May 27, 2014 CALL NO. 101 CONTRACT ID NO. 144112 ADDENDUM # 1 Subject: Estill County, HSIP 5262 (051) Letting May 30, 2014 (1)Revised Detail Sheets Pages 32-36 and Pages 38-47 of 101 (2)Added - Edge Detail D Page 36(a) of 101 (3)Revised Bid Items Pages 100-101 of 101 Proposal revisions are available at http://transportation.ky.gov/Construction- Procurement/ . If you have any questions, please contact us at 502-564-3500. Sincerely, Diana Castle Radcliffe Director Division of Construction Procurement DR:ks Enclosures
19

November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

Jul 07, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

May 27, 2014

CALL NO. 101

CONTRACT ID NO. 144112

ADDENDUM # 1

Subject: Estill County, HSIP 5262 (051)

Letting May 30, 2014

(1)Revised – Detail Sheets – Pages 32-36 and Pages 38-47 of 101 (2)Added - Edge Detail D – Page 36(a) of 101

(3)Revised – Bid Items – Pages 100-101 of 101

Proposal revisions are available at http://transportation.ky.gov/Construction-

Procurement/.

If you have any questions, please contact us at 502-564-3500.

Sincerely,

Diana Castle Radcliffe

Director

Division of Construction Procurement

DR:ks

Enclosures

Page 2: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

(IR

VIN

E B

YP

ASS)

KY 49

9

289+00

290+00

291+

00

292+00

293+00

294+00

295+00

296+00

297+00

298+00

299+00

300+00

301+

00

302+00

303+00 3

04+00 305+00

306

+00

307+00

308+00

309+00

310

+00

311

+00

312

+00

313

+00

314

+00

315

+00

316

+00

317

+00

318

+00

319

+00

320

+00

321+

00

322+00

323+00

324+00

325+00

326+00

327+00

328+00

329+00

330+00

331+

00

332+00

333+00

334+00

335+00

336+00

337+00

338+00

339+00

340+00

PC 296+03.4

7

PT 329+68.10

C

C

12’

6’6’

12’

10’

10’

310

+77.51

309+67.51

10’

12’

8’

12’

2’

8’

8’

12’

+

+

311

+77.51

313

+97.51

315

+00.00

322+53.60

+

324+90.27

+

110.00’

100.00’

220.00’102.49’

-50.0

0

315

+00

-16

0.0

0

315

+00

-160.0

0

311+50-

180.00

315

+00

-180.0

0

310

+50

-250.0

0

310

+50

-50.00329+6

8.10

-50.00

309+00

50.0

0’

309+50

80.00’

309+50

50.00’

315+50

80.00’

315+50

305+27.51

LANE TAPER550’

50.00’

306+00

60.00’

306+00

-16

0.0

0

314

+00

KY 1457

KY 52

(SAND HILL ROAD)

KY 1457

IRVINE

COUNTY:ESTILL STATE:KENTUCKY ITEM: 10-924.00 SHEET: PROJECT MAP

INSTALL LEFT TURN LANE AT MP 5.45 TO MP 5.840

NEAR: KY 1457 (SAND HILL) INTERSECTION

SITE: ESTILL COUNTY KY 52 HSIP PROJECT

$$$$desig

n$file

$specific

atio

n$$$$

FIL

E

NA

ME:

$$$$

US

ER$$$$

US

ER:

$$$$

DA

TE$$$$

DA

TE: Transportation

Kentucky

RIC

HM

ON

D

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 32 of 101

REVISED: 5-26-14

Page 3: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

ITEM

PR

OJE

CT

T

OT

AL

1.25" CLASS 2 ASPH SURF 0.38 D PG 64-22 96143.0" CLASS 2 ASPH BASE 1.0 D PG 64-22 3016.0" CLASS 2 ASPH BASE 1.0 D PG 64-22 40219.0" CLASS 2 ASPH BASE 1.0 D PG 64-22 18760.5" ASPHALT LEVELING & WEDGING 54654.0" CRUSHED STONE BASE 1357FULL DEPTH CRUSHED STONE BASE (1) 1335ASPHALT SEAL COAT (2) 1970ASPHALT SEAL AGGREGATE (2) 19703" PAVE MILLING (LONGITUDINAL EDGE KEY) 6643" PAVEMENT MILLING 4422

(1) 11.5 INCH DEPTH(2) TOTAL SY YD FOR 2 COURSES

SQUARE YARD

PAVING AREA

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 33 of 101

REVISED: 5-26-14

Page 4: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

ED

GE

DT

AIL

S

&

TY

PS

IT

EM

10-0924.0

0

TU

RN

LA

NE

S A

T M

.P. 5

.45 T

O 5

.84

RIC

HM

ON

D-IR

VIN

E R

OA

D (K

Y 5

2)

ES

TIL

L C

OU

NT

Y

TY

PIC

AL

SE

CT

ION

S

DE

TA

IL S

HE

ET

1 O

F 7

CL

EX

CL

PR

12

’1

2’

10

’1

2’

12

’1

0’

4’

2’

2’

SH

LD

SH

LD

TU

RN

ING

LA

NE

SH

LD

R/W LINE

RIC

HM

ON

D-IR

VIN

E R

OA

D (K

Y 5

2)

TY

PIC

AL

SE

CT

ION

S

ED

GE

DE

TA

IL B

ED

GE

DE

TA

IL C

ED

GE

DE

TA

IL A

CONST (19

60’s)

ORIGIN

AL

CONST (19

60’s)

ORIGINAL

SH

LD

8’

12

2:1

4:1

2’

ED

GE

DE

TA

IL D

1 8

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 34 of 101

REVISED: 5-26-14

Page 5: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

ED

GE

DT

AIL

S

&

TY

PS

IT

EM

10-0924.0

0

TU

RN

LA

NE

S A

T M

.P. 5

.45 T

O 5

.84

RIC

HM

ON

D-IR

VIN

E R

OA

D (K

Y 5

2)

ES

TIL

L C

OU

NT

Y

ED

GE

DE

TA

IL

S A

& B

3"

1.2

5"

