BUTTERFLY WALK DENMARK HILL CAMBERWELL CHURCH STREET CAMBERWELL NEW ROAD G BUS STOP SHELTER BUS STOP SHELTER G G G G BUS STOP SHELTER TIE INTO EXISTING ROAD MARKINGS. 0.0 4.2 11.9 4.6 7.7 14.5 17.5 26.2 33.7 3.0 3.4 2.2 3.1 3.2 3.0 5.7 3.1 3.4 3.0 3.3 2.2 3.1 3.1 3.0 3.3 1.9 3.1 3.0 2.8 3.6 3.8 USE EXISTING GULLY (SOUTH WESTERN CORNER) TO SET OUT NEW ROAD MARKINGS EXTENTS MEASURING ALONG THE KERBLINE. 15.0 31.2 BUS STOP Q TO BE RELOCATED PROPOSED LENGTH: 25M N 3.0 3.0 1.6 5.2 PROPOSED TfL DESIGN FOR DENMARK HILL JUNCTION WITH CAMBERWELL NEW ROAD. 5.7 LEGEND / NOTES. 160 TOOLEY STREET LONDON SE1P 5LX REV DATE REVISION DESCRIPTION / DETAILS DRN BY CHKD BY APRVD BY PROJECT: TITLE: CONTRACT NO: SCALE: DRAWING NO: DATE DRAWN: PURPOSE: DRAWN DESIGNED CHECKED APPROVED DATE ISSUED: REV: %$6(' 8321 7+( 25'1$1&( 6859(< 0$33,1* :,7+ 7+( 3(50,66,21 2) 7+( &21752//(5 2) +(5 0$-(67<6 67$7,21$5< 2)),&( &52:1 &23<5,*+7 81$87+25,6(' 5(352'8&7,21 $1' $1< &52:1 &23<5,*+7 ,1)5,1*(6 0$< /($' 72 3526(&87,21 25 &,9,/ 352&((',1*6 21 %(+$/) 2) /21'21 %2528*+ 2) 6287+:$5. /,&(1&( 12 ISO FULL BLEED A1 841 X 594 MM PRINTED ON ___% POST-CONSUMER RECYCLED CONTENT PAPER B APRIL 2017 MAY 2016 KC ABE HP HP 60343287-C0294-1200-01 FOR DISCUSSION 1:200 @ A1 60343287-C0294 SERIES 1200 ROAD MARKINGS & SIGNS SHEET 1 OF 6 CAMBERWELL TOWN CENTRE DENMARK HILL / ORPHEUS STREET DETAILED DESIGN \\UKCRD1FP001\UKCRD1FP001-V1TI\PROJECTS\TRAFFIC - SOUTHWARK HAPS 201415\06. LOT C PROFESSIONAL SERVICES\PROJECTS\C0294 DENMARK HILL JW ORPHEUS ST\50 CAD\60343287-C0294-S1200.DWG LEGEND / NOTES. 160 TOOLEY STREET LONDON SE1P 5LX REV DATE REVISION DESCRIPTION / DETAILS DRN BY CHKD BY APRVD BY PROJECT: TITLE: CONTRACT NO: SCALE: DRAWING NO: DATE DRAWN: PURPOSE: DRAWN DESIGNED CHECKED APPROVED DATE ISSUED: REV: PRINTED ON ___% POST-CONSUMER RECYCLED CONTENT PAPER FILE_NAME DRAFT Cut Line A Cut Line A NOTES 1. All dimensions are in metres unless otherwise stated. 2. The information shown on this drawing is based on a topographical survey provided by LB Southwark. 3. This drawing is to be read in conjunction with all Conway-AECOM drawings for job ref. C0294 as listed on the scheme document issue sheet. 4. Traffic management is to be in accordance with Chapter 8 of the Traffic Signs Manual and Safety at Street Works and Road Works. 5. Contractor to scan for services prior to excavation and refer to utility information. 6. Contractor to maintain access to all properties and businesses at all times. 7. All road markings and signs are to be installed in accordance with the DfT Traffic Signs Manual - Chapter 5: 2003. 8. All road markings and signs are to be in accordance with the Traffic Signs Regulations & General Directions (TSRGD) 2016. 9. All proportions and forms of letters, numerals and other characters are to be in accordance with Schedule 17 of the TSRGD 2016. 10. Single/double yellow and red lines to be offset a minimum of 250mm from kerb edge. 11. All street furniture except lighting columns should be set a minimum of 450mm from the kerb face. 12. Refer to SSDM/TDR drawing LBS /C/030, Detail E (Sheet 3 OF 3) for surface finishes around sign post bases. KEY SITE EXTENTS. NEW KERBS. NEW ROAD MARKINGS ROAD MARKINGS REFERENCE. FOR DETAILS REFER TO TABLE 1. EXISTING UTILITY COVERS. EXISTING GULLY. NEW KERB INLET GULLY. EXISTING LAMP COLUMN. NEW CYCLE RACKS. G AGB JE HP REVISED ROAD MARKINGS 03/04/2017 A AGB JE HP 24/05/2017 B REVISED ROAD MARKINGS & ADDED SB BUS LANE. APPENDIX E
3
Embed
NOTES APPENDIX E N CAMBERWELL CHURCH STREETmoderngov.southwark.gov.uk/documents/s68792... · camberwell church street camberwell new road g bus stop ... iso full bleed a1 841 x 594
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.