NPDES REQUIREMENTS
35

NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

Dec 16, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

NPDES REQUIREMENTS

Page 2: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

NPDES REQUIREMENTSPollution Control is Contractor’s

responsibilityPennDOT is responsible for enforcementIts our Public DutyEnvironmental compliance is a major

initiative of the Department

Page 3: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

P.O.M. SECTION B 4 10-1

Page 4: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

E & S Plan Pollution Prevention Plan includesMaps and DrawingsNarrativeSequencing

Page 5: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

TerminologyNPDESBMPCCDRain Event

Page 6: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

Monitoring and ReportingAll NPDES Permits requireWeekly Inspection of SiteSite Inspection after every measureable rain

event within 24 hours Written reports for every inspectionInspections performed by Department and

Contractor

Page 7: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

VISUAL INSPECTION CHECKLIST

Page 8: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

So WhatNon-Functioning BMP repaired in 48 HrIf not fixed – PennDOT to report to CCDWhat makes more sense?

You Have contractor fix ORCall CCD to have contractor fix it

Details are in Permit

Page 9: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

So What if Contractor is Fined

It is his problemHe will have to pay the fineIt is not PennDOT’s faultWRONG

Page 10: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

IIC ResponsibilityAttain Transfer/ Co-Permittee Application Coordinate required Inspection process with

ContractorDetails how inspection reports are provided

to CCDRain gage on Project

Page 11: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

Violations - NOVWhat are they:Non-Functioning BMP from InspectionBMP not repaired after 48 hrsCCD comments that a BMP needs repairedNone of the above

Page 12: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

Violations - NOVOfficial NOV issued by DEP or CCDResult of Serious violation Has DEP Case Number on itDistrict must submit copy to

BOCMOffice of Chief CounselWithin 48 hours

Page 13: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

N.O.V. TRACKING

The NOV Tracking spreadsheet has been placed at the following location:

P:\Penndot Shared\NOV District Tracking\Notice of Violation Capture With Threat of NOV.xlsm

Page 14: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

N.O.V. TRACKING INFORMATION

COUNTYDEP REGIONSR/SECCONTRACT #ISSUING AGENCYCONTRACTORCONTRACTOR INFO

DATE OF VIOLATIONNATURE OF VIOLATIONDESCRIPTION OF VIOLATIONACTIVITY CAUSING N.O.V.RESOLUTIONSTATUS OF NOVCITATION AMOUNT

Page 15: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

APPROVAL FROM D.E.P. OR C.C.D.

Individual Permits(PAI)

General Permits(PAG)

Page 16: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

PERMIT RETURNED FROM D.E.P.

Page 17: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

PERMIT RETURNED FROM C.C.D.

Page 18: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

PERMIT DETAILS

Page 19: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

Permit ApprovalApproval with ConditionsE & S Plan, Post Construction Stormwater Management

(PCSM) Preparedness, Prevention and Contingency

(PPC) Plans

Page 20: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

E & S POLLUTION CONTROL PLAN

Page 21: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

E & S POLLUTION CONTROL PLAN

Page 22: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

P C S M PLAN EXAMPLE

Page 23: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

P C S M PLAN EXAMPLE

Page 24: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

P P C PLAN

Preparedness,Prevention

AndContingency

Plan

Page 25: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

P P C PLAN EXAMPLE

Page 26: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

P P C PLAN EXAMPLE

Page 27: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

TRANSFEREE/CO-PERMITTEE APPLICATION

Page 28: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

TRANSFEREE/CO-PERMITTEE APPLICATION

Page 29: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

TRANSFEREE/CO-PERMITTEE APPLICATION

MAKE SURE THAT ALL APPLICABLE PAGES ARE SIGNED BY ALL PARTIES

MAKE SURE DOCUMENT IS NOTARIZEDTHIS DOCUMENT IS VITAL IF CONTRACTOR

BEGINS WORK AND A VIOLATION OCCURS !

Page 30: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

BORROW EXCAVATION AND WASTE AREAS

E & S PLAN for all Borrow and waste AreasSUBMITTED TO THE DEPARTMENT and

AUTHORIZED C.C.D.FORM 4345 COMPLETEDENVIRONMENTAL DUE DILIGENCE FORM

COMPLETED

Page 31: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

OTHER ENTITIES (IF APPLICABLE)US ARMY CORPS OF ENG. WATER

OBSTRUCTION – ENCROACHMENT PERMITUS FISH & WILDLIFE SERVICEUS COAST GUARDPA DEPT OF ENVIRONMENTAL PROTECTIONPA FISH & BOAT COMMISSIONPA GAME COMMISSIONPA DEPT OF CONSERVATION &

NATURAL RESOURCES US ENVIRONMENTAL PROTECTION AGENCY

Page 32: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

EXPIRATION OF PERMIT

Revisions to the Permit may be necessary upon renewal!

Page 33: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

NOTICE OF TERMINATION MANAGEMENT REQUIREMENTS permittee or co-permittee must submit a

Notice of Termination (NOT) form signed with Signatory Requirements of this

permit. All NOTs certifying discharge termination are

to be sent to the Department, or the authorized County Conservation District.

Page 34: NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.

NOTICE OF TERMINATION

CCD indicated this is a MUSTC.C.D. will confirm that the stormwater

Management activities are complete.This relieves PennDot and the contractor

from any further responsibilities