SLOPED STEEL EPDM R OO F ON SL OPED STE EL 1 /4": 12 " TYPIC AL ALUM. FASCIA MATCH LINE 'B' MATCH LINE 'A' EXISTING ROOF TO REMAIN ROOF DRAIN WITH INTEGRAL OVERFLOW, TYP. MATCH LINE 'B' MATCH LINE 'A' NEW CANOPY 1" / 1' - 0" EXTENT OF EXISTING ROOF EPDM RO O F O N SLOPED STEEL 1 /4" :12 " TYPIC AL EPDM ROOF ON SLOPED STEEL 1/4":12" TYPICAL EPDM ROOF ON SLOPED STEEL 1/4":12" TYPICAL EPDM ROOF ON SLOPED STEEL 1/4":12" TYPICAL EPDM ROOF ON SLOPED STEEL 1":12" TYPICAL TAPERED INSULATION TAPERED INSULATION EPDM ROOF ON SLOPED STEEL TAPERED INSUALTION EPDM ROOF ON SLOPED STEEL 1":12" TYPICAL PRE - FABRICATED LOUVERED ALUM. SUNSHADE PRE - FABRICATED LOUVERED ALUM. SUNSHADE TAPERED INSULATION ALUM. EDGE TRIM AND GUTTER TYPICAL ALUM. FASCIA ALUM. EDGE TRIM AND GUTTER TYPICAL ALUM. FASCIA ALUM. FASCIA ALUM. EDGE TYPICAL ALUM. EDGE TRIM WITH GUTTER TYPICAL ALUM. FASCIA ALUM. EDGE TYPICAL 4' HIGH LOUVERED METAL ROOF SCREEN TOP OF NEW PARAPET FLUSH TO ADJACENT EXISTING ROOF DEMO PORTION OF EXISTING ROOF 1 A1.10 1 A1.10 DS ROOF HATCH TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS 76'-6" 23'-0" PRE - FABRICATED ALUM. SUNSHADE 2' - 6" 72' - 0" 18' - 0" INFILL AND RE - ROOF EXISTING CURB 7 A1.10 Sim N 195 Scott Swamp Road Farmington, CT 06032 qamarch.com Issue Dates: Project #: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY A B C:\Revit Local\ROCKY HILL_CD_roccopetitto.rvt 4/21/2020 11:59:41 AM A1.3 ROOF PLAN CONSTRUCTION DOCUMENT SET MARCH 23, 2020 1934 Rocky Hill Senior Community Center NEW BUILDING FOR: ROCKY HILL, CT 1/16" = 1'-0" A1.3 1 ROOF PLAN Revisions ADDENDA 4 APRIL 21, 2020
33
Embed
NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020 · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
SLOPED STEEL
EPDM ROOF ON SLOPED STEEL
1/4":12" TYPICAL
EXISTING ROOF TO REMAIN
ALUM. FASCIA
MATCH LINE 'B'MATCH LINE 'A'
EXTENT OF EXISTING ROOF
EXISTING ROOF TO REMAIN
ROOF DRAIN WITH INTEGRAL OVERFLOW, TYP.
MATCH LINE 'B'MATCH LINE 'A'
NEW CANOPY
1" / 1'-0"
EXTENT OF EXISTING ROOF EPDM ROOF ON SLOPED STEEL
1/4":12" TYPICAL
EPDM ROOF ON
SLOPED STEEL
1/4":12" TYPICAL
EPDM ROOF ON SLOPED STEEL1/4":12" TYPICAL
EPD
M R
OO
F O
N
SLO
PED
STE
EL1/
4":1
2" T
YPIC
AL
EPDM ROOF ON
SLOPED STEEL
1":12" TYPICAL
TAPE
RED
INSU
LATI
ON
TAPE
RED
IN
SULA
TIO
N
EPD
M R
OO
F O
N
SLO
PED
STE
ELTA
PER
ED
INSU
ALTI
ON
EPD
M R
OO
F O
N
SLO
PED
STE
EL1"
:12"
TYP
ICAL
PRE-FABRICATED LOUVERED ALUM. SUNSHADE
PRE- FABRICATED LOUVERED ALUM. SUNSHADE
TAPERED INSULATION
ALUM. EDGE TRIM AND GUTTER TYPICAL
ALUM. FASCIA
ALUM. EDGE TRIM AND GUTTER TYPICAL
ALUM. FASCIA
ALUM. FASCIA
ALUM. EDGE TYPICAL
ALUM. EDGE TRIM WITH GUTTER TYPICAL
ALUM. FASCIA
ALUM. EDGE TYPICAL
4' HIGH LOUVERED METAL ROOF SCREEN
TOP OF NEW PARAPET FLUSH TO ADJACENT EXISTING ROOF
DEMO PORTION OF EXISTING ROOF
1
A1.10
1
A1.10
DS
ROOF HATCH
TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS
TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS
TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS
76'-6"
23'-0
"
PRE-FABRICATED ALUM. SUNSHADE
2' -
6"
72' - 0"
18' -
0"
INFILL AND RE-ROOF EXISTING CURB
7A1.10
Sim
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_r
occo
petit
to.rv
t4/
21/2
020
11:5
9:41
AM
A1.3
ROOF PLAN
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1/16" = 1'-0"A1.31 ROOF PLAN
Revisions
ADDENDA 4 APRIL 21, 2020
SLOPED STEEL
EPDM ROOF ON SLOPED STEEL
1/4":12" TYPICAL
ALUM. FASCIA
ROOF DRAIN WITH INTEGRAL OVERFLOW, TYP.
MATCH LINE 'B'MATCH LINE 'A'
1" / 1'-0"
EPDM ROOF ON SLOPED STEEL
1/4":12" TYPICAL
EPDM ROOF ON SLOPED
STEEL
1/4":12" TYPICAL
EPDM ROOF ON SLOPED STEEL1/4":12" TYPICAL
EPD
M R
OO
F O
N S
LOPE
D S
TEEL
1/4"
:12"
TYP
ICAL
EPDM ROOF ON SLOPED STEEL
1":12" TYPICAL
TAPE
RED
INSU
LATI
ON
TAPE
RED
INSU
LATI
ON
PRE- FABRICATED LOUVERED ALUM. SUNSHADE
ALUM. EDGE TRIM AND GUTTER TYPICAL
ALUM. FASCIA
ALUM. EDGE TRIM AND GUTTER TYPICAL
ALUM. FASCIA
4' HIGH LOUVERED METAL ROOF SCREEN
1
A1.10
1
A1.10
DS
ROOF HATCH
TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS
76'-6"
23'-0
"
18' -
0"
TAPERED INSULATION
4A1.10
Sim
1
A1.10
EPDM ROOF ON SLOPED STEEL
1/4":12" TYPICAL
ROOF DRAIN WITH INTEGRAL
OVERFLOW, TYP.
MATCH LINE 'B'MATCH LINE 'A'
EPDM ROOF ON SLOPED STEEL
1/4":12" TYPICAL
TAPE
RED
INSU
LATI
ON
ALUM. EDGE TYPICAL
ALUM. COPING
ALUM. COPING
EPDM ROOF ON SLOPED STEEL
1":12" TYPICAL
ALUM. COPING
1
A1.10
1
A1.10
TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_r
occo
petit
to.rv
t4/
21/2
020
11:0
4:41
AM
A1.3B
ROOF PLAN-PART B
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1/8" = 1'-0"A1.3B1 ROOF PLAN-PART B
Revisions
ADDENDA 4 APRIL 21, 2020
1/8" = 1'-0"A1.3B2 ROOF PLAN ADD ALT
HVAC EQUIPMENT,SEE MEP DWGS.
PREFABRICATED VIBRATION ISOLATION EQUIPMENT CURB, SPACE & SIZE PER EQUIPMENT SPECIFICATIONS, SEE MEP DWGS.
RUN ROOF MEMBRANE UP & OVER CURB, TYP.
8" M
IN.