3.0

0" A

SP

HA

LT

BA

SE

1.0

0 P

G64-22

3.0

0" A

SP

HA

LT

BA

SE

1.0

0 P

G64-22

1.2

5" A

SP

HA

LT

SU

RF

AC

E 0

.38

PG

64

-2

2

ED

GE

DE

TA

IL A

ED

GE

DE

TA

IL B

EX

IST

ING

DG

A B

AS

E

PA

VE

D S

HO

UL

DE

RT

RA

FF

IC L

AN

E

DE

TA

IL

SH

EE

T 2

OF

7

WE

DG

ING

LE

VE

L &

MIL

L 2

.75

"+

/- D

EP

TH

EX

IST

ING

PA

VE

ME

NT

EX

IST

ING

DG

A B

AS

EE

XIS

TIN

G D

GA

BA

SE

MIL

LIN

G

KE

Y-IN

18"

3.0

0" A

SP

HA

LT

BA

SE

1.0

0 P

G64-22

3.0

0" A

SP

HA

LT

BA

SE

1.0

0 P

G64-22

3.0

0" A

SP

HA

LT

BA

SE

1.0

0 P

G64-22

1.2

5" A

SP

HA

LT

SU

RF

AC

E 0

.38

PG

64

-2

2

MIL

L 3

"+

/- D

EP

TH

3.0

0" A

SP

HA

LT

BA

SE

1.0

0 P

G6

4-2

2

8

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 35 of 101

REVISED: 5-26-14

Page 6: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

ED

GE

DT

AIL

S

&

TY

PS

IT

EM

10-0924.0

0

TU

RN

LA

NE

S A

T M

.P. 5

.45 T

O 5

.84

RIC

HM

ON

D-IR

VIN

E R

OA

D (K

Y 5

2)

ES

TIL

L C

OU

NT

Y

ED

GE

DE

TA

IL C

ED

GE

DE

TA

IL C

DE

TA

IL

SH

EE

T 3

OF

7

3.0

0" A

SP

HA

LT

BA

SE

1.0

0 P

G64-22

3.0

0" A

SP

HA

LT

BA

SE

1.0

0 P

G64-22

1.2

5" A

SP

HA

LT

SU

RF

AC

E 0

.38 P

G64-22

PA

VE

D S

HO

UL

DE

R

3"

1.2

5"

EX

IST

ING

DG

A B

AS

EE

XIS

TIN

G A

SP

HA

LT

PA

VE

ME

NT

8

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 36 of 101

REVISED: 5-26-14

Page 7: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

Orig

in

al

IT

EM

10-0924.0

0

TU

RN

LA

NE

S A

T M

.P. 5

.45 T

O 5

.84

RIC

HM

ON

D-IR

VIN

E R

OA

D (K

Y 5

2)

ES

TIL

L C

OU

NT

Y

ED

GE

DE

TA

IL D

DE

TA

IL

SH

EE

T 3

A O

F 7

EX

IST

ING

PA

VE

ME

NT

EX

IST

ING

DG

A B

AS

E

WE

DG

ING

LE

VE

L &

MIL

L 2

.75

"+

/- D

EP

TH

MIL

LIN

G

KE

Y-IN

18

"

PA

VE

ME

NT

FU

LL

DE

PT

H

2’

3.0

0" A

SP

HA

LT

BA

SE

1.0

0 P

G64-22

3.0

0" A

SP

HA

LT

BA

SE

1.0

0 P

G64-22

3.0

0" A

SP

HA

LT

BA

SE

1.0

0 P

G64-22

1.2

5" A

SP

HA

LT

SU

RF

AC

E 0

.38 P

G64-22

PA

VE

D S

HO

UL

DE

RT

RA

FF

IC L

AN

ES

ED

GE

DE

TA

IL D

MIL

L 3

"+

/- D

EP

TH

4 8

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112 Page 36(a) of 101

ADDED: 5-26-14

Page 8: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

306+00

307+00

308+00

309+00

310+00

311+00

312+00

313+00

314+00

310+77.51

309+67.51

10’12’8’ 12’8’

8’12’

311+77.51

313+97.51

315+00.00

110.00’

100.00’

220.00’

102.49’

-180.00

310

+50

50.00’

315

+50

80.0

0’

315

+50

305+27.51

LANE TAPER

550’

RICH

MOND

CO

NS

TR

UC

TIO

N

ST

A. 3

05+

00 B

EG

IN

SC

AL

E 1

" =

10

0’

0’

50

’100’

Ex. R/

W

60.0

0’

306+00

50.00’

306+00

Ex. R/

W

80.0

0’

309+50

50.00’

309+50

Ex. R/

WEx. R/

W

Ex. R/

W

Ex. R/W

Ex. R/

W

Ex. R/

W

Ex. R/W

Ex. R/W

LANE TAPER

TAPER

BAY

STORAGE LANE

12’12’8’ 8’10

2’

12’8’

8’12’10’

2’

8’12’10’12’8’

2’

12’

12’

12’

12’10’10’

10’10’

8.3

2’

12’8’

2’

10’

IT

EM

10

-0

92

4.0

0

TU

RN

LA

NE

S A

T M

.P. 5

.45 T

O 5

.84

RIC

HM

ON

D-IR

VIN

E R

OA

D (K

Y 5

2)

ES

TIL

L C

OU

NT

Y

PL

AN

DE

TA

IL

ST

A 3

05

+0

0 -

31

5+

00

-250.00

310

+50

-180.00

315+00-16

0.00

311+

50

-160.00314+00

-160.00315+00

-50

+00

-50.0

0

309+

00

KY 52

IRVINE

KY 1457

SAND HILL

DE

TA

I S

HE

ET

5 O

F 8

CO

NS

TR

UC

T G

UA

RD

RA

IL-S

TE

EL

W B

EA

M-S

FA

CE

68

7.5

LIN

. FT

1 T

ER

M S

EC

NO

. 1

EN

D T

RE

AT

ME

NT

305+

00 -

311+

91

RT

ST

A -

RT

ST

A

A

A

EX

IS

TIN

G A

T S

TA

30

5+

00

TIE

PR

OP

OS

ED

GU

AR

DR

AIL

TO

RE

MO

VE

EX

IST

ING

GU

AR

DR

AIL

305+

00 -

311+

91

RT

ST

A -

RT

ST

A

68

7.5

LIN

. FT

CO

NS

TR

UC

T E

NT

RA

NC

E

312+

00

RT

ST

A

25

S.Y

.

