C-C-01 NE 51st Street 148th Avenue NE Microsoft Redwest Road (Private) C-C-03 C-C-04 C-C-06 C-C-05 C-C-02 (NOT SHOWN) 150th Avenue NE ARTIFICIAL TURF PLAYFIELD (1.59 AC = 69,260 SF) EQUIVALENT PERMEABLE PAVEMENT SIDEWALK C-C-07 State Route 520 Off Ramp SAND VOLLEYBALL COURT (0.09 AC = 3,811 SF) ADA RAMP WITH HANDRAILS 20' ASPHALT ACCESS ROAD EXISTING GRAVEL ACCESS ROAD TO REMAIN EXISTING WETLAND D (CATEGORY IV) EXISTING WETLAND F (CATEGORY IV) EXISTING WETLAND B (CATEGORY III) EXISTING WETLAND K (CATEGORY IV) EXISTING ASPHALT PARKING LOT TO REMAIN EXISTING DETENTION AND WATER QUALITY POND EXISTING WETLAND J (CATEGORY III) ASPHALT BASKETBALL COURT (0.11 AC = 4,661 SF) ARTIFICIAL TURF PLAYFIELD (2.86 AC = 124,582 SF) REGRADE AND RESTORE GRAVEL ACCESS ROAD 148th Ave NE & NE 51st St Redmond, WA 98052 RED WEST SOUTH FIELDS MIKE BEHN 33708 S T A T E O F W A S H I N G T O N R E G I S T E R E D P R O F E S S I O N A L E N G I N E E R C O R B . B Y H T O M I T Y A W K Sheet Title/Number Senior Project Manager Development Manager Project Manager Quality Control Reviewer Quality Control FF&E No. Date Revisions Description M.S. Project No. CPL Project No. Microsoft Mechanical Engineer Microsoft Cable Engineeer Microsoft Electrical Engineer Engineering Manager Security Manager Project Planner Project Manager FF&E CUSTOMER Checked Date Design Drawn Key Plan Registration Date Date Date 02/12/2019 BSB Approvals OPERATIONS PROJECT MANAGEMENT Design Team P18BSB-001 JRT BSB O U O U N R G D T H E E L E R I N N C L P 801 SECOND AVENUE, SUITE 900 (206) 343-0460 SEATTLE, WA 98104 www.cplinc.com THIS DEVELOPMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF REDMOND STANDARD SPECIFICATIONS AND DETAILS, CURRENT EDITION. This approval is for the design concept only. These plans appear to be in conformance with the City Of Redmond design standards for construction. This approval shall not be construed as authorizing construction not in accordance with applicable City standards. The City reserves the right to require revisions to the approved plans to assure conformance with City of Redmond design standards for construction at any time that it is discovered that the proposed construction does not otherwise meet the applicable construction standards. The owner is required to provide designs and plans in accordance with applicable City standards and assures that construction is accomplished in accordance with those standards. The owner and/or design engineer and/or developer may be required to make necessary approved field revisions to correct any errors or omissions found on the approved plan. APPROVED FOR CONSTRUCTION FOR: Director of Public Works City of Redmond Date: Plan Check Engineer: Planning: Trans / Engr: Fire: Utility: Storm: Section 14, Township 25 N, Range 5 E, W.M. 02/12/2019 PREP REVISION 01 Transportation Plan Overall C-C-00