RIGID INSULATION
COVERBOARD
ROOF MEMBRANE
CLOSED CELL INSULATION
EPDM WALK PADS. REFER TO SPECS
ROOF STRUCTURE, REFER TO STRUCTURAL DRAWINGS
RIGID INSULATION
FULLY ADHERED ROOF MEMBRANE FULLY ADHERED ROOF
MEMBRANE
MIN.2"
COVERBOARD
CLOSED CELL INSULATION
ROOF SHEATHING
BI-FUNCTIONAL ROOF DRAIN
EPDM ROOF ASSEMBLY ANDMEMBRANE FLASHING TO
EXTEND UNDER CLAMPING RINGMEMBRANE FLASHING
FULLY ADHERED EPDM ROOFING SYSTEM
TOP OF DECK
RIGID INSULATION
5/8" COVERBOARD, TYP.
TAPERED FIBER CANT SET IN MASTIC
INSULATE BOWL AND DRAIN
4" 4" 2' - 0"6" 1' - 0" 6"
8" 8"
ROOF DRAIN PIPE-REFER TO PLUMBING DRAWINGS
STRAINER BASKET
ROOF SHEATHING
CLOSED CELL INSULATION
4" M
IN.
4"
24" PLUMBING VENT STACK
PIPE PENETRATION
FLASHING HOT AIR WELD
BASE FLASHING, HOT AIR WELD
MEMBRANE
SEALANT
TOP OF FLASHING
1/2" GALVANIZED WIRE SCREEN
ROOF STRUCTURE-REFER TO STRUCTURAL DRAWINGS
ROOF SHEATHING
RIGID INSULATION
COVERBOARD
CLOSED CELL INSULATION
PRE-FABRICATED INSULATED METAL CURB
FIRE RETARDANT WOOD BLOCKING STRUCTURE @ NEW DECK OPENING BOLTED THROUGH TRUSSES
CONTINUOUS BEAD OF SEALANT
GROMMETED FASTENERS @ 12" O.C
METAL FLASHING WITH CLEATS @ 24" O.C
8" RUSS AT BASE OF CURB
FLASHING STRIP, HOT AIR STRIP
FULLY ADHERED EPDM ROOF MEMBRANE, SEE SPECS
RIGID INSULATION
WEATHER BARRIER @ ROOF. SEE SPECS FOR REQUIREMENTS
ROOF SHEATHING
CONDENSING UNIT PENETRATION
ISOLATION APPARATUS PER MECHANICAL DRAWINGS
CLOSED CELL INSULATION
COVERBOARD
INSULATED COVER
ROOF SCUTTLE
SAFETY POLE
GALV. 1-1/4" PIPE RAILING
CURB W/ INTEGRAL CAP FLASHING & POSIFLASH
PREFAB INSULATEDCURB
RIGID INSULATION
ANCHOR POST TO DECK TYP.
ROOF HATCH ASSEMBLY. INSTALL PER
MANUFACTURERS REQUIREMENTS.
FULLY ADHERED EPDM ROOFING SYSTEM
2X6 BLOCKING TO ACCOMMODATE INSULATION HEIGHT
CANT STRIP
ATTACH TO WALL USING MFG. RECOMMENDED CONNECTIONS
LADDER
COVERBOARDROOF MEMBRANE
MIN. 2X8 IN WALLS SOLID BLOCKING @ ALL ANCHOR LOCATIONS
S.S. RING CLAMPS, TYP.
ROOF STRUCTURE, SEE STRUC. DWGS
EXISTING CURB
CONTINUOUS BEAD OF SEALANT
GROMMETED FASTENERS @ 12" O.C
NEW METAL FLASHING WITH CLEATS
FLASHING STRIP, HOT AIR STRIP
EXISTING EPDM ROOF MEMBRANE
NEW RIGID INSULATION R-38 MIN
NEW ADHERED EPDM ROOF MEMBRANE
FULLY ADHERED MEMBRANE FLASHING
NEW 3/4" ROOF DECKING
NEW VAPOR BARRIER
INFILL CURB AREA W/MIN 8" CFMF 12" O.C.
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_r
occo
petit
to.rv
t4/
21/2
020
11:5
0:17
AM
A1.10
ROOF DETAILS
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1 1/2" = 1'-0"A1.106 EQUIPMENT CURB
3/4" = 1'-0"A1.105 EPDM WALK PAD DETAIL
1 1/2" = 1'-0"A1.101 ROOF DRAIN
1 1/2" = 1'-0"A1.102 PLUMBING VENT DETAIL
1 1/2" = 1'-0"A1.103 ISOLATION CURB @ AC UNITS DETAIL
Revisions
ADDENDA 4 APRIL 21, 2020
1 1/2" = 1'-0"A1.104 ROOF HATCH DETAIL
1 1/2" = 1'-0"A1.107 CURB INFILL
FIRST FLOOR0"
12
CLERESTORY14' - 4"
BULLNOSE3' - 8"
EXTERIORINTERIOR
A5.14
Sim
BULLNOSE BRICK COLOR "B"
LOWER FACE 4" BRICK VENEER COLOR 'B'
SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY
4" BRICK VENEER COLOR "B"
EXPOSED STRUCTURAL STEEL TO BE COATED WITH HIGH PERFORMANCE
THERMAL RESISTIVE PAINT AT ALL THERMAL TRANSITIONS TYPICAL
4 1/2" ALUMINUM STOREFRONT CLERESTORY
RADIANT PANEL, SEE MEP
NOTE: SEE STRUCTURAL DRAWINGS FOR FOUNDATION AND UNDERSLAB DRAIN LOCATIONS
8'-3"
HSS BEAM, SEE STRUCTURAL DRAWINGS ENCAPSULATE W/ CLOSED CELL SPRAY INSULATION, WRAP W/ ALUMINUM BRAKE METAL
GYPSUM SHEATHING W INTEGRAL MOISTURE BARRIER. FLASH ALL SEAMS. PROVIDE ALL REQUIRED BLOCKING.
WOOD LOOK METAL SOFFIT
PT BLOCKING AT ROOF EDGE1/2" COVER BOARD
TAPERED POLYISOCYANURATE INSULATION
PREFINISHED ALUMINUM GUTTER
FULLY ADHERED EPDM ROOFING MEMBRANE
METAL DECKING, SEE STRUCTURAL DRAWINGS
ALUMINUM DRIP EDGE
ALUMINUM FASCIA AND DRIP EDGE
CONTINUOUS MOISTURE BARRIER
STEEL OUTRIGGERS W/ SOLID BLOCKING ALONG BOTTOM. FILL ENTIRE VOID W/ CLOSED CELL SPRAY INSULATION
LAP MOISTURE BARRIER AROUND SOFFIT FRAMING, INTEGRATE W/ ROOF AND CLOSED CELL
INSULATED METAL PANEL
STEEL CHANNEL AND BLOCKING, SEE STRUCTURAL DRAWINGS
HSS TUBE, STRUCTURAL DRAWINGS
1/2" P.J.F.
ENCAPSULATE ALL EXTERIOR STRUCTURAL COMPONENTS W/ CLOSED CELL SPRAY INSULATION, WRAP W/ ALUMINUM BRAKE METAL
STEEL ANGLE TO SUPPORT STOREFRONT
METAL STUD FRAMING, INFILL W/ CLOSED CELL SPRAY INSULATION
HOT DIPPED GALV. STEEL ANGLESUSPENDED GYPSUM CEILING @ PERIMETER, SEE RCP
2' HORIZONTAL RIGID INSULATION AROUND
PERIMETER
REFER TO CIVIL DRAWINGS FOR EXTERIOR CONDITION
WEEPS @ 24" O.C., TYP.
2" RIGID INSULATION EACH SIDE OF FOUNDATION WALL
THROUGH CAVITY FLASHING
SOLID GROUT UNDER FLASHING
CONTINUOUS MOISTURE BARRIER
2" POLYISOCYANURATE INSULATION
3 5/8" CFMF
ALIGN SLOPE WITH STRUCTURE
75° .