TR

AF

FIC

BO

UN

D B

AS

E

31

3+

51

LT

ST

A

CO

NS

TR

UC

T A

SP

HA

LT

AP

RO

N O

N K

Y 1

457

14

S.Y

.

1.2

5 A

SP

HA

LT

SU

RF

AC

E

5 S

.Y.

FU

LL

DE

PT

H A

SP

HA

LT

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 38 of 101

REVISED: 5-26-14

Page 9: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

316+00

317+00

318+00

319+00

320+00

321+00

322+00

323+00

324+00

12’ 6’6’ 12’10’10’

322+53.60

324+90.27

10

0’

SC

AL

E 1

" =

100’

0’

50

8’12’10’12’8’

315+00.00

2’

2’

8’12’10’8’12’

CO

NS

TR

UC

TIO

N

ST

A. 3

25+

00 E

ND

245.50’

LANE TAPER

IT

EM

10

-0

92

4.0

0

TU

RN

LA

NE

S A

T M

.P. 5

.45 T

O 5

.84

RIC

HM

ON

D-IR

VIN

E R

OA

D (K

Y 5

2)

ES

TIL

L C

OU

NT

Y

PL

AN

DE

TA

IL

ST

A 3

15+

00 -

325+

00

-50.0

0

315

+00

50.00’

325+00

50.00

315+00

-50.00

325+00

Ex. R/

W

Ex. R/W

RICH

MOND

IRVINE

KY 52

CO

NS

TR

UC

T A

SP

HA

LT

EN

TR

AN

CE

AP

RO

NC

ON

ST

RU

CT

AS

PH

AL

T E

NT

RA

NC

E A

PR

ON

324+

23

323+

46

322+

44

32

1+

41

31

9+

83

318+

68

LT

ST

A

316+

92

LT

ST

A

-160.00

315+00

Ex. R/

WEx. R/

W

13

S.Y

.

10

S.Y

.

41 S

.Y.

14

S.Y

.

20

S.Y

.

16 S

.Y.

1.2

5 IN

CH

AS

PH

AL

T S

UR

FA

CE

8 S

.Y.

FU

LL

DE

PT

H A

SP

HA

LT

SH

EE

T 6

OF

8

CO

NS

TR

UC

T E

DG

E K

EY

56.0

LIN

. FT

32

5+

00

ST

A

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 39 of 101

REVISED: 5-26-14

Page 10: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

311+00

312+00

313+00

314+00

310+77.51

309+67.51

10’12’8’ 12’

2’

8’

8’12’

311+77.51

313+97.51

110.00’

100.00’

220.00’

102.49’

Existin

g R/

W

BAY TAPER

12’8’

12’ 12’10’ 8’8’

2’

12’12’ 8’12’8’

-160.00

314+00

80.00’

309+50

80.00’

315

+50

50.00’

315

+50

50.00’

309+50

4" D

BL YEL

4" D

BL YEL

4" S

OLID

WHITE

4" S

OLID

WHITE

4" S

OLID

WHITE

4" S

OLID

WHITE

4" D

BL YEL

4" S

OLID

WHITE

LANE TAPER LEFT

STORAGE LANE

Existin

g R/

W

Existin

g R/

W

RICH

MOND

IRVINE

KY 52

0’

50

’1

00

310+00

IT

EM

10-0924.0

0

TU

RN

LA

NE

S A

T M

.P. 5

.45 T

O 5

.84

RIC

HM

ON

D-IR

VIN

E R

OA

D (K

Y 5

2)

ES

TIL

L C

OU

NT

Y

50

.00

31

4+

00

SC

AL

E 1

" =

50’

KY 1457

SAND HILL

ST

A 3

10+

00 -

ST

A 3

14+

00

ST

RIP

ING

PL

AN

12’

12’

12’

12’10’

10’

10’

10’305+27.5

1

RICH

MOND

LANE TAPER

550’

TO

ST

A 3

09

+6

7.5

1

4" S

OLID

WHITE

4" S

OLID

WHITE

4" D

BL YEL

4" D

BL YEL

KY 52

310+00

TO

ST

A 3

05

+2

7.5

1

LA

NE

TA

PE

R

55

0’

LA

NE

TA

PE

R D

ET

AIL

SH

EE

T 7

OF

8

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 40 of 101

REVISED: 5-26-14

Page 11: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

321+00

322+00

323+00

324+00

325+00

12’ 6’6’ 12’10’10’

322+53.60

324+90.27

IT

EM

10

-0

92

4.0

0

TU

RN

LA

NE

S A

T M

.P. 5

.45 T

O 5

.84

RIC

HM

ON

D-IR

VIN

E R

OA

D (K

Y 5

2)

ES

TIL

L C

OU

NT

Y

RICH

MOND

IRVINE

50

SC

AL

E 1

" =

50’

10

0’

0’

ST

A 3

20+

00 -

ST

A 3

25+

00

ST

RIP

ING

PL

AN

4" S

OLID

WHITE

4" S

OLID

WHITE

8’12’2’

10’12’8’

4" S

OL

ID W

HIT

E

4" S

OLID

WHITE

TO

ST

AT

IO

N 3

15

+0

0

CO

NT

INU

E S

AM

E S

TR

IPIN

G

Existin

g R/

W

Existin

g R/

W

KY 52

2’

12’8’10’12’8’

SH

EE

T 8

OF

8

4" S

OLID YELLO

W

4" S

OLID YELLO

W4" S

OLID YELLO

W

DO

UB

LE

YE

LL

OW

TIE

TO

EX

.

4" S

OL

ID Y

EL

LO

W4" B

ROKEN YELLO

W

(ST

AN

DA

RD

DR

AW

ING

NO

. TP

M-1

40

-02

)

TO

GA

PS

AS

DIR

EC

TE

D B

Y T

HE

PR

OJE

CT

EN

GIN

EE

R.

