This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
▪ Lot/DP: LOT 29
DIESEL DRIVE PAGET QLD
▪ Status: DA
▪ Issue Date: 6/08/2012
▪ Contents:
Strength
▪ Location:
Client:
IMS QLD
Project:PROPOSED WORKSHOP & OFFICE
DESIGN & CONSTRUCTION OF INDUSTRIAL & COMMERCIAL BUILDINGS
SHEET
A-01
A-02
A-03
A-04
A-05
A-06
COVER SHEET
SITE ANALYSIS PLAN
SITE PLAN
SOIL EROSION & SEDIMENT CONTROL PLAN
MANOEUVRING PLAN
WORKSHOP FLOOR PLAN
OFFICE PLANS
SHEETA-07
A-08
A-09
A-10
A-11
A-12
A-13
ELEVATIONS
ELEVATIONS
SECTION
SECTION
DETAILS
DOOR SCHEDULE
WINDOW & DOOR SCHEDULE
NOTE COLOURS ARECONCEPTUAL ONLY
megana
Received (Auto Date)
Project: PROPOSED WORKSHOP & OFFICE
1360
Status:
Project No:
Client
Drawn By: Issue Date: Scale:
Drawing Title: Revision No:
Sheet:
Design & Construction of Industrial & Commercial BuildingsPhone: 02 4961 6822 Fax: 02 4961 4343
DISABLED PARKING PLANINACCORDANCE W/ FIGURE 2.2 EXAMPLE OF AN ANGLED PARKING
SPACE WITH SHARED AREA ON ONE SIDE ONLY - AUSTRALIANDIMENSIONS ONLY
PARK
ING
AISL
E
CL
CL
CLCL
CL
SHARED AREA (NOTMARKED)
BOLLARD AS PERAS/NZS 2890.6:2009
DISABLED SIGNAGE ASPER AS/NZS 2890.6:2009
DEDICATED CARPARKING SPACEAS PER AS/NZS 2890.6:2009
SHARED AREA AS PERAS/NZS 2890.6:2009
LINE MARKINGS
150mm THICK CONCRETE DRIVEWAYSLAB TO ENGINEERS SPEC.
1,300
1,300
700
1,200
700
DISABLED PARKING SIGNAGEINACCORDANCE W/ FIGURE 3.1 USE OF SYMBOL OF ACCESS TO
IDENTIFY SPACES
MAXMIN
MA
X
PARK
ING
AISL
E
CL
CLCL
CLCL
500 1,200
SHARED AREA AS PERAS/NZS 2890.6:2009
DISABLED SIGNAGE AS PER AS1428.1 (BETWEEN 800mm -1000mm HIGH)
WHITE SYMBOL OF ACCESS PLACEDON BLUE RECTANGLE
LINE MARKING TO BE UNBROKENLINE 80 TO 100mm WIDE
SHARED AREA TO BE MARKED W/ DIAGONAL STRIPES150 TO 200mm WIDE W/ SPACES 200mm TO 300mmBETWEEN STRIPES. STRIPES TO BE AT AN ANGLE OF45+/- 10DEGREES TO THE SIDE OF THE SPACE
NO SHARED AREA MARKINGS SHALL BE PLACEDIN TRAFFICABLE AREAS
900
1,000
850mm MIN CLEAROPENING (920 LEAF)AS PER AS1428.1:2009
EGRESS & DISABLED DOORSIN ACCORDANCE CLAUSE 13 AS 1428.1:2009
D-TYPE LEVER HANDLE (OPENABLEWITHOUT A KEY FROM SIDE FACING
PERSON SEEKING EGRESS)
HANDLE LOCATEDBETWEEN 900-1000mm FFL
900
1,000
900
1,000
850mm MIN CLEAROPENING (920 LEAF)AS PER AS1428.1:2009
DOOR SEALS TO ALL DOORSIN BUILDING ENVELOPE SELF CLOSING DOOR
TO MAIN ENTRY
CONTRAST LINE TO BE LOCATEDBETWEEN 900-1000mm FFL
GLAZING CONTRAST LINE
MAIN ENTRY DOOR & GLAZINGIN ACCORDANCE AS 1428.1:2009