8" 24 1/2"
8 1/2"
FIRST FLOOR0"
12
CLERESTORY14' - 4"
BULLNOSE3' - 8"
SF19
MULTIPURPOSE C
122
2' HORIZONTAL RIGID INSULATION AROUND
PERIMETER
2" RIGID INSULATION EACH SIDE OF FOUNDATION WALL
CONTINUOUS MOISTURE BARRIER
EXPOSED STRUCTURAL STEEL TO BE COATED WITH HIGH PERFORMANCE THERMAL RESISTIVE PAINT AT ALL THERMAL TRANSITIONS TYPICAL
4 1/2" ALUMINUM STOREFRONT CLERESTORY
NOTE: SEE STRUCTURAL DRAWINGS FOR FOUNDATION AND UNDERSLAB DRAIN LOCATIONS
6" ALUMINUM STOREFRONT, SEE WINDOW ELEVATIONS
10"
8'-3"
HSS BEAM, SEE STRUCTURAL DRAWINGS ENCAPSULATE W/ CLOSED CELL SPRAY INSULATION, WRAP W/ ALUMINUM BRAKE METAL
GYPSUM SHEATHING W INTEGRAL MOISTURE BARRIER. FLASH ALL SEAMS. PROVIDE ALL REQUIRED BLOCKING.
WOOD LOOK METAL SOFFIT
PT BLOCKING AT ROOF EDGE1/2" COVER BOARD
TAPERED POLYISOCYANURATE INSULATION
PREFINISHED ALUMINUM GUTTER
FULLY ADHERED EPDM ROOFING MEMBRANE
METAL DECKING, SEE STRUCTURAL DRAWINGS
ALUMINUM DRIP EDGE
ALUMINUM FASCIA AND DRIP EDGE
CONTINUOUS MOISTURE BARRIER
STEEL OUTRIGGERS W/ SOLID BLOCKING ALONG BOTTOM. FILL ENTIRE VOID W/ CLOSED CELL SPRAY INSULATION
LAP MOISTURE BARRIER AROUND SOFFIT FRAMING, INTEGRATE W/ ROOF AND CLOSED CELL
INSULATED METAL PANEL
STEEL CHANNEL AND BLOCKING, SEE STRUCTURAL DRAWINGS
6" ALUMINUM STOREFRONT CLERESTORY
HSS TUBE W/ METAL PLATE TO SUPPORT STOREFRONT
SEE SITE DRAWINGS FOR EXTERIOR CONDITION
THERMAL BREAK IN CONCRETE
ALUMINUM FILLER BY STOREFRONT MFG.
ENCAPSULATE ALL EXTERIOR STRUCTURAL COMPONENTS W/ CLOSED CELL SPRAY INSULATION, WRAP W/ ALUMINUM BRAKE METAL
STEEL ANGLE TO SUPPORT STOREFRONT
METAL STUD FRAMING, INFILL W/ CLOSED CELL SPRAY INSULATION
RECEPTICAL14 WALL HUNG SINK WITH SOAP DISPENSER15 SOAP DISPENSER16 ADA WALL HUNG SINK17 ADA SHOWER SURROUND
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_r
occo
petit
to.rv
t4/
16/2
020
9:59
:45
AM
A9.0
DOOR SCHEDULE
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
Revisions
ADDENDA 4 APRIL 17, 2020
DOOR SCHEDULE
DO
OR
#
RO
OM
#
RO
OM
NAM
E
DO
UBL
E LE
AF D
OO
R DOOR HARDWARE FRAME RATING
COMMENTSWID
TH
HEI
GH
T
TYPE
MAT
ERIA
L
GLA
ZIN
G
SET
#
PAN
IC
ADA
TYPE
MAT
ERIA
L
GLA
ZIN
G
HEA
D
JAM
B
SILL
UL
STC
100A 100 CORRIDOR ● 6' - 0" 7' - 0" FG AL Y 1 Y Y AL Y S2 NA NA FOB ACCESS CONTROL WITH ACCESSIBLE OPERATOR101 100 CORRIDOR 3' - 0" 7' - 0" EX EX EX 2 EX EX EX EX EX EX EX EX EX EX ADD ALARM ACTIVATED MAGNETIC HOLD OPEN TO EXISTING DOOR102 102 CORR. 3' - 0" 7' - 0" FG AL Y 4 y y AL Y NA NA103 103 VEST 3' - 0" 7' - 0" FG AL Y 4 Y Y AL Y S2 NA NA ACCESSIBLE OPERATOR105 144 HEALTH 3' - 0" 7' - 0" FG WD Y 5 N Y HM N H1 J1 20 NA106 106 TLT 3' - 0" 7' - 0" F WD N 6 N Y HM N H1 J1 S1 NA NA
108A 108 HUMAN SERVICES 3' - 0" 7' - 0" HG WD Y 7 N Y HM N H1 J1 20 NA FOB ACCESS CONTROL FAIL SECURE108B 108 HUMAN SERVICES 3' - 0" 7' - 0" F WD N 8 N Y HM N H1 J1 45 NA FOB ACCESS CONTROL FAIL SECURE WITH ALARM ACTIVATED MAGNETIC HOLD OPEN108C 108 HUMAN SERVICES 3' - 0" 7' - 0" HG WD Y 7 N Y HM N H1 J1 20 NA FOB ACCESS CONTROL FAIL SECURE109 109 OFFICE 3' - 0" 7' - 0" FG WD Y 7 N Y HM N H1 J1 NA 55 FOB ACCESS CONTROL FAIL SECURE110 108 HUMAN SERVICES 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 NA 55 FOB ACCESS CONTROL FAIL SECURE111 111 OFFICE 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 NA 55112 108 HUMAN SERVICES 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 NA 55114 114 OFFICE 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 NA 55115 115 OFFICE 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 NA 55116 108 HUMAN SERVICES ● 6' - 0" 7' - 0" F WD N 10 N Y HM N H1 J1 45 NA117 117 THRIFT STORE 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 20 NA118 118 WOMENS 3' - 0" 7' - 0" F WD N 11 N Y HM N H1 J1 S1 20 NA119 119 MENS 3' - 0" 7' - 0" F WD N 11 N Y HM N H1 J1 S1 20 NA
120A 120 MULTI PURPOSE A 3' - 0" 7' - 0" FG WD Y 12 Y Y HM N H1 J1 20 NA120B 120 MULTI PURPOSE A ● 6' - 0" 7' - 0" FG AL Y 13 Y Y AL Y S2 NA NA ACCESSIBLE OPERATOR121A 121 MULTIPURPOSE B 3' - 0" 7' - 0" FG WD Y 12 Y Y HM N H1 J1 20 NA121B 121 MULTIPURPOSE B ● 6' - 0" 7' - 0" FG AL Y 1 Y Y AL Y S2 NA NA FOB ACCESS CONTROL WITH ACCESSIBLE OPERATOR121C 121 MULTIPURPOSE B 3' - 0" 7' - 0" FG WD Y 12 Y Y HM N H1 J1 20 NA122A 122 MULTIPURPOSE C 3' - 0" 7' - 0" FG WD Y 12 Y Y HM N H1 J1 20 NA122B 122 MULTIPURPOSE C ● 6' - 0" 7' - 0" FG AL Y 13 Y Y AL Y S2 NA NA ACCESSIBLE OPERATOR123A 123 STOR. ● 6' - 0" 7' - 0" F WD N 15 N Y HM N H1 J1 45 NA123B 123 STOR. ● 6' - 0" 7' - 0" F WD N 15 N Y HM N H1 J1 45 NA124A 124 MULTI-PURPOSE 3' - 0" 7' - 0" FG AL Y 19 Y Y AL Y S2 NA NA124B 124 MULTI-PURPOSE 3' - 0" 7' - 0" HG WD Y 12 Y Y HM N H1 J1 20 NA125A 125 MULTI-PURPOSE 3' - 0" 7' - 0" FG AL Y 19 Y Y AL Y S2 NA NA125B 125 MULTI-PURPOSE 3' - 0" 7' - 0" HG WD Y 12 Y Y HM N H1 J1 20 NA126 125 MULTI-PURPOSE 3' - 0" 7' - 0" F WD N 17 N Y HM N H1 J1 NA NA