OR

DIM

EN

SIO

NS

IN A

SIM

ILA

R R

AT

IO O

F L

INE

SE

GM

EN

TS

CO

NS

IST

OF

10

-FO

OT

LIN

E S

EG

ME

NT

S A

ND

30

-FO

OT

GA

PS

,

**N

OR

MA

L B

RO

KE

N Y

EL

LO

W L

INE

S S

HO

UL

D B

E

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 41 of 101

REVISED: 5-26-14

Page 12: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

ITEM 10-0924.00

TURN LANES AT M.P. 5.45 TO 5.84

RICHMOND-IRVINE ROAD (KY 52)

ESTILL COUNTY

GENERAL NOTES

GENERAL NOTES

BE DELIVERED TO THE LOCATION AS DIRECTED BY THE PROJECT ENGINEER.

THE DEPARTMENT WILL RETAIN OWNERSHIP OF ANY ASPHALT MILLING ON THIS PROJECT AND SHALL

ASPHALT MILLING

DEPARTMENT OF ADMINISTRATIVE SERVICES IN FRANKFORT, KY, AT (502)564-3670.

HEADWALL SUPPLEMENTAL BOOK MAY BE OBTAINED FROM THE POLICY SUPPORT BRANCH OF THE

STANDARD DRAWINGS ARE NOT ATTACHED TO THESE PLANS. A STANDARD DRAWING BOOK AND THE

STANDARD DRAWINGS650.

ACCORDING TO SUBSECTIONS 402.03.02 AND 402.03.10 OF THE STANDARD SPECIFICATIONS.

WILL ACCEPT THE COMPACTION OF ASPHALT MIXTURES FURNISHED ON THIS PROJECT BY OPTION B

COMPACTION OF ASPHALT MIXTURES448.

DETERMINE WHAT UTILITY COMPANIES HAVE FACILITIES IN THE AREA.

KY 811. IT MAY BE NECESSARY FOR THE CONTRACTOR TO CONTACT THE COUNTY COURT CLERK TO

COORDINATE EXCAVATION WITH THE UTILITY OWNERS, INCLUDING THOSE WHOM DO NOT SUBSCRIBE

TO BE MEMBERS OF THE KY 811 ONE-CALL BEFORE-U-DIG(BUD) SERVICE. THE CONTRACTOR MUST

CONTRACTOR SHOULD BE AWARE THAT OWNERS OF UNDERGROUND FACILITIES ARE NOT REQUIRED

PLACED A MINIMUM OF TWO (2) AND NO MORE THAN TEN (10) DAYS PRIOR TO EXCAVATION. THE

FOR INFORMATION ON THE LOCATION OF EXISTING UNDERGROUND UTILITIES. THE CALL IS TO BE

THE CONTRACTOR IS INSTRUCTED TO CALL 1-800-752-6007 TO REACH KY 811, THE ONE-CALL SYSTEM

BEFORE YOU DIG165.

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 42 of 101

REVISED: 5-26-14

Page 13: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

ITEM 10-0924.00

TURN LANES AT M.P. 5.45 TO 5.84

RICHMOND-IRVINE ROAD (KY 52)

ESTILL COUNTY

MAINTENANCE OF TRAFFIC NOTES

GENERAL NOTES

THE LUMP SUM BID TO "MAINTAIN AND CONTROL TRAFFIC."

SPEEDS THROUGH THE WORK ZONE SHALL BE ERECTED WHILE THE CONTRACTOR IS WORKING AND BE INCLUDED IN

13. PAYMENT FOR SPEED LIMIT SIGNS (INCLUDING MOUNTING HARDWARE AND POSTS) FOR ADVISEMENT OF REDUCED

12. REMOVE ALL PAVEMENT MARKING BY WATER BLASTING PROCESS TO THE SATISFACTION OF THE ENGINEER.

TRAFFIC. VEHICLES SHALL NOT PARK OR STOP EXCEPT WITHIN WORK AREAS DESIGNATED BY THE ENGINEER.

SHALL ENTER AND LEAVE WORK AREAS IN A MANNER WHICH NOT BE HAZARDOUS TO OR INTERFERE WITH NORMAL

11. THE CONTRACTOR’S VEHICLES SHALL ALWAYS MOVE WITH AND NOT AGAINST THE FLOW OF TRAFFIC. VEHICLES

PASSAGE OF THAT VEHICLE AS QUICKLY AS POSSIBLE.

OFFICIAL EMERGENCY RUN ARRIVES AT THE SCENE, THE CONTRACTOR SHALL MAKE THE PROVISIONS FOR THE

10. IF TRAFFIC SHOULD BE STOPPED DUE TO CONSTRUCTION OPERATIONS AND AN EMERGENCY VEHICLE ON AN

THE BREATHITT TRAFFIC BARN.

REMOVAL WITH THE ENGINEER. SIGNS AND POSTS SHALL BE SEPARATED, BONDED ON PALLETS AND DELIVERED TO

BY THE CONTRACTOR AT THE DIRECTION OF THE ENGINEER. THE CONTRACTOR IS ADVISED TO SCHEDULE SIGN

9. ALL KENTUCKY DEPARTMENT OF HIGHWAYS SIGNS (NON-ESSENTIAL AND NON-DIRECTIONAL) SHALL BE REMOVED

TRAFFIC.

OF THE FLOW OF TRAFFIC AND REMOVED STARTING AND PROCEEDING IN THE DIRECTION OPPOSITE THE FLOW OF

8. IN GENERAL, ALL TRAFFIC CONTROL DEVICES SHALL BE PLACED STARTING AND PROCEEDING IN THE DIRECTION

SIGNS ARE APPLICABLE OR ARE REMOVED.

DO NOT PROPERLY APPLY TO THE CURRENT TRAFFIC PHASING, AND SHALL MAINTAIN THE COVERING UNTIL THE

7. THE CONTRACTOR SHALL COMPLETELY COVER ANY SIGNS, EITHER EXISTING, PERMANENT OR TEMPORARY, WHICH

PROVIDED ADEQUATE SIGNING AND A FLAGPERSON ARE AT THE LOCATION.

