Page 1: NOTICE SUBMISSIONS Requirements and Procedures 1.

NOTICE SUBMISSIONS

Requirements and Procedures

1

Page 2: NOTICE SUBMISSIONS Requirements and Procedures 1.

PROJECTS COVERED

Part 12

Page 3: NOTICE SUBMISSIONS Requirements and Procedures 1.

Equipment Replacement

Medical and Non-Medical Used for similar purposes as

equipment being replaced“Substantially equivalent” technologyFDA-approved, if applicable.

3

Page 4: NOTICE SUBMISSIONS Requirements and Procedures 1.

Nonclinical Infrastructure

Including but not limited to HVAC, fire alarm and call bell systems, exterior building envelope, parking garages and elevators.

Others that do not relate to: Clinical space or service Renovation or reconfiguration of patient rooms Renovation or reconfiguration of resident rooms.

4

Page 5: NOTICE SUBMISSIONS Requirements and Procedures 1.

Non-Clinical Construction 5

Administrative OfficesUtility StructuresMaintenance ShopCentral KitchenCafeteria Gift ShopDedicated Worship SpaceHospital Lobbies

Page 6: NOTICE SUBMISSIONS Requirements and Procedures 1.

Clinical Impact 6

Limited Review (710.1(c)(5)) still required for projects that impact clinical space, such as Operating rooms Treatment and procedure rooms ICU’s Special care units (e. g., cardiac) Isolation rooms Laboratories

Page 7: NOTICE SUBMISSIONS Requirements and Procedures 1.

Clinical Impact

Limited Review (710.1(c)(5)) still required for projects to: Renovate or reconfigure patient rooms Renovate or reconfigure resident rooms. Notice required for painting, replacement

of floor coverings, etc., which are repair and maintenance

7

Page 8: NOTICE SUBMISSIONS Requirements and Procedures 1.

NOTICE SUBMISSION

PROCESS

Part 2

8

Page 9: NOTICE SUBMISSIONS Requirements and Procedures 1.

“Written” Notice

Electronic Submission via NYSE-CON

9

Page 10: NOTICE SUBMISSIONS Requirements and Procedures 1.

Notice Submission to NYSE-CON

Format Similar to Limited Review Application, but streamlined:Project DescriptionArchitecture/Engineering

Certification, where applicable.

10

Page 11: NOTICE SUBMISSIONS Requirements and Procedures 1.

Patient Safety Plan

Required for projects that implicate patient safety

Submission of plan document required

11

Page 12: NOTICE SUBMISSIONS Requirements and Procedures 1.

Timing and Acknowledgements

No timeframe for submission in advance of project

No formal approval will be issued by the Department for Notices

An acknowledgement will be generated by NYSE-CON when a notice is uploaded.

12

Page 13: NOTICE SUBMISSIONS Requirements and Procedures 1.

Compliance

Pre-opening and /or Post-opening inspections will be conducted selectively.

All projects must be fully compliant with applicable codes and regulations.

Full citation and correction of any violations.

13

Page 14: NOTICE SUBMISSIONS Requirements and Procedures 1.

Certification Documents

Initial Submission: Architect/Engineer Certification

Patient Safety Plan

Physicist Certification

14

Page 15: NOTICE SUBMISSIONS Requirements and Procedures 1.

Certification Documents15

Project Closeout

Architect/Engineer Certification

Installer’s Certification

Balancing Report