127A 127 KITCHEN 3' - 0" 7' - 0" HG WD Y 16 N Y HM N H1 J1 20 NA127B 120 MULTI PURPOSE A 3' - 0" 7' - 0" HG WD Y 18 N Y HM N H1 J1 20 NA127C 127 KITCHEN 3' - 0" 7' - 0" FG AL Y 19 Y Y AL Y S2 NA NA FOB ACCESS CONTROL128A 128 KITCHEN STOR. 3' - 0" 7' - 0" F WD N 20 N Y HM N H1 J1 45 NA128B 128 KITCHEN STOR. 3' - 0" 7' - 0" F WD N 20 N Y HM N H1 J1 45 NA131A 131 STAGE 3' - 0" 7' - 0" F WD N 12 N N EX N EX EX 20 NA FIELD VERIFY DIMENSIONS131B 131 STAGE 3' - 0" 6' - 8" CL1 CL1 CL1 45 NA CHAIR LIFT FRAME AND DOOR WITH VISION PANEL, AUTOMATIC OPENER. SEE A8.0 & SPEC131B1 100 CORRIDOR 3' - 0" 6' - 8" CL1 CL1 CL1 45 NA CHAIR LIFT FRAME AND DOOR WITH VISION PANEL, AUTOMATIC OPENER. SEE A8.0 & SPEC
135 135 CUST. LCKR 3' - 0" 7' - 0" F WD N 20 N Y HM N H1 J1 45 NA136 136 MECH ● 6' - 0" 7' - 0" F WD N 15 N Y HM N H1 J1 45 NA
201A 201 ENTRY ● 6' - 0" 7' - 0" FG AL Y 1 Y Y AL Y NA NA201B 201 ENTRY ● 6' - 0" 7' - 0" FG AL Y 1 Y Y AL Y NA NA203 203 COAT 3' - 0" 7' - 0" F WD N 22 N N BN N NA NA 2 LEAF BARN DOOR SYSTEM204 210 CORRIDOR ● 6' - 0" 7' - 0" F WD N 23 N Y HM N H1 J1 NA
205A 210 CORRIDOR ● 6' - 0" 7' - 0" FG AL Y 24 N Y AL N 20 NA206 206 IT 3' - 0" 7' - 0" F WD N 12 N Y HM N H1 J1 45 NA209 209 EXERCISE/ DANCE 3' - 0" 7' - 0" FG WD Y 12 Y Y HM N H1 J1 20 NA210 210 CORRIDOR ● 6' - 0" 7' - 0" FG AL Y 26 Y Y AL Y S2 NA NA FOB ACCESS CONTROL FAIL SECURE
300B 300 GAMES 3' - 0" 7' - 0" F HM N 14 Y Y HM N H2 J2 S2 NA NA FOB ACCESS CONTROL FAIL SECURE NO ENTRY ACCESS301 301 STOR. 3' - 0" 7' - 0" F WD N 28 N Y HM N H1 J1 45 NA302 302 TLT 3' - 0" 7' - 0" F WD N 27 N Y HM N H1 J1 20 NA
310A 310 ARTS/CRAFTS 3' - 0" 7' - 0" FG WD Y 16 N Y HM N H1 J1 20 NA310B 310 ARTS/CRAFTS 3' - 0" 7' - 0" FG WD Y 16 N Y HM N H1 J1 20 NA311 310 ARTS/CRAFTS ● 6' - 0" 7' - 0" F WD N 15 N Y HM N H1 J1 45 NA
DOOR SCHEDULE ADD ALTERNATE
a209B 209 EXERCISE/ DANCE 3' - 0" 7' - 0" FG AL Y 26 Y Y AL S2 Y NA NA FOB ACCESS CONTROLa210 ● 6' - 0" 7' - 0" FG AL Y 26 Y Y AL S2 Y NA NA FOB ACCESS CONTROLa301 a301 STORAGE ● 6' - 0" 7' - 0" F WD N 5 N Y HM H1 J1 N 45 NA
a302A a302 ACTIVITY/ ARTS 3' - 0" 7' - 0" FG WD Y 25 N Y HM H1 J1 N 20 NAa302B a302 ACTIVITY/ ARTS 3' - 0" 7' - 0" F WD N 25 N Y HM H1 J1 N 45 NAa303 a303 STORAGE ● 6' - 0" 7' - 0" F WD N 15 N Y HM H1 J1 N 45 NAa304 a302 ACTIVITY/ ARTS ● 6' - 0" 7' - 0" F WD N 15 N Y HM H1 J1 N 45 NAa305 a310 ARTS/ CRAFTS ● 6' - 0" 7' - 0" F WD N 15 N Y HM H1 J1 N 45 NAa306 a306 TLT 3' - 0" 7' - 0" F WD N 24 N Y HM H1 J1 S1 N 20 NA
a310A a310 ARTS/ CRAFTS 3' - 0" 7' - 0" FG WD Y 25 N Y HM H1 J1 N 20 NAa310B a310 ARTS/ CRAFTS 3' - 0" 7' - 0" FG AL Y 26 Y Y AL S2 Y NA NA FOB ACCESS CONTROL
SEE SCHEDULE
SEE
SCHE
DULE
SEE
SCHE
DULE
SEE SCHEDULE
AL F HG
SEE SCHEDULE
SEE
SCHE
DULE
FG
BD
SEE
SCHE
DULE
SEE SCHEDULE
EQ. EQ.
WD O
SEE SCHEDULE
SEE
SCHE
DULE
2' - 1
0"8"
10"
6"6" 6"
INSULATED GLASS, TEMPERED. TYPICAL @ ALL EXTERIOR STOREFRONT LOCATIONS
DOOR SIZES ARE APPOINTED FOR PURPOSES OF BIDDING AND ARE FOR REFERENCE ONLY. GENERAL CONTRACTOR AND DOOR SUPLIER TO FIELD VERIFY ALL OPENINGS PRIOR TO ORDERING AND INSTALLING NEW DOOR AND FRAMES. DOOR MUST BE SIZED TO ACCOMMODATE CHANGE IN FLOOR THICKNESS.
GENERAL CONTRACTOR AND DOOR SUPLIER TO VERIFY ALL FINAL SIZES AND QUANTITIES OF DOORS PRIOR TO INSTALLATION.
REMOVE EXISTING DOORS AS REQUIRED, PREPARE OPENING TO RECEIVE NEW DOOR UNIT, SEE DETAILS.
ALL INTERIOR DOORS TO BE PREHUNG ON ROT RESISTANT FRAMES WITH HINGES, MILL COMPOSITE ADJUSTABLE SILL, SWEEPS & FULL WEATHER STRIPPING.
GENERAL CONTRACTOR TO PATCH, REPAIR & REPAINT ADJACENT FINISHES DISTURBED BY DOOR INSTALLATION AS REQUIRED.
SEE ARCHITECTURAL PLANS FOR ALL DOOR SWINGS.
REFER TO SPECIFICATIONS AND FINISH DRAWINGS FOR ALL FINISH INFORMATION.
PROVIDE AND INSTALL PAN FLASHING OVER ROUGH SILL FRAMING, INCLUSIVE OF THE CORNERS OF THE SILL FRAMING; SIDE FLASHING THAT EXTENDS OVER THE PAN FLASHING; TOP FLASHING THAT EXTENDS OVER THE SIDE FLASHING OR EQUIVALENT DETAILS FOR STRUCTURAL MASONRY WALLS.