HOWEVER, DURING WORKING HOURS, ONE-WAY TRAFFIC MAY BE ALLOWED AT THE DISCRETION OF THE ENGINEER,

6. THE CONTRACTOR SHALL MAINTAIN A TWO-LANE TRAVELED WAY WITH A MINIMUM LANE WIDTH OF 10 FEET.

OF THE CONTRACTOR WHEN NO LONGER NEEDED.

5. ANY TEMPORARY TRAFFIC CONTROL ITEMS, DEVICES, MATERIALS AND INCIDENTALS SHALL REMAIN THE PROPERTY

TRAFFIC ENGINEER.

4. THE CONTRACTOR SHALL SCHEDULE A REVIEW OF FINAL STRIPING PLANS PRIOR TO PLACEMENT WITH PROJECT

APPROVED BY THE ENGINEER BEFORE WORK CAN BE STARTED BY THE CONTRACTOR.

BEFORE TRAFFIC IS ALLOWED TO USE ANY LANE CLOSURES, CROSSOVERS OR DETOURS. ALL SIGNING SHALL BE

3. THE ENGINEER AND THE CONTRACTOR, OR THEIR AUTHORIZED REPRESENTATIVES, SHALL REVIEW THE SIGNING

IN THESE NOTES, THE PLANS, THE MUTCD OR THE ENGINEER.

NECESSARY FOR THE CONTROL AND PROTECTION OF VEHICULAR AND PEDESTRIAN TRAFFIC AS SPECIFIED

BARRICADES AND VERTICAL PANELS, PLASTIC DRUMS (STEEL DRUMS WILL NOT BE PERMITTED) AND CONES

B. ALL FLAGPERSONS AND TRAFFIC CONTROL DEVICES SUCH AS, BUT NOT LIMITED TO, FLASHERS, SIGNS

DEVICES AND MARKINGS.

A. ALL LABOR AND MATERIALS NECESSARY FOR CONSTRUCTION AND MAINTENANCE OF TRAFFIC CONTROL

AND CONTROL TRAFFIC" SHALL ALSO INCLUDE, BUT IS NOT LIMITED TO, THE FOLLOWING ITEMS AND OPERATIONS:

AND BRIDGE CONSTRUCTION UNLESS OTHERWISE PROVIDED FOR IN THESE NOTES. THE LUMP SUM BID TO "MAINTAIN

TO "MAINTAIN AND CONTROL TRAFFIC" AS SET FORTH IN THE CURRENT STANDARD SPECIFICATIONS FOR ROAD

2. All ITEMS OF WORK NECESSARY TO MAINTAIN AND CONTROL TRAFFIC WILL BE PAID AT THE LUMP SUM BID PRICE

SUPERVISOR AND DISTRICT TRAFFIC ENGINEER PRIOR TO ANY CONSTRUCTION.

DRAWINGS, CURRENT EDITIONS. THE TRAFFIC CONTROL PLAN SHALL BE REVIEWED AND APPROVED BY HAZARD SECTION

TRAFFIC CONTROL DEVICES, THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND THE STANDARD

THE PRE-CONSTRUCTION MEETING. TRAFFIC CONTROL PLAN SHALL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM

BE SUBMITTED TO HAZARD SECTION SUPERVISOR AND DISTRICT TRAFFIC ENGINEER AT LEAST TWO WEEKS PRIOR TO

1. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING A TRAFFIC CONTROL PLAN. THE TRAFFIC CONTROL PLAN SHALL

MOT SHEET 1 OF 2

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 43 of 101

REVISED: 5-26-14

Page 14: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

PAVEMENT DROP-OFF

A PAVEMENT EDGE THAT TRAFFIC IS NOT EXPECTED TO

CROSS, EXCEPT ACCIDENTALLY, SHOULD BE TREATED AS

FOLLOWS:

LESSER TREATMENTS THAN THOSE DESCRIBED ABOVE MAY BE CONSIDERED

FOR LOW-VOLUME LOCAL STREETS.

PAYMENT WILL BE ALLOWED FOR DGA, CSB AND OTHER SUITABLE MATERIALS USED FOR WEDGING.

LESS THAN TWO INCHES - NO PROTECTION REQUIRED. WARNING SIGNS SHOULD BE

PLACED IN ADVANCE AND THROUGHOUT THE DROP-OFF AREA.

TWO TO FOUR INCHES - PLASTIC DRUMS, VERTICAL PANELS OR BARRICADES

EVERY 100 FEET ON TANGENT SECTIONS FOR SPEEDS OF 50 MPH OR GREATER.

CONES MAY BE USED IN PLACE OF PLASTIC DRUMS, PANELS AND BARRICADES

DURING DAYLIGHT HOURS. FOR TANGENT SECTIONS WITH SPEEDS LESS THAN 50

MPH AND FOR CURVES, DEVICES SHOULD BE PLACED EVERY 50 FEET. SPACING OF

DEVICES ON TAPERED SECTIONS SHOULD BE IN ACCORDANCE WITH THE MANUAL ON

UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION.

GREATER THAN FOUR INCHES - POSITIVE SEPARATION OR WEDGE WITH 3:1 OR

FLATTER SLOPE NEEDED. IF THERE IS FIVE FEET OR MORE DISTANCE BETWEEN

THE EDGE OF THE PAVEMENT AND THE DROP-OFF, THEN DRUMS, PANEL, OR

POSITIVE SEPARATION IS STRONGLY ENCOURAGED. IF CONCRETE BARRIERS ARE

USED, SPECIAL REFLECTIVE DEVICES OR STEADY BURN LIGHTS SHOULD BE USED

IS GREATER THAN 12 INCHES.FOR OVERNIGHT INSTALLATIONS. BARRICADES MAY BE USED IF THE DROP-OFF

FOR TEMPORARY CONDITIONS, DROP-OFFS GREATER THAN FOUR INCHES MAY BE

PROTECTED WITH PLASTIC DRUMS, VERTICAL PANELS OR BARRICADES FOR SHORT

DISTANCES DURING DAYLIGHT HOURS WHILE WORK IS BEING DONE IN THE

DROP-OFF AREA.