D-TYPE LEVER HANDLE (OPENABLEWITHOUT A KEY FROM SIDE FACINGPERSON SEEKING EGRESS)
HANDLE LOCATEDBETWEEN 900-1000mm FFL
1:100PP-01 PP-01 DISABLED PARKING PLANA-02
1:100PP-01 PP-01 DISABLED PARKING SIGNAGEA-02
1:50DD1 DD1 EGRESS DOOR DETAILA-09
1:50DD2 DD2 LUMINANCE CONTRASTA-07
DA ISSUE 03.08.12DPFMEDAA
Project: PROPOSED WORKSHOP & OFFICE
1360
Status:
Project No:
Client
Drawn By: Issue Date: Scale:
Drawing Title: Revision No:
Sheet:
Design & Construction of Industrial & Commercial BuildingsPhone: 02 4961 6822 Fax: 02 4961 4343
UNLESS SPECIFIED ELSEWHERE ON THEPLANS IT SHOULD BE ASSUMED THAT THE
FRL OF ANY BUILDING ELEMENT IS -/-/-.WHERE A BUILDING ELEMENT (E.G. WALL,
COLUMN, BEAM, TRUSS, FLOOR, OR ROOF)REQUIRES AN FRL TO COMPLY WITH THEDEEMED TO SATISFY PROVISION OF THEBCA IT WILL BE CLEARLY NOMINATED ON
THE PLANS.
PROVIDE REVERSE CYCLE AIRCONDITIONING TO THE FOLLOWING AREAS.THIS WOULD BE DESIGNED FOR ANAVERAGE TEMPERATURE OF 22°C (PLUS ORMINUS 2°C) AT A MEDIAN OUTSIDETEMPERATURE OF 35°C WITH SEPARATE24hr OPERATION SPLIT SYSTEM TO COMMSROOM
-RECEPTION AREA -OFFICE'S & OPEN OFFICE-BOARDROOM-LUNCH ROOMS
Project: PROPOSED WORKSHOP & OFFICE
1360
Status:
Project No:
Client
Drawn By: Issue Date: Scale:
Drawing Title: Revision No:
Sheet:
Design & Construction of Industrial & Commercial BuildingsPhone: 02 4961 6822 Fax: 02 4961 4343
UNLESS SPECIFIED ELSEWHERE ON THEPLANS IT SHOULD BE ASSUMED THAT THE
FRL OF ANY BUILDING ELEMENT IS -/-/-.WHERE A BUILDING ELEMENT (E.G. WALL,
COLUMN, BEAM, TRUSS, FLOOR, OR ROOF)REQUIRES AN FRL TO COMPLY WITH THEDEEMED TO SATISFY PROVISION OF THEBCA IT WILL BE CLEARLY NOMINATED ON
THE PLANS.PROVIDE REVERSE CYCLE AIRCONDITIONING TO THE FOLLOWING AREAS.THIS WOULD BE DESIGNED FOR ANAVERAGE TEMPERATURE OF 22°C (PLUS ORMINUS 2°C) AT A MEDIAN OUTSIDETEMPERATURE OF 35°C WITH SEPARATE24hr OPERATION SPLIT SYSTEM TO COMMSROOM
-RECEPTION AREA -OFFICE'S & OPEN OFFICE-BOARDROOM-LUNCH ROOMS
Project: PROPOSED WORKSHOP & OFFICE
1360
Status:
Project No:
Client
Drawn By: Issue Date: Scale:
Drawing Title: Revision No:
Sheet:
Design & Construction of Industrial & Commercial BuildingsPhone: 02 4961 6822 Fax: 02 4961 4343
UNLESS SPECIFIED ELSEWHERE ON THEPLANS IT SHOULD BE ASSUMED THAT THE
FRL OF ANY BUILDING ELEMENT IS -/-/-.WHERE A BUILDING ELEMENT (E.G. WALL,
COLUMN, BEAM, TRUSS, FLOOR, OR ROOF)REQUIRES AN FRL TO COMPLY WITH THEDEEMED TO SATISFY PROVISION OF THEBCA IT WILL BE CLEARLY NOMINATED ON
THE PLANS.