AL HM
ALUMINUM
WOOD
HOLLOW METAL
FIBERGLASS
AL-X
WD-X
HMF-X
FG-X
HM HM
"SID
ELIG
HT
1"
2" SEE SCHEDULE 2"
SEE
SCHE
DULE
2"
2" SEE SCHEDULE 2"
SEE
SCHE
DULE
4"
2" 1' - 6" 2" SEE SCHEDULE 2"
SEE
SCHE
DULE
2"
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_r
occo
petit
to.rv
t4/
21/2
020
2:36
:02
PM
A9.1
DOOR ELEVATIONS & FRAMES
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1/2" = 1'-0"DOOR ELEVATIONS
1/2" = 1'-0"FRAME TYPES
Revisions
ADDENDA 4 APRIL 21, 2020
P- PAINTED (ABOVE W AINSCOT), FULL W IDTH, R.T.F.S
RB- RUBBER W ALL BASE, R.T.F.S
CH- 36"H CHAIR RAIL, R.T.F.S
MONITOR PROVIDEDBY OW NER
MONITOR PROVIDEDBY OW NER
36" P- PAINTED (W AINSCOT),
FULL W IDTH, R.T.F.SP- PAINTED (W AINSCOT),
FULL W IDTH, R.T.F.S
P- PAINTED (ABOVE W AINSCOT), FULL W IDTH, R.T.F.S
RB- RUBBER W ALL BASE, R.T.F.S
P- PAINTED (W AINSCOT), FULL W IDTH,R.T.F.S
DR-DRAPERY, FULL HT. &
W IDTH,R.T.F.S
36"
CH- 36"H CHAIR RAIL, R.T.F.S
DR-DRAPERY, FULL HT. &
W IDTH,R.T.F.S
DR-DRAPERY, FULL HT. &
W IDTH,R.T.F.S
P- PAINTED (ABOVE W AINSCOT) FULL W IDTH, R.T.F.S
3' - 4"
5' - 4
"
RS1- ROLLER SHADES,TYPICAL, R.T.F.S
4
W F- W INDOW FILM@ STOREFRONTS
R.T.F.S
RB- RUBBER W ALL BASE,
R.T.F.S
P- PAINTED (ABOVE
W AINSCOT),FULL W IDTH,
R.T.F.S
36"
CH- 36"H CHAIRRAIL, R.T.F.S
P- PAINTED (W AINSCOT),FULL W IDTH,
R.T.F.S
W F- W INDOW FILM@ STOREFRONTS
R.T.F.S
P- PAINTED W ALL (ABOVE
W AINSCOT), FULL W IDTH,
R.T.F.S
RB- RUBBER W ALLBASE, R.T.F.S
CH- 36"H CHAIRRAIL, R.T.F.S
36" P- PAINTED W ALL
(W AINSCOT), FULL W IDTH,
R.T.F.S
MONITOR PROVIDEDBY OW NER
2' - 1
0"
3' - 0" 9' - 0" 3' - 0" 6' - 0"
2' - 8
"
AW C- ACOUSTIC W OOD SOFFIT, R.T.F.S
BR1- BRICK ACCENT W ALLFULL W IDTH, R.T.F.S
QZ- QUARTZ COUNTERTOPSW ITH W ATERFALL EDGE, R.T.F.S
PL- PLASTICLAMINATE VERTICALCASEW ORK, R.T.F.S
PL- PLASTIC LAMINATEFLOATING SHELVING, PROVIDE PROPER SUPPORT, R.T.F.S
8' - 0
"
TRASH & RECYCLINGPULL OUT
CW T- FIREPLACE TILE SURROUND W RAPPED ON
ALL SIDES, FULL HT. & W IDTH, R.T.F.S
FIREPLACE
1' - 8
3/4"
CW T- CERAMIC TILE FRONTW ITH BUILT OUT BENCH SEATING,W RAPPED ON ALL SIDES, R.T.F.S
REFER TO FFE SCOPE REFER TO FFE SCOPE REFER TO FFE SCOPE
EXISTING FLOOR TO REMAIN
2
TRANSITION IN DOORW AYFROM PTF TO EXISTING
2
PTF-PORCELAIN
TILE,INSTALLATION:
TBDR.T.F.S
2
EM1- ENTRANCE MAT,INSTALLATION: TBD
2
RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS
4
RS2- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS
4
RS1- TYPICAL ROLLER SHADESIN ALL OFFICE SUITES,
R.T.F.S & INTERIOR ELEVATIONS
4
RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS
4
RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS
4
RS2- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS
4
TS1- TACKABLE W ALL SURFACE, R.T.F.S
4
TS1- TACKABLE W ALLSURFACE, R.T.F.S
4
TS1-TACKABLE W ALLSURFACE, TYPICAL IN ALL OFFICES, R.T.F.S
4
TS1-TACKABLE W ALLSURFACE, TYPICAL IN ALL OFFICES, R.T.F.S
4
TS1- TACKABLE W ALLSURFACE, TYPICAL INALL OFFICES, R.T.F.S
4
4
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_a
carls
on.rv
t4/
20/2
020
4:44
:51
PM
A10.1A
ENLARGED FINISH PLANS-PART A
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1/8" = 1'-0"A10.1A1 FIRST FLOOR FINISH PLAN- PLAN A
Revisions
ADDENDA 2 APRIL 6, 2020ADDENDA 4 APRIL 17, 2020
A7.1
7MATCH LINE 'B'MATCH LINE 'A'
CPT- CARPET TILE,INSTALLATION: TBD
R.T.F.S
CPT- CARPET TILE,INSTALLATION: TBD
R.T.F.S
EM1- ENTRANCE MAT,INSTALLATION: TBD
LVT- VINYL TILE, R.T.F.S,INSTALLATION: TBD
PTF- PORCELAIN TILE, R.T.F.S
INSTALLATION: TBD
PTF- PORCELAIN TILE,R.T.F.S,
INSTALLATION: TBD
PTF- PORCELAIN TILE INSET ACCENT
(TO FOLLOW CEILING CLOUD
PERIMETER), R.T.F.S
INSTALLATION: TBD
PTF- PORCELAIN TILE INSET ACCENT INSIDE BAR, R.T.F.S
INSTALLATION: TBD
SC- SEALED CONCRETE,R.T.F.S
SV- SHEET VINYL, R.T.F.SINSTALLATION: TBD
SV- SHEET VINYL, R.T.F.S,INSTALLATION: TBD
PTF- PORCELAIN TILE INSET ACCENT
(TO FOLLOW CEILING CLOUD PERIMETER),
R.T.F.S INSTALLATION: TBD
CW T- CERAMIC TILEFIREPLACE FRONT,ALL SIDES FULL HT. & W IDTH, R.T.F.S
RUN LVT FROM ARTS/ CRAFTS
BR- BRICK ACCENT W ALL, ALL SIDES,FULL HT. & W IDTH,R.T.F.S
A7.16
12
A7.114
A7.1
15
A7.1
3 8
A7.2
1
4
5
8
FITNESS
205
STORAGE
204
LIBRARY
202
CORRIDOR
210
GAMES
300
WOMENS
118 MENS
119THRIFT STORE
117
HUMAN SERVICES
108
EXERCISE/ DANCE
209
A7.2
3
7 6
A7.03
A7.0
1813
823
RUN CPT FROM GAMES ROOM
A7.5
3
A7.5
4
A7.57
A7.58
P- PAINTED ACCENT W ALL,FULL HT. & W IDTH, R.T.F.S
A7.2
2
P- PAINTED TW O COLORACCENT W ALL, FULL HT. & W IDTH, R.T.F.S
5' - 4"
4' - 0 3/4"
10
12
A7.1
11
A7.1
16
PTF- PORCELAIN TILE, R.T.F.S,INSTALLATION: TBD
A9.8
1
ENTRY
201A7.1
5 9
1317
CW T- CERAMIC TILEBAR FRONT ONLY,FULL HT. & W IDTH, R.T.F.S
QZ- QUARTZ COUNTERTOP, R.T.F.S
PL- PLASTIC LAMINATEMILLW ORK & FLOATING
SHELVING, R.T.F.S
RS1- ROLLER SHADES, R.T.F.S & INTERIOR ELEVATIONS
DR- DRAPERY, FULL HT. & W IDTH, R.T.F.S
QZ- QUARTZ COUNTERTOP, R.T.F.S
4
DR- DRAPERY, FULL HT.& W IDTH, R.T.F.S
RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS
W F- W INDOW FILM,TYPICAL @ STOREFRONTS,R.T.F.S
STOR.