*

*

*

BARRICADES MAY BE USED. IF THE DROP-OFF IS GREATER THAN 12 INCHES,

ITEM 10-0924.00

TURN LANES AT M.P. 5.45 TO 5.84

RICHMOND-IRVINE ROAD (KY 52)

ESTILL COUNTY

MAINTENANCE OF TRAFFIC NOTES

THE LUMP SUM BID TO "MAINTAIN AND CONTROL TRAFFIC."

SPEEDS THROUGH THE WORK ZONE SHALL BE ERECTED WHILE THE CONTRACTOR IS WORKING AND BE INCLUDED IN

13. PAYMENT FOR SPEED LIMIT SIGNS (INCLUDING MOUNTING HARDWARE AND POSTS) FOR ADVISEMENT OF REDUCED

12. REMOVE ALL PAVEMENT MARKING BY WATER BLASTING PROCESS TO THE SATISFACTION OF THE ENGINEER.

TRAFFIC. VEHICLES SHALL NOT PARK OR STOP EXCEPT WITHIN WORK AREAS DESIGNATED BY THE ENGINEER.

SHALL ENTER AND LEAVE WORK AREAS IN A MANNER WHICH NOT BE HAZARDOUS TO OR INTERFERE WITH NORMAL

11. THE CONTRACTOR’S VEHICLES SHALL ALWAYS MOVE WITH AND NOT AGAINST THE FLOW OF TRAFFIC. VEHICLES

PASSAGE OF THAT VEHICLE AS QUICKLY AS POSSIBLE.

OFFICIAL EMERGENCY RUN ARRIVES AT THE SCENE, THE CONTRACTOR SHALL MAKE THE PROVISIONS FOR THE

10. IF TRAFFIC SHOULD BE STOPPED DUE TO CONSTRUCTION OPERATIONS AND AN EMERGENCY VEHICLE ON AN

THE BREATHITT TRAFFIC BARN.

REMOVAL WITH THE ENGINEER. SIGNS AND POSTS SHALL BE SEPARATED, BONDED ON PALLETS AND DELIVERED TO

BY THE CONTRACTOR AT THE DIRECTION OF THE ENGINEER. THE CONTRACTOR IS ADVISED TO SCHEDULE SIGN

9. ALL KENTUCKY DEPARTMENT OF HIGHWAYS SIGNS (NON-ESSENTIAL AND NON-DIRECTIONAL) SHALL BE REMOVED

TRAFFIC.

OF THE FLOW OF TRAFFIC AND REMOVED STARTING AND PROCEEDING IN THE DIRECTION OPPOSITE THE FLOW OF

8. IN GENERAL, ALL TRAFFIC CONTROL DEVICES SHALL BE PLACED STARTING AND PROCEEDING IN THE DIRECTION

SIGNS ARE APPLICABLE OR ARE REMOVED.

DO NOT PROPERLY APPLY TO THE CURRENT TRAFFIC PHASING, AND SHALL MAINTAIN THE COVERING UNTIL THE

7. THE CONTRACTOR SHALL COMPLETELY COVER ANY SIGNS, EITHER EXISTING, PERMANENT OR TEMPORARY, WHICH

PROVIDED ADEQUATE SIGNING AND A FLAGPERSON ARE AT THE LOCATION.

HOWEVER, DURING WORKING HOURS, ONE-WAY TRAFFIC MAY BE ALLOWED AT THE DISCRETION OF THE ENGINEER,

6. THE CONTRACTOR SHALL MAINTAIN A TWO-LANE TRAVELED WAY WITH A MINIMUM LANE WIDTH OF 10 FEET.

OF THE CONTRACTOR WHEN NO LONGER NEEDED.

5. ANY TEMPORARY TRAFFIC CONTROL ITEMS, DEVICES, MATERIALS AND INCIDENTALS SHALL REMAIN THE PROPERTY

TRAFFIC ENGINEER.

4. THE CONTRACTOR SHALL SCHEDULE A REVIEW OF FINAL STRIPING PLANS PRIOR TO PLACEMENT WITH PROJECT

APPROVED BY THE ENGINEER BEFORE WORK CAN BE STARTED BY THE CONTRACTOR.

BEFORE TRAFFIC IS ALLOWED TO USE ANY LANE CLOSURES, CROSSOVERS OR DETOURS. ALL SIGNING SHALL BE

3. THE ENGINEER AND THE CONTRACTOR, OR THEIR AUTHORIZED REPRESENTATIVES, SHALL REVIEW THE SIGNING

IN THESE NOTES, THE PLANS, THE MUTCD OR THE ENGINEER.

NECESSARY FOR THE CONTROL AND PROTECTION OF VEHICULAR AND PEDESTRIAN TRAFFIC AS SPECIFIED

BARRICADES AND VERTICAL PANELS, PLASTIC DRUMS (STEEL DRUMS WILL NOT BE PERMITTED) AND CONES

B. ALL FLAGPERSONS AND TRAFFIC CONTROL DEVICES SUCH AS, BUT NOT LIMITED TO, FLASHERS, SIGNS

DEVICES AND MARKINGS.

A. ALL LABOR AND MATERIALS NECESSARY FOR CONSTRUCTION AND MAINTENANCE OF TRAFFIC CONTROL

AND CONTROL TRAFFIC" SHALL ALSO INCLUDE, BUT IS NOT LIMITED TO, THE FOLLOWING ITEMS AND OPERATIONS:

AND BRIDGE CONSTRUCTION UNLESS OTHERWISE PROVIDED FOR IN THESE NOTES. THE LUMP SUM BID TO "MAINTAIN

TO "MAINTAIN AND CONTROL TRAFFIC" AS SET FORTH IN THE CURRENT STANDARD SPECIFICATIONS FOR ROAD

2. All ITEMS OF WORK NECESSARY TO MAINTAIN AND CONTROL TRAFFIC WILL BE PAID AT THE LUMP SUM BID PRICE

SUPERVISOR AND DISTRICT TRAFFIC ENGINEER PRIOR TO ANY CONSTRUCTION.

