Feb -0 7 May -07 Aug -07 Nov -0 7 Feb -08 May -08 Aug -08 Nov -08 Feb -0 9 May -09 Aug -0 9 Nov -09 Feb -10 May -10 Aug-10 Nov-1 0 Feb-11 May -11 Aug-11 Nov -11 Feb-12 May -12 Aug-12 Nov -12 0 50,000 100,000 150,000 200,000 250,000 300,000 SBHS: Monthly Electricity Usage On-Peak kWh Off-Peak kWh Cooling Degree Days Electricity (kWh) Now it is fixed. Fe Ap Ju Au Oc De Fe Ap Ju Au Oc De Fe Ap Ju Au Oc De Fe Ap Ju Au Oc De Fe Ap Ju Au Oc De Fe Ap Ju Au Oc De 0 5,000 10,000 15,000 20,000 25,000 SBHS: Monthly Gas Usage Therms Heating Deg Days Gas Use (therms) BILL ANALYSIS
7

Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.

Dec 27, 2015

Download

Documents

Polly Willis
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.

Feb-07

Apr-07

Jun-07

Aug-07

Oct-07

Dec-07

Feb-08

Apr-08

Jun-08

Aug-08

Oct-08

Dec-08

Feb-09

Apr-09

Jun-09

Aug-09

Oct-09

Dec-09

Feb-10

Apr-10

Jun-10

Aug-10

Oct-10

Dec-10

Feb-11

Apr-11

Jun-11

Aug-11

Oct-11

Dec-11

Feb-12

Apr-12

Jun-12

Aug-12

Oct-12

Dec-12

0

50,000

100,000

150,000

200,000

250,000

300,000

300

SBHS: Monthly Electricity Usage On-Peak kWh Off-Peak kWh Cooling Degree Days

Elec

trici

ty (k

Wh)

Cool

ing

Degr

ee D

ays

Now it is fixed.

Feb-07

Apr-07

Jun-07

Aug-07

Oct-07

Dec-07

Feb-08

Apr-08

Jun-08

Aug-08

Oct-08

Dec-08

Feb-09

Apr-09

Jun-09

Aug-09

Oct-09

Dec-09

Feb-10

Apr-10

Jun-10

Aug-10

Oct-10

Dec-10

Feb-11

Apr-11

Jun-11

Aug-11

Oct-11

Dec-11

Feb-12

Apr-12

Jun-12

Aug-12

Oct-12

Dec-12

0

5,000

10,000

15,000

20,000

25,000

0

500

1,000

1,500

2,000

SBHS: Monthly Gas Usage Therms Heating Deg Days

Gas U

se (t

herm

s)

Heati

ng D

egre

e Da

ys

BILL ANALYSIS

Page 2: Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.

RETRO-COMMISSIONINGBENCHMARKING

• Note, this case is extreme but it’s not alone.• It’s roughly 2.5 times the average use and cost.

1 -

MS

2 - E

lem

4 - E

lem

6 -

M

S

8 -

K-1

2

10

- H

S

12 -

Ele

m

14

- H

S

16 -

Ele

m

18

- H

S

20 -

Ele

m

22

- H

S

24 -

Ele

m

26 -

Ele

m

28

- M

S

30 -

Ele

m

32 -

Ele

m

34 -

Ele

m

36 -

Ele

m

38 -

Pre

-K

40 -

Ele

m

42

- H

S

43

- H

S

46 -

Ele

m

0

50

100

150

200

250

0

0.5

1

1.5

2

2.5

3

3.5SEDAC Illinois K-12 School Energy Use

IntensitiesGas kBtu/sf Electric kBtu/sf $/sf

kBtu

/sf-

yr

$/s

f

'09-'10

'08-'09

'10-'11

Page 3: Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.

Only consider renewables after implementing all of the previous ideas

The cost per unit energy saved of high efficiency equipment and improved design is less than the cost per unit of energy of wind or solar

Renewables do, however, make great marketing and educational opportunities and can be more affordable when incentives are available

EXTRA CREDIT: RENEWABLES

Page 4: Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.

4

Renewables:

• Plan the infrastructure now for future

• Select site-appropriate technologies

• Use to take last step to net-zero

EXTRA CREDIT

Page 5: Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.

Savings from renewables not shown in savings table

3 kW solar array funded through ICECF

Program to put panels on all schools

This site does not have sufficient wind resources to consider educational level turbine

CASE STUDY RENEWABLES

Page 6: Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.

Total Incremental Cost $546,120

Incentives $340,508

Final Incremental Cost $205,612

Annual Utility Savings w/o solar $33,037

Simple Payback 6.2 years

IRR (5% acceptable) 10.3%

Net Present Value (10 yr, 5%) $53,952

CASE STUDY SUMMARY

07/08 08/09 09/10 10/11 11/12 -

20.0

40.0

60.0

80.0

100.0 91.0 92.5 80.3

19.7

43.5 39.7

Energy Use Intensity

07/08 08/09 09/10 10/11 11/12 12/13

Page 7: Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.

STRATEGY SUMMARYForm & Environment

1. Orientation & Form

2. Insulation

3. Air Sealing

Loads

4. Lighting

5. Loads

Heating, Ventilating, & Air Conditioning

6. Heating

7. Cooling

8. Motors & Pumps

9. Building Automation

10. Commissioning

How SEDAC can help with new construction… Design Assistance

Public sector Private sector

Incentive Review Public Sector

Services are funded by DCEO or Utility at no charge to the project or owner