301STOR.
311
TLT
302
RS1- ROLLER SHADES, R.T.F.S & INTERIOR ELEVATIONS
PL- PLASTIC LAMINATECASEW ORK, R.T.F.S
SS- SOLID SURFACECOUNTERTOP, R.T.F.S
W F- W INDOW FILM, TYPICAL @ ALL STOREFRONT, R.T.F.S
RS1- ROLLER SHADES, R.T.F.S & INTERIOR ELEVATIONS
RS1- ROLLER SHADES, R.T.F.S & INTERIOR ELEVATIONS
MIRRORS- FULL W IDTH. REFER TO ELEVATIONS AND FINISH NOTES
A9.82
COAT
203
ARTS/CRAFTS
310
4
4
4
4
4
TS1- TACKABLE W ALLSURFACE, R.T.F.S
4
A7.16
12
A7.114
A7.5
3
A7.5
4
A7.57
A7.58
10
CORRIDOR
210
MENS
119
EXIT
139
STORAGE
a303
STORAGE
a301
ACTIVITY/ ARTS
a302
ARTS/ CRAFTS
a310
2' - 8"
STORAGE
a304STORAGE
a305
TLT
a306
GAMES
300
LVT- VINYL TILE, R.T.F.S,INSTALLATION: TBD
RUN LVT FROMARTS/ CRAFTS
LVT- VINYL TILE, R.T.F.S,INSTALLATION: TBD
RUN LVT FROMACTIVITY/ ARTS
PTF- PORCELAIN TILE,R.T.F.S,
INSTALLATION: TBD
PTF- PORCELAIN TILE,R.T.F.S, INSTALLATION: TBD
PTF- PORCELAIN TILE INSET ACCENT
(TO FOLLOW CEILING CLOUD PERIMETER),
R.T.F.S INSTALLATION: TBD
A7.5
3Sim
7 Sim
4Sim
8 Sim
RUN LVT FROMACTIVITY/ ARTS
CPT- CARPET TILE, R.T.F.S,INSTALLATION: TBD
RUN CPT FROMGAMES
RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS
4
RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS
4
RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS
4TS1- TACKABLE W ALLSURFACE, R.T.F.S
4
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_a
carls
on.rv
t4/
20/2
020
4:44
:58
PM
A10.1B
ENLARGED FINISH PLANS-PART B
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
Revisions
ADDENDA 4 APRIL 17, 2020
1/8" = 1'-0"A10.1B1 FIRST FLOOR FINISH PLAN- PLAN B
1/8" = 1'-0"A10.1B2 FIRST FLOOR FINISH PLAN- PART B ADD ALT
N
UP
FR FR RF
LIBRARY
202COAT
203
GAMES
300
STOR.
311
STOR.
301
TLT
302
ARTS/CRAFTS
310
MENS
119
WOMENS
118THRIFT STORE
117
MULTI PURPOSE A
120
MULTIPURPOSE B
121
MULTIPURPOSE C
122
STOR.
123
CUST. LCKR
135
MECH
136
KITCHEN STOR.
128
KITCHEN
127
MULTI-PURPOSE
125
TLT
126
MULTI-PURPOSE
124
GYMNASIUM
130
STAGE
131
HEALTH
144
ELEC.
138
WOMENS
137
TLT
106
MENS
107 STOR.
116
OFFICE
109
OFFICE
110
OFFICE
111
OFFICE
112
HUMAN SERVICES
108
HUMAN SERVICES
108
OFFICE
115
OFFICE
114
1 SGN 1.2
1SGN 1.12
2
2
1SGN 1.3
2
44
CORR.
102
SIGN TYPE # SIGN LEGEND
1 DIRECTIONAL SIGNAGE
2 POST MOUNTED SIGNAGE
3 SUSPENDED SIGNAGE
4 FLAG MOUNTED SIGNAGE
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_a
carls
on.rv
t4/
20/2
020
11:2
3:17
AM
SGN1.14
SIGNAGE PLAN
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1/8" = 1'-0"SGN1.141 SIGNAGE - FIRST FLOOR PLAN A
Revisions
ADDENDUM #4 APRIL 21, 2020
ARTS/CRAFTS
310
CORRIDOR
210
LIBRARY
202
STORAGE
204
FITNESS
205
EXERCISE/ DANCE
209
THRIFT STORE
117
HUMAN SERVICES
108
MENS
119
WOMENS
118
GAMES
300
STOR.
311
STOR.
301
TLT
302
COAT
203
IT
206
2
1SGN 1.0
1 SGN 1.1
4
4
SIGN TYPE # SIGN LEGEND
1 DIRECTIONAL SIGNAGE
2 POST MOUNTED SIGNAGE
3 SUSPENDED SIGNAGE
4 FLAG MOUNTED SIGNAGE
1SGN 1.0
4
4
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
NOT FOR CONSTRUCTION
ISSUED FOR REVIEW ONLY
A
30' - 0 25/32"47' - 6"
B
C:\R
evit
Loca
l\RO
CKY
HIL
L_C
D_a
carls
on.rv
t4/
20/2
020
11:2
3:21
AM
SGN1.15
SIGNAGE PLAN
CONSTRUCTION DOCUMENT SETMARCH 23, 2020
1934
Rocky Hill SeniorCommunity
Center
NEW BUILDING FOR:
ROCKY HILL, CT
1/8" = 1'-0"SGN1.151 SIGNAGE - FIRST FLOOR PLAN B
Revisions
ADDENDUM #4 APRIL 21, 2020
1/8" = 1'-0"SGN1.152 SIGNAGE - FIRST FLOOR PLAN B ADD ALT
4" S
4" 8" S
T4" S
T
2" W2" W
UP
RD
-2
RD
-2
6" O
RL
4" O
RL
6" O
RL
4" O
RL
4" S
T
4" O
RL
EW
C-1
1 1
/2" V
DN
1 1
/2" V
2" W D
WN
195 Scott S
wam
p Road Farm
ington, CT
06032
Dra
wn
By
:S
tate
Pro
ject #
:
Sh
eet #
:
Issu
e D
ate
:
C:\_Revit Projects\MEP_19-270 Rocky Hill Senior Center_R19_fmendykE3J5Y.rvt
PL
AC
EH
OL
DE
RD
ate
1
SK
P-1
1934
EW
C-1
AL
TE
RN
AT
E B
ID W
AS
TE
AN
D V
EN
T P
IPIN
G
Ro
ck
y H
ill Se
nio
r / Co
mm
un
ityC
en
ter
NE
W B
UIL
DIN
G F
OR
:
OL
D M
AIN
ST
RE
ET
RO
CK
Y H
ILL
, CT
FS
M
1/8
" = 1
'-0"
1P
LU
MB
ING
UN
DE
RS
LA
B P
LA
N -
PA
RT
'B' -
AD
D A
LT
RF
I#1
1/8
" = 1
'-0"
2P
LU
MB
ING
DR
AIN
AG
E P
LA
N -
PA
RT
'B' -
AD
D A
LT
RF
I#1
4/10/2020
4
EXISTING EXHAUST FAN
EXISTING RTU-4
EXISTING RTU-5
EXISTING KEF-1
3
1
1
2
2
5 6
HVAC DEMOLITION GENERAL NOTES
1. BEFORE SUBMITTING BID, THE CONTRACTORS SHALL VISIT THE JOB SITE AND BECOME FULLY FAMILIAR WITH THE EXISTING CONDITIONS AND THE DOCUMENTS OF OTHER TRADES UNDER WHICH THEIR WORK WILL BE ACCOMPLISHED. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ASSUMPTIONS, OMISSIONS OR ERRORS MADE AS A RESULT OF FAILURE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS.
2. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE ANY DAILY INTERRUPTIONS OR SHUTDOWNS OF THE EXISTING SYSTEMS IN ADVANCE WITH OWNER'S DESIGNATED REPRESENTATIVE. THIS SHALL INCLUDE SERVICES INTERRUPTIONS, CONNECTIONS AND DISRUPTIONS EFFECTING OTHER TRADES (MECHANICAL AND ELECTRICAL). INCLUDE ALL WORK REQUIRED TO ALLOW PHASED CONSTRUCTION WHERE NECESSARY.
3. DEMOLITION DRAWINGS ARE STRICTLY DIAGRAMMATIC AND SHOW GENERAL ARRANGEMENT AND APPROXIMATE LOCATION OF EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT. IT IS NOT THE INTENT OF THESE DRAWINGS TO SHOW ALL EQUIPMENT, PIPING OR CONDUIT TO BE REMOVED. EQUIPMENT NOT BEING REUSED SHALL BE REMOVED, INCLUDING ALL ASSOCIATED HANGERS, SUPPORTS, PIPES, CONDUITS, WIRES, AND CONTROLS BACK TO THE POINT OF ORIGIN.
4. REFER TO THE ARCHITECTURAL DEMOLITION DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS. THE FULL EXTENT OF THE DEMOLITION AND RECONSTRUCTION SCOPE OF WORK SHALL BE DETERMINED BY THE ENTIRE SET OF BID DOCUMENTS.
5. THE CONTRACTORS SHALL COORDINATE THE DEMOLITION SCOPE OF WORK WITH THE GENERAL CONTRACTOR'S OR CONSTRUCTION MANAGER'S PHASING SCHEDULE PRIOR TO COMMENCEMENT OF WORK. CARE MUST BE TAKEN SO AS NOT TO DESTROY, REMOVE OR DEMOLISH ANY EQUIPMENT, APPURTENANCES OR DEVICES INTENDED TO REMAIN. PROVIDE TEMPORARY SERVICES AND SYSTEM MODIFICATIONS TO ACCOMMODATE CONTINUOUS OPERATION OF ACTIVE SYSTEM.
6. THE LOCATION OF EXISTING HVAC SYSTEM SHOWN ON FLOOR PLANS, IS BASED ON THE BEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL FIELD VERIFY PRIOR TO COMMENCEMENT OF CONSTRUCTION, EXACT QUANTITY AND LOCATION(S) OF EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO BE REMOVED AND ADJUST AS NECESSARY.
7. ALL EQUIPMENT, AND ASSOCIATED PIPING INDICATED TO BE REMOVED OR RELOCATED, SHALL BE DISCONNECTED AND REMOVED, INCLUDING HANGERS AND OTHER COMPONENTS, UP TO NEAREST EXISTING ACTIVE MAIN OR BRANCH LINE AND CAPPED AS CLOSE TO THE ACTIVE LINE AS POSSIBLE. NO EQUIPMENT, PIPING, OR CONDUIT SHALL BE ABANDONED IN PLACE, UNLESS SPECIFICALLY NOTED.
8. ALL SYSTEMS TO BE REMOVED SHALL BE REMOVED BACK TO THE POINT OF SOURCE. THE CONTRACTOR SHALL VERIFY WHICH SYSTEMS MUST REMAIN ACTIVE TO SERVE ADJACENT SPACES DURING CONSTRUCTION. SHOULD THE CONTRACTOR ENCOUNTER, DURING DEMOLITION OF EXISTING WALLS OR CHASES, ANY PIPING OR CONDUIT WHICH MUST REMAIN ACTIVE, HE SHALL IMMEDIATELY GIVE NOTICE TO THE ENGINEER, GENERAL CONTRACTOR OR CONSTRUCTION MANAGER.
9. ALL SALVAGEABLE MATERIALS OR EQUIPMENT TO BE REMOVED SHALL BE TURNED OVER TO THE OWNER AT THE END OF EACH DAY. ITEMS REMOVED AND NOT REUSED OR CLAIMED BY THE OWNER SHALL BECOME PROPERTY OF THE TRADE CONTRACTOR AND SHALL BE TRANSPORTED FROM THE SITE. SITE STORAGE OF REMOVED ITEMS WILL NOT BE PERMITTED.
10. PROPERLY DISPOSE OF ALL DEMOLISHED EQUIPMENT IN COMPLIANCE WITH CODES AND REGULATIONS; THIS APPLIES TO HAZARDOUS MATERIALS AND CONTAMINATED ITEMS TO BE DEMOLISHED.
11. THE CONTRACTOR SHALL OBTAIN EXISTING MECHANICAL DRAWINGS FROM THE OWNER IF AVAILABLE TO HELP DETERMINE FULL SCOPE OF WORK.
HVAC DEMOLITION KEY NOTES
REMOVE EXISTING ROOFTOP UNIT RTU-4 AND ALL ASSOCIATED DUCTWORK, GRILLES, DIFFUSERS, CONTROLS, WIRING AND SUPPORTS. CAP GAS PIPING AT MAINS. VERIFY EXACT EXTENT OF WORK IN FIELD. CAP & SEAL EXISTING ROOF OPENING, MATERIALS AND COLOR TO MATCH EXISTING, SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
REMOVE EXISTING ROOFTOP UNIT RTU-5 AND ALL ASSOCIATED DUCTWORK, GRILLES, DIFFUSERS, CONTROLS, WIRING AND SUPPORTS. CAP GAS PIPING AT MAINS. VERIFY EXACT EXTENT OF WORK IN FIELD. CAP & SEAL EXISTING ROOF OPENING, MATERIALS AND COLOR TO MATCH EXISTING, SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
REMOVE EXISTING EXHAUST FAN AND ALL ASSOCIATED DUCTWORK, GRILLES, CONTROLS, WIRING AND SUPPORTS. VERIFY EXACT EXTENT OF WORK IN FIELD. CAP & SEAL EXISTING ROOF OPENING, MATERIALS AND COLOR TO MATCH EXISTING, SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
EXISTING KITCHEN EXHAUST FAN AND ALL ASSOCIATED GREASE HOOD, DUCTWORK AND CONTROLS TO REMAIN AS IS. VERIFY EXACT EXTENT OF WORK IN FIELD.
REMOVE EXISTING TOILET EXHAUST FAN AND ALL ASSOCIATED DUCTWORK, GRILLES, CONTROLS, WIRING, AND SUPPORTS. VERIFY EXACT EXTENT OF WORK IN FIELD. CAP & SEAL EXISTING ROOF OPENING, MATERIALS AND COLOR TO MATCH EXISTING, SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
EXISTING SUPPLY DUCTWORK AND DIFFUSERS TO REMAIN, RELOCATE EXISTING DIFFUSERS INTO NEW CEILING, EXTEND DUCTWORK AS NECESSARY.
1
3
2
4
5
6
MECHANICAL, ELECTRICAL, AND
STRUCTURAL ENGINEERING750 OLD MAIN STREET
SUITE 202
ROCKY HILL, CT 06067
P: (860) 436-4336
F: (860) 436-4450
www.rzdesignassociates.com
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
A
30' - 0 25/32"47' -6"
B
4/2
1/2
020 1
1:4
1:0
3 A
M
MD1.1
MECHANICAL DEMOLITIONPLAN
CONSTRUCTION DOCUMENT SET
MARCH 23, 2020
1934
Rocky Hill Senior/ Community
Center
NEW BUILDING FOR :
ROCKY HILL, CT
Revisions
ADDENDA #4 APRIL 21, 2020
ACAC48"GFI
AC AC
F
84"
M
CR
CR CR
DLDL
48"GFI
TS
J
HUMAN SERVICES108
OFFICE110
OFFICE109
STOR.116
TLT106
MENS107
WOMENS137
ELEC.138
H1L1
NEW PANEL 'H1' - 250A MLO, 480/277V, FED FROM BUILDING MAIN DISTRIBUTION PANEL
NEW PANEL 'L1' - 225A MCB, 208/120V, FED FROM TRANSFORMER 'T1'
TRANSFORMER 'T1' - 75kVA, 480-208/120V, FED FROM PANEL 'H1'.
