)

Page 13: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

Suggestions, Comments, Complaints:

Jiuhua Chen at [email protected]

Tom Duffy at [email protected]

Mark Rivers at [email protected]

Alex Goncharov at [email protected]

Bob Liebermann at [email protected]

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

Page 14: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.
Page 15: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting

01213-ID: Sector 13 - Insertion Device Beamline Beamline Specs

Energy Range Monochromator Type Resolution FluxBeam Size

(horiz x vert)

Unfocused Focused

4-45 keV Si 111     3mm x 1mm  

4-45 keV Si 111 with large mirror       60µm x 20µm

4-45 keV Si 111 with small mirror       2µm x 2µm

https://beam.aps.anl.gov/pls/apsweb/beamline_display_pkg.display_beamline?i_beamline_id=13-ID

Page 16: NSLS X-Ray High Pressure Research Workshop (February 25 - 26, 2006 ) Strategic Plan for XR-DAC at the NSLS.

Chen 2006, COMPRES MeetingChen 2006, COMPRES Meeting