PROVIDE REVERSE CYCLE AIRCONDITIONING TO THE FOLLOWING AREAS.THIS WOULD BE DESIGNED FOR ANAVERAGE TEMPERATURE OF 22°C (PLUS ORMINUS 2°C) AT A MEDIAN OUTSIDETEMPERATURE OF 35°C WITH SEPARATE24hr OPERATION SPLIT SYSTEM TO COMMSROOM
-RECEPTION AREA -OFFICE'S & OPEN OFFICE-BOARDROOM-LUNCH ROOMS
Project: PROPOSED WORKSHOP & OFFICE
1360
Status:
Project No:
Client
Drawn By: Issue Date: Scale:
Drawing Title: Revision No:
Sheet:
Design & Construction of Industrial & Commercial BuildingsPhone: 02 4961 6822 Fax: 02 4961 4343
UNLESS SPECIFIED ELSEWHERE ON THEPLANS IT SHOULD BE ASSUMED THAT THE
FRL OF ANY BUILDING ELEMENT IS -/-/-.WHERE A BUILDING ELEMENT (E.G. WALL,
COLUMN, BEAM, TRUSS, FLOOR, OR ROOF)REQUIRES AN FRL TO COMPLY WITH THEDEEMED TO SATISFY PROVISION OF THEBCA IT WILL BE CLEARLY NOMINATED ON
THE PLANS.
PROVIDE REVERSE CYCLE AIRCONDITIONING TO THE FOLLOWING AREAS.THIS WOULD BE DESIGNED FOR ANAVERAGE TEMPERATURE OF 22°C (PLUS ORMINUS 2°C) AT A MEDIAN OUTSIDETEMPERATURE OF 35°C WITH SEPARATE24hr OPERATION SPLIT SYSTEM TO COMMSROOM
-RECEPTION AREA -OFFICE'S & OPEN OFFICE-BOARDROOM-LUNCH ROOMS
Project: PROPOSED WORKSHOP & OFFICE
1360
Status:
Project No:
Client
Drawn By: Issue Date: Scale:
Drawing Title: Revision No:
Sheet:
Design & Construction of Industrial & Commercial BuildingsPhone: 02 4961 6822 Fax: 02 4961 4343
UNLESS SPECIFIED ELSEWHERE ON THEPLANS IT SHOULD BE ASSUMED THAT THE
FRL OF ANY BUILDING ELEMENT IS -/-/-.WHERE A BUILDING ELEMENT (E.G. WALL,
COLUMN, BEAM, TRUSS, FLOOR, OR ROOF)REQUIRES AN FRL TO COMPLY WITH THEDEEMED TO SATISFY PROVISION OF THEBCA IT WILL BE CLEARLY NOMINATED ON
THE PLANS.
PROVIDE REVERSE CYCLE AIRCONDITIONING TO THE FOLLOWING AREAS.THIS WOULD BE DESIGNED FOR ANAVERAGE TEMPERATURE OF 22°C (PLUS ORMINUS 2°C) AT A MEDIAN OUTSIDETEMPERATURE OF 35°C WITH SEPARATE24hr OPERATION SPLIT SYSTEM TO COMMSROOM
-RECEPTION AREA -OFFICE'S & OPEN OFFICE-BOARDROOM-LUNCH ROOMS
Project: PROPOSED WORKSHOP & OFFICE
1360
Status:
Project No:
Client
Drawn By: Issue Date: Scale:
Drawing Title: Revision No:
Sheet:
Design & Construction of Industrial & Commercial BuildingsPhone: 02 4961 6822 Fax: 02 4961 4343
UNLESS SPECIFIED ELSEWHERE ON THEPLANS IT SHOULD BE ASSUMED THAT THE
FRL OF ANY BUILDING ELEMENT IS -/-/-.WHERE A BUILDING ELEMENT (E.G. WALL,
COLUMN, BEAM, TRUSS, FLOOR, OR ROOF)REQUIRES AN FRL TO COMPLY WITH THEDEEMED TO SATISFY PROVISION OF THEBCA IT WILL BE CLEARLY NOMINATED ON
THE PLANS.