L1-6L1-9
L1-8
L1-10
L1-7
L1-37,39ACU-1
L1-38MDP
P2
P1 T-EX
HEALTH144
L1-52
RTU-5
CUH-3
CONNECTION FOR LULA LIFT. INSTALL AND WIRE RAISE LOWER CONTROLS AT EACH DOOR (PROVIDE WITH LIFT)
L1-69
L1-71
BUILDING MAIN C/B AND CT CABINET. 800A, 480/277V
BUILDING AUTOMATIC TRANSFER SWITCH. 800A, 480/277V
PANEL HV-MDB-A. 800A, 480/277V
MAINELEC.ROOM
ELEC.ROOM
FIRE ALARM CONTROL PANEL
OLD MAIN ST. ENTRANCE
MECHANICAL, ELECTRICAL, AND
STRUCTURAL ENGINEERING750 OLD MAIN STREET
SUITE 202
ROCKY HILL, CT 06067
P: (860) 436-4336
F: (860) 436-4450
www.rzdesignassociates.com
N
195 Scott Swamp RoadFarmington, CT 06032
qamarch.com
Issue Dates:
Project #:
A
30 ' -0 25/32 "47 ' -6 "
B
4/1
7/2
020 2
:10:4
7 P
M
SKE-1
EXISTING ELECTRICAL ROOMLOCATIONS
CONSTRUCTION DOCUMENT SET
MARCH 23, 2020
1934
Rocky Hill Senior/ Community
Center
NEW BUILDING FOR :
ROCKY HILL, CT
Revisions
F F
GFIWP
GFIWP
DLDL
J J
MULTI PURPOSE A120
MULTIPURPOSE B121
MULTIPURPOSE C122
PATIO150
MDP-26,28,30
SK
SKSK
SK
ALTERNATE #3: POWER FOR OPERABLE PARTITIONSPROVIDE 3#12+#12G~3/4"C FOR OPERABLE PARTITIONCONTROLLERS. INSTALL OPERATING KEY SWITCHES(PROVIDED WITH CONTROLLERS) AND ROUTE 5#18TO KEY SWITCHES.(20A-3P)
195 Scott Swamp Road Farmington, CT 06032
Drawn By:State Project #:
Sheet #:
Issue Date:
C:\_
Revit P
roje
cts
\ME
P_
19
-27
0 R
ocky H
ill S
en
ior
Cen
ter_
R1
9_d
luch
ini@
rzde
sig
nassocia
tes.c
om
.rvt
ADDENDA #4APRIL 21,
2020
SKE-3
1934
POWER FOR OPERABLE PARTITIONS - ALTERNATE #3
Rocky Hill Senior / CommunityCenter
NEW BUILDING FOR :
OLD MAIN STREET
ROCKY HILL, CTDSL
+66"
ACGFI
ACGFI
ACGFI
ACGFI
66"
48"GFI
SD
+24"
66"
+66"
STOR.301
GAMES300
CORRIDOR210
STORAGE204
TLT302
STOR.311
ARTS/CRAFTS145
SA
L1-59
L1-60
L1-61
RTU-3
IT206
COAT203
L1-63
L1-68
ELECTRIC WATER COOLER:ROUTE 2#12+#12G~3/4"C TO 20A-1PGFCI C/B IN PANEL 'L1'
195 Scott Swamp Road Farmington, CT 06032
Drawn By:State Project #:
Sheet #:
Issue Date:
C:\_
Revit P
roje
cts
\ME
P_
19
-27
0 R
ocky H
ill S
en
ior
Cen
ter_
R1
9_d
luch
ini@
rzde
sig
nassocia
tes.c
om
.rvt
ADDENDA #4APRIL 21,
2020
SKE-4
1934
ADD CIRCUIT FOR ELECTRIC WATER COOLER
Rocky Hill Senior / CommunityCenter
NEW BUILDING FOR :
OLD MAIN STREET
ROCKY HILL, CTAuthor
NOTE: SEE 2/P1.1B FOR ADD ALTERNATE LOCATION OF ELECTRIC WATER COOLER
84"
+66"
U
U
U
U
U
+66"
GFIW
P
J
FITNESS205
LIBRARY202
STORAGE204
L1-46
CUH-5
L1-53
L1-54
L1-55
L1-56
IT206
COAT203
L1-63
CONNECTION FOR FIREPLACE CIRCUIT
195 Scott Swamp Road Farmington, CT 06032
Drawn By:State Project #:
Sheet #:
Issue Date:
C:\_
Revit P
roje
cts
\ME
P_
19
-27
0 R
ocky H
ill S
en
ior
Cen
ter_
R1
9_d
luch
ini@
rzde
sig
nassocia
tes.c
om
.rvt
ADDENDA #4APRIL 21,
2020
SKE-5
1934
Revised Power/Data at Library Monitor
Rocky Hill Senior / CommunityCenter
NEW BUILDING FOR :
OLD MAIN STREET
ROCKY HILL, CTDSL
GFIWP
+66"
ACGFI
ACGFI
ACGFI
ACGFI
66"
F DL
48"GFI
SD
SD
+24"
66"
+66"
STOR.301
GAMES300
EXIT139
MENS119
L1-23L1-24
L1-25
TLT302
STOR.311
L1-58
SA
L1-59
L1-60
RTU-2
RTU-3
COAT203
L1-68
195 Scott Swamp Road Farmington, CT 06032
Drawn By:State Project #:
Sheet #:
Issue Date:
C:\_
Revit P
roje
cts
\ME
P_
19
-27
0 R
ocky H
ill S
en
ior
Cen
ter_
R1
9_d
luch
ini@
rzde
sig
nassocia
tes.c
om
.rvt
ADDENDA #4APRIL 21,
2020
SKE-6
1934
Revised Power/Data at Games Rm Monitors
Rocky Hill Senior / CommunityCenter
NEW BUILDING FOR :
OLD MAIN STREET
ROCKY HILL, CTAuthor
Note: Revision is typical for 2/E2.1B
U
U
U
U
ACGFI
ACGFI
ACGFI
ACGFI
J
SD
SD
SD
+66"66"
MENS119
WOMENS118
L1-21
L1-22
L1-17L1-18
L1-19 L1-23
L1-46
CUH-5
L1-53
RTU-1A
RTU-2
RTU-3
COAT203
CONNECTION FOR FIREPLACE CIRCUIT
L1-68
195 Scott Swamp Road Farmington, CT 06032
Drawn By:State Project #:
Sheet #:
Issue Date:
C:\_
Revit P
roje
cts
\ME
P_
19
-27
0 R
ocky H
ill S
en
ior
Cen
ter_
R1
9_d
luch
ini@
rzde
sig
nassocia
tes.c
om
.rvt
ADDENDA #4APRIL 21,
2020
SKE-7
1934
Additional Power/Data Coffee Bar
Rocky Hill Senior / CommunityCenter
NEW BUILDING FOR :
OLD MAIN STREET
ROCKY HILL, CTDSL
OS
OS OS
OC
3
4
A2E
A2
A2E
A2
A2E
A2
A1
A1E
A1
A1
A1
A1
A2F A2F A2F
A2E
MULTI-PURPOSE125
TLT126
KITCHEN127
KITCHEN STOR.128
C1 C1 C1 C1 C1
C1 C1 C1
A2F A2F A2F A2F
K K
K
K
TYPE 'K' WALL SCONCE TO BE KUZCO#WS8016-3500K, WITH 277-120VLIGHTING AUTOTRANSFORMER (TYP.)