04/03/2019 1 NPS 40’’ New Pipelines Design of two 40’’ new pipelines on a 3 km long jetty
8

NPS 40’’ New Pipelines...• Main Line equipment sizing and specification • Data Sheet & Specification of main line equipment (Line Pipe, Pig Trap, Long radius Bend, MLV, Barred

Mar 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NPS 40’’ New Pipelines...• Main Line equipment sizing and specification • Data Sheet & Specification of main line equipment (Line Pipe, Pig Trap, Long radius Bend, MLV, Barred

04/03/2019 1

NPS 40’’ New Pipelines

Design of two 40’’new pipelines ona 3 km long jetty

Page 2: NPS 40’’ New Pipelines...• Main Line equipment sizing and specification • Data Sheet & Specification of main line equipment (Line Pipe, Pig Trap, Long radius Bend, MLV, Barred

04/03/2019 2

Introduction

Scope of Work

Design of two 40’’ new pipelines on a 3 km long jetty.

• First Step: Basic Engineering• Second Step: Detail Engineering• Pipeline related Special Activities

Page 3: NPS 40’’ New Pipelines...• Main Line equipment sizing and specification • Data Sheet & Specification of main line equipment (Line Pipe, Pig Trap, Long radius Bend, MLV, Barred

04/03/2019 3

Basic Engineering

Pipelines Flow Assurance• Steady-State Analysis

• System Characteristics Curves

• Hydraulic Gradelines for diff erent Crude Oils

• Transient State Analysis

Thickness Calculations and Design Code Verifi cation

Page 4: NPS 40’’ New Pipelines...• Main Line equipment sizing and specification • Data Sheet & Specification of main line equipment (Line Pipe, Pig Trap, Long radius Bend, MLV, Barred

04/03/2019 4

Basic Engineering

Process Engineering• P&IDs• Process Data Sheet (Valves, SLOP, TRV,…)• Line sizing• Operating and Pigging Philosophy

Pipeline Engineering• Main Line equipment sizing and specification• Data Sheet & Specification of main line equipment

(Line Pipe, Pig Trap, Long radius Bend, MLV, Barred Tee,…)

Page 5: NPS 40’’ New Pipelines...• Main Line equipment sizing and specification • Data Sheet & Specification of main line equipment (Line Pipe, Pig Trap, Long radius Bend, MLV, Barred

04/03/2019 5

Detail Engineering

Detail Process Engineering development• P&IDs• Data Sheet• Lists

Support to plot plan and piping drawing

Technical Alignment

Vendor Follow-up• Line Pipe• Long Radius Bend and Pigability Tests• Barred Tee• Main Line Valve

Page 6: NPS 40’’ New Pipelines...• Main Line equipment sizing and specification • Data Sheet & Specification of main line equipment (Line Pipe, Pig Trap, Long radius Bend, MLV, Barred

04/03/2019 6

Special Activities

Leakage Analysis• Scope: Spill volume reduction with vertical Expansion Loop• Methodology: Spill volume calculation in a rupture case• Software: LedaFlow - Multiphase Flow Simulator

Page 7: NPS 40’’ New Pipelines...• Main Line equipment sizing and specification • Data Sheet & Specification of main line equipment (Line Pipe, Pig Trap, Long radius Bend, MLV, Barred

04/03/2019 7

Special Activities

Pre-commissioning & Hydro testing• Technical specification including:

• Hydraulic Test Operation Sequence• Plant arrangement description• Process Flow Diagram with instrumentation, connections, facilities and N° of PIGs for each phase

Two solutions proposed: One section vs two sections

Page 8: NPS 40’’ New Pipelines...• Main Line equipment sizing and specification • Data Sheet & Specification of main line equipment (Line Pipe, Pig Trap, Long radius Bend, MLV, Barred

04/03/2019 8

Special Activities

Pipeline Cleaning and Inerting – with PIG

Technical specifi cation including:• Plant preparation• Operations Sequence

• Cleaning fl uid• Cleaning Target Defi nition• N° of PIG launches• Nitrogen Displacement arrangement

• Operating Parameters• Pressure • Flowrate • Pig velocity • Volume

• Contingency Evaluation