Page 1: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

November 2015

Northern Indiana Commuter Transportation District

Page 2: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Purpose of Workshop Project Overview

Share Information on Project Updates

Seek Input on Alternatives and Options

Define How You Can Be Involved

2

Page 3: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

3

Study Overview

FTA and NICTD are Conducting an Environmental Review of the West Lake Corridor Project

The Study includes Rail Based Service between the Munster/Dyer area and Metra’s Millennium Station in Downtown Chicago

The Study evaluates Alignments, Stations and Operating Facility Locations in the Corridor

Page 4: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

How Did We Get Here?

4

Regional Agency Conducted Initial Study 1989

NICTD Completed West Lake Corridor Study 2011

Released 20-Year Strategic Business Plan June 2014

Began Environmental Review Process Sept 2014

Federal Lead Agency:

Federal Transit Administration (FTA)

Local Lead Agency:

Northern Indiana Commuter

Transportation District

Prepare

Environmental

Impact Statement

(EIS) under

National

Environmental

Policy Act (NEPA)

Page 5: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

West Lake Funding Sources

Funding Sources

RDA

State of Indiana Local

Participating Communities

FTA New Starts

Program

Page 6: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

What is Purpose for Project?

Serve High-Growth Areas in Lake County

Conveniently Connect to Chicago

Establish Alternative to Driving

Lower Commute Times and Costs

Increase NICTD System Ridership

Promote Economic Development

Create Local Jobs

Attract and Retain Younger Families

Provide Valued Transportation Asset

Page 7: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

What is the Need for the Project?

Increase Transportation Options for Accessing Chicago

Reduce Travel Time from the Study Area to Chicago

Reduce the Parking Burden at Existing Transit Stations

Reduce Travel Costs

7

Page 8: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Study Purpose

Advance West Lake Corridor Project

– Complete Draft Environmental Impact Statement (DEIS) in Compliance with NEPA

– Select a Preferred Alternative (PA)

– Enter Project Development under FTA New Starts

8

Page 9: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

9

9-Mile Extension of Existing South Shore Line (SSL)

24 Trains per Weekday and Weekend Service

4 Stations in Hammond, Munster, and Dyer

Maintenance Facility

Options for Alignment, Stations, Maintenance and Layover Facilities

West Lake Project Overview

Page 10: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

10

Indiana Harbor Belt (IHB) Alignment

Hammond Design Option Alignment

Station Options

– Hammond

– Munster

Maintenance Facility

– Hammond – 2 sites

– Munster/Dyer

Layover Facility

– Munster/Dyer

Alternative Options

Page 11: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Project Updates Southern Terminal

Railroad Requirements

Mid-day / Weekend Service

Conceptual Design

– Vehicle Technology

– Alignments Alternatives

– Station Location Options

– Maintenance Facility Location Options

– Bike Trail Location in the Corridor

11

Page 12: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

12

Why So Many Design Options?

Required to evaluate all feasible design options meeting the purpose and need of the project

To consider and evaluate each alternative in a comparable level of detail

Field work is included for all design options minimizing the need for additional investigation

Page 13: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Existing South Shore Electric Trains

Vehicle Technology

13

Page 14: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Boarding Platforms

Shelters

Parking

Multi-Modal Access

Stations

14

East Chicago Station, SSL Dune Park Station, SSL

Hegewisch Station, SSL

Page 15: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Denton County A-Train Maintenance Facility

15

Metra Electric District – Richton Layover

Welfare Building for Crew

Storage Tracks for

Overnight Layover

Parking

Layover Facility

Maintenance Facility Shop Building for

Maintenance of Vehicles

Storage Tracks

Parking and Support Facilities

Page 16: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Operations Facilities

If maintenance facility is here…

…layover facility is

needed here

Page 17: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Key Considerations:

Transportation

Land Use and Acquisitions

Economic Development

Neighborhoods and Community Facilities

Environmental Justice

Parks and Recreational

Historic and Archeological

Noise and Vibration

Visual and Aesthetics

Water and Ecological

Farmlands

Hazardous Materials

Safety and Security

Short-Term Construction

NEPA Umbrella

Data Collection

and Analysis

National Environmental Policy Act

17

Page 18: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

18

What is a DEIS?

Required for Federal Funding

Discloses Impacts of the project and Proposed Mitigation Measures

Improves Decision Making

Serves as a Means for Public Comment

Follows NEPA Requirements for Documentation

Public Hearing is Part of the Required Process

Page 19: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Environmental Impact Statement Process

WE ARE HERE

Scoping and Screening

• Identify Issues

• Develop and

screen alternatives

Draft EIS

• Data Collection

and Analysis

• Prepare Technical

Reports

• Prepare Draft EIS

on remaining

alternatives

• Circulate Draft EIS

• Hold Public

Hearings

Final EIS Record of Decision

• Respond to

comments

• Prepare Final EIS

• Prepare Record

of Decision

Page 20: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Ongoing Coordination Federal Transit Administration

Regional Development Authority

Municipalities

Railroads

US Army Corps of Engineers

State Historic Preservation Office

20

Page 21: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

2014

21

West Lake Overall Project Schedule

AA

2015 2016 2017 2018 2019 2020 2021 2022

Environmental Impact Statement

Project Development

Engineering Construction

SCOPING DRAFT

EIS &

PREFERRED

ALTERNATIVE

ROD/

FEIS

FTA

FEDERAL

GRANT

APPLICATION

FTA FULL

FUNDING

GRANT

PROJECT

START UP

2023

Page 22: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Key to Success: Partnerships

Community, Stakeholder &

Agency Partners

Page 23: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Next Steps

Public Workshops – November 2015

Begin Project Development – Summer 2016

DEIS Public Review – Fall 2016

DEIS Public Hearings – Fall 2016

23

Page 24: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

24

– Project Website: http://www.nictdwestlake.com/

– Email: [email protected]

– Call: 219-250-2920

– Mail: NICTD West Lake Corridor Project

33 East U.S. Highway 12

Chesterton, IN 46304

How Can You Participate and Stay Informed

Page 25: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

25

Workshop Breakout Areas

1. Project Overview

2. Environmental Process

3. Alignment Options

4. Station and Facility Options

Page 26: Northern Indiana Commuter Transportation Districtbloximages.chicago2.vip.townnews.com/nwitimes.com/... · 2015-11-13 · How Did We Get Here? 4 Regional Agency Conducted Initial Study

Northern Indiana Commuter