DRAWINGS, CURRENT EDITIONS. THE TRAFFIC CONTROL PLAN SHALL BE REVIEWED AND APPROVED BY HAZARD SECTION

TRAFFIC CONTROL DEVICES, THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND THE STANDARD

THE PRE-CONSTRUCTION MEETING. TRAFFIC CONTROL PLAN SHALL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM

BE SUBMITTED TO HAZARD SECTION SUPERVISOR AND DISTRICT TRAFFIC ENGINEER AT LEAST TWO WEEKS PRIOR TO

1. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING A TRAFFIC CONTROL PLAN. THE TRAFFIC CONTROL PLAN SHALL

MOT SHEET 2 OF 2

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 44 of 101

REVISED: 5-26-14

Page 15: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

EROSION CONTROL NOTES

MATERIAL AT SITES APPROVED BY THE RESIDENT ENGINEER.

TRAPS AND SILT FENCES WHENEVER BECOME ONE - HALF FULL AND PROPERLY DISPOSE OF

THE CONTRACTOR SHALL BE REQUIRED TO CLEAN OUT (REMOVE SEDIMENT FROM) SILT

EXCAVATION OR DISTURBANCE WITHIN A DRAINAGE AREA.

EROSION CONTROL MEASURES SHALL BE IN PLACE AND FUNCTIONING PRIOR TO ANY

WHERE OVERLAND FLOW EXIST, A SILT FENCE OR OTHER FILTER DEVICES MAY BE USED.

DISCHARGING INTO A BLUE LINE STREAM OR ONTO AN ADJACENT PROPERTY OWNER.

SILT TRAP TYPE B SHALL ALWAYS BE PLACED AT THE COLLECTION POINT PRIOR TO

THE USE OF TEMPORARY MULCH IS ENCOURAGED.

- UP GRADIENT AREAS THAT HAVE BEEN PROTECTED BY SILT TRAPS (ACRES).

100 SQUARE FOOT PER LINEAR FOOT OF SILT FENCE.

AREAS PROTECTED BY SILT FENCE SHALL BE COMPUTED AT A MAXIMUM RATE OF

- UP GRADIENT AREAS THAT HAVE BEEN PROTECTED BY SILT FENCE (ACRES).

MULCH (ACRES).

CONTROL BLANKET OR OTHER GROUND PROTECTION MATERIAL SUCH AS TEMP.

- UP GRADIENT AREAS THAT HAVE BEEN RECLAIMED AND PROTECTED BY EROSION

- UP GRADIENT AREAS NOT DISTURBED (ACRES).

AT EACH SILT TRAP MAY BE REDUCED BY THE FOLLOWING AMOUNTS:

DETERMINED BY THE CONTRACTOR AND VERIFIED BY THE ENGINEER. THE REQUIRED VOLUME

ENGINEER. THE REQUIRED VOLUME CALCULATION FOR EACH SILT TRAP SHALL BE

CONTRIBUTING AREAS ARE DISTURBED OR ARE STABILIZED TO THE SATISFACTION OF THE

THE REQUIRED VOLUME AT EACH SILT TRAP SHALL BE COMPUTED AS UP GRADIENT

IN ORDER TO ACHIEVE THE BEST MANAGEMENT PLAN.

CONSTRUCTION. AS WORK PROCEEDS, SILT TRAPS/FENCES MAY BE ADDED OR REMOVED

COMPUTE THE VOLUME NECESSARY TO CONTROL SEDIMENT DURING EACH PHASE OF

DISTURBED GROUND DURING EACH PHASE OF CONSTRUCTION. THE CONTRACTOR SHALL

THE CONTRACTOR SHALL CONDUCT HIS OPERATION TO MINIMIZE THE AMOUNT OF

PER DISTURBED CONTRIBUTING ACRE.

ALL SILT CONTROL DEVICES SHALL BE SIZED TO RETAIN A VOLUME OF 3,600 CUBIC FEET

ITEM 10-0924.00

TURN LANES AT M.P. 5.45 TO 5.84

RICHMOND-IRVINE ROAD (KY 52)

ESTILL COUNTY

EROSION CONTROL NOTES

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 45 of 101

REVISED: 5-26-14

Page 16: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

WHAT UTILITY COMPANIES HAVE FACILITIES IN THE PROJECT AREA.

NECESSARY FOR THE CONTRACTOR TO CONTACT THE COUNTY COURT CLERK TO DETERMINE

ARE NOT REQUIRED TO BE MEMBERS OF THE B.U.D. ONE-CALL SYSTEM. IT MAY BE

THE CONTRACTOR SHOULD BE AWARE THAT THE OWNERS OF THE UNDERGROUND FACILITIES

THE CONTRACTOR IS ADVISED TO CONTACT THE B.U.D. ONE-CALL SYSTEM; HOWEVER,

ROAD CONTRACTORS OPERATIONS SHALL BE BORNE BY THE ROAD CONTRACTOR.

AND ANY OTHER ASSOCIATED COSTS FOR ANY DAMAGE TO UTILITIES CAUSED BY THE

UTILITIES BEFORE HE EXCAVATES IN THE AREA OF A UTILITY. THE COST FOR REPAIR

EXACT LOCATION AND ELEVATION OF UTILITIES BY HAND DIGGING TO EXPOSE

THE CABINET AND/OR UTILITY OWNER. THE ROAD CONTRACTOR SHALL DETERMINE THE

UTILITY OWNERS AND BY EXAMINING ANY SUPPLEMENTAL INFORMATION PROVIDED BY

RESPONSIBILITY TO LOCATE UTILITIES BEFORE EXCAVATING BY CALLING THE VARIOUS

IT WILL BE THE ROAD CONTRACTORS

LOCATE EXISTING UTILITIES

ITEM 10-0924.00

TURN LANES AT M.P. 5.45 TO 5.84

RICHMOND-IRVINE ROAD (KY 52)

ESTILL COUNTY

UTILITY NOTES / OWNERS

(859)357-6216

Gene Dunn

Lexington, Kentucky 40505-1408

Suite 170

130 West New Circle Road

Windstream Communications

Telephone

(859)623-1588

Senior Engineer

F. Taylor Lawson, P.E.

Richmond, Kentucky 40475

200 East Water Street

Kentucky Utilities

Electric

(606)643-5424

Dwight Richardson, Operation Manager

Irvine, Kentucky 40336

76 Cedar Grove Road

Estill County Water District No. 1

Water

Bryan K. Stone

(859)288-0215

Lexington, Kentucky 40512-4241

P.O. Box 14241

Columbia Gas of Kentucky, INC.