PROVIDE REVERSE CYCLE AIR CONDITIONING TO THEFOLLOWING AREAS. THIS WOULD BE DESIGNED FOR ANAVERAGE TEMPERATURE OF 22°C (PLUS OR MINUS 2°C)AT A MEDIAN OUTSIDE TEMPERATURE OF 35°C WITHSEPARATE 24hr OPERATION SPLIT SYSTEM TO COMMSROOM
-RECEPTION AREA -OFFICE'S & OPEN OFFICE-BOARDROOM-LUNCH ROOMS
Project: PROPOSED WORKSHOP & OFFICE
1360
Status:
Project No:
Client
Drawn By: Issue Date: Scale:
Drawing Title: Revision No:
Sheet:
Design & Construction of Industrial & Commercial BuildingsPhone: 02 4961 6822 Fax: 02 4961 4343
SOIL EROSION - SEDIMENTATION CONTROL NOTES:1. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSPECTED AND MAINTAINED EVERY DAY THAT THERE IS ACTIVITY ON SITE AND AFTER ANY RAINFALL EVENT.2. CONSTRUCTION MATERIALS AND SEDIMENT MUST NOT BE DEPOSITED ON ADJOINING LAND OR ROADWAYS.3. WORKS ARE TO BE CONTROLLED TO MINIMISE SITE DISTURBANCE.4. ALL DISTURBED AREAS ARE TO BE PROGRESSIVELY STABILISED AT THE COMPLETION OF EACH STAGE.5. SITE ACCESS TO BE OVERSIZED GRAVEL.6. DRAINAGE IS TO BE CONNECTED TO STORMWATER SYSTEM IMMEDIATELY ON COMPLETION OF WORKS.7. CONSTRUCTION SITE STABILIZATION TO BE FINALIZED IMMEDIATELY ON COMPLETION OF WORKS.
1,00
0 S
/L1,
000
S/L
BUILDING WASTE ENCLOSURE1800x1800x1200H STAR PICKETPOSTS & WEED MAT SIDES
MATERIAL STOCK PILE
OVERSIZE GRAVEL ACCESS TOSITE DURING CONSTRUCTION
SITE OFFICE & AMENITIES
TRUCK UNLOADING POSITION
STOCKPILE FOR EXCAVATED MATERIAL
STOCKPILE FORIMPORTED MATERIAL
SILT FENCE
OVERSIZE GRAVEL ACCESS TOSITE DURING CONSTRUCTION
SILT FENCE
SILT FENCE
2.1.
GROUND OR 250mm INTO ROCKCAPS DRIVEN 600mm INTO
STAR PICKETS WITH SAFETY
DIRECTIONOF FLOW
TO NATURAL SURFACE.FURROWS TO BOND BANK
CHANNEL AND BANK TO BE REVEGETATED AFTER CONSTRUCTION NOT TO SCALE
CHANNEL STABILISATIONAS REQUIRED
DIVERSION BANK & CHANNEL
GROUND OR 250mm INTO ROCKCAPS DRIVEN 600mm INTO
STAR PICKETS WITH SAFETY
3 METRES MAX.
SPECIFIED OTHERWISEWOVEN GEOFABRIC UNLESS
AREAUNDISTURBED
SEDIMENT FENCE DETAIL
CHANNEL STABILISATIONAS REQUIRED
DETAIL OFOVERLAP
AREADISTURBED
OF FLOW
DIRECTION
OPTIONAL FRAMEWORK(WIRE OR STEEL MESH)
GEOFABRIC EMBEDDED200mm INTO GROUND
OR ROCK
200m
m50
0-70
0mm
MA
X.
EXISTING BITUMEN
KERB INLET PIT
TURFED EDGING EXISTINGTO BE MAINTAINED
KERB GROYNEMIN. 900 LONG
EXISTING KERB& GUTTER
KERB GROYNE DETAIL
1:500
SOIL EROSION & SEDIMENT CONTROL
DA ISSUE 03.08.12DPFMEDAA
Project: PROPOSED WORKSHOP & OFFICE
1360
Status:
Project No:
Client
Drawn By: Issue Date: Scale:
Drawing Title: Revision No:
Sheet:
Design & Construction of Industrial & Commercial BuildingsPhone: 02 4961 6822 Fax: 02 4961 4343