Gas

(606)723-4240

Jim Hayes

Irvine, Kentucky 40336

P.O. 186

251 Broadway

Irvine Community Telephone, INC.

Television

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 46 of 101

REVISED: 5-26-14

Page 17: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

ITEM 10-0924.00

TURN LANES AT M.P. 5.45 TO 5.84

RICHMOND-IRVINE ROAD (KY 52)

ESTILL COUNTY

STANDARD DRAWINGS

SILT TRAP BSEPIA 016

SHOULDER RUMBLE STRIPSSEPIA 011

CENTERLINE RUMBER STRIPSSEPIA 010

GUARDRAIL COMPONENTSSEPIA 008

DELIEANTORS FOR GUARDRAILSEPIA 002

SEPIA SHEETS:

SHOULDER CLOSURETTC-135-01

TEMPORARY PAVEMENT MARKER ARRANGEMENTS FOR CONSTRUCTION ZONESTPM-155-01

PAVEMENT MARKER ARRAGEMENT CHANNELIZED INTERSECTIONTPM-145-02

PAVEMENT MARKER ARRANGEMENTS TWO-LANE, TWO-WAY ROADWAYSTPM-115-02

SILT TRAP TYPE CRDX-101-04

GUARDRAIL POSTSRBR-016-04

GUARDRAIL POSTSRBR-015-04

GUARDRAIL TERMNAL SECTIONRBR-010-65

TYPICAL GUARDRAIL INSTALLATIONRBI-002-06

TYPICAL GUARDRAIL INSTALLATIONRBI-001-10

STANDARD DRAWINGS APPLICABLE TO PROJECT:

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112Page 47 of 101

REVISED: 5-26-14

Page 18: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

PROPOSAL BID ITEMS

Report Date 5/27/14Page 1 of 2

144112

Section: 0001 - ROADWAYLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRICEFP AMOUNT0010 00003 CRUSHED STONE BASE 1,198.00 TON $0020 00100 ASPHALT SEAL AGGREGATE 20.00 TON $0030 00103 ASPHALT SEAL COAT 2.80 TON $0040 00190 LEVELING & WEDGING PG64-22 150.00 TON $

0050 00212CL2 ASPH BASE 1.00D PG64-22REVISED: 5-27-14 2,331.00 TON $

0060 00301 CL2 ASPH SURF 0.38D PG64-22 661.00 TON $

0070 01987DELINEATOR FOR GUARDRAIL BIDIRECTIONAL WHITE 14.00 EACH $

0080 02159 TEMP DITCH 1,978.00 LF $0090 02230 EMBANKMENT IN PLACE 2,950.00 CUYD $0100 02351 GUARDRAIL-STEEL W BEAM-S FACE 687.50 LF $0110 02360 GUARDRAIL TERMINAL SECTION NO 1 1.00 EACH $0120 02381 REMOVE GUARDRAIL 687.50 LF $0130 02585 EDGE KEY 55.00 LF $0140 02650 MAINTAIN & CONTROL TRAFFIC 1.00 LS $0150 02671 PORTABLE CHANGEABLE MESSAGE SIGN 2.00 EACH $0160 02676 MOBILIZATION FOR MILL & TEXT 1.00 LS $

0170 02677ASPHALT PAVE MILLING & TEXTURINGREVISED: 5-27-14 840.00 TON $

0180 02696 SHOULDER RUMBLE STRIPS-SAWED 3,910.00 LF $0190 02701 TEMP SILT FENCE 1,995.00 LF $0200 02704 SILT TRAP TYPE B 2.00 EACH $0210 02705 SILT TRAP TYPE C 2.00 EACH $0220 02707 CLEAN SILT TRAP TYPE B 6.00 EACH $0230 02708 CLEAN SILT TRAP TYPE C 6.00 EACH $0240 02709 CLEAN TEMP SILT FENCE 1,995.00 LF $0250 02726 STAKING 1.00 LS $0260 02775 ARROW PANEL 2.00 EACH $0270 05952 TEMP MULCH 5,144.00 SQYD $0280 05953 TEMP SEEDING AND PROTECTION 5,938.00 SQYD $0290 05963 INITIAL FERTILIZER .15 TON $0300 05964 20-10-10 FERTILIZER .30 TON $0310 05985 SEEDING AND PROTECTION 5,144.00 SQYD $0320 05992 AGRICULTURAL LIMESTONE .40 TON $

0330 06427TRENCHINGREVISED: 5-27-14 4,000.00 LF $

0340 06510 PAVE STRIPING-TEMP PAINT-4 IN 13,379.00 LF $0350 06514 PAVE STRIPING-PERM PAINT-4 IN 10,204.00 LF $0360 06567 PAVE MARKING-THERMO STOP BAR-12IN 12.00 LF $0370 06569 PAVE MARKING-THERMO CROSS-HATCH 580.00 SQFT $0380 06574 PAVE MARKING-THERMO CURV ARROW 11.00 EACH $0390 06589 PAVEMENT MARKER TYPE V-MW 6.00 EACH $0400 06591 PAVEMENT MARKER TYPE V-BY 75.00 EACH $0410 20458ES403 CENTERLINE RUMBLE STRIPS 898.00 LF $

Section: 0002 - DEMOBILIZATION

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112 Page 100 of 101

REVISED: 5-26-14

Page 19: November 13, 1997transportation.ky.gov › Construction-Procurement › Proposals...DETAIL SHEET 2 OF 7 WEDGING LEVEL & MILL 2.75"+/- DEPTH EXISTING PAVEMENT EXISTING DGA BASE EXISTING

PROPOSAL BID ITEMS

Report Date 5/27/14Page 2 of 2

144112

LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRICEFP AMOUNT0420 02569 DEMOBILIZATION 1.00 LS $

ESTILL COUNTYHSIP 5262 (051)

Contract ID: 144112 Page 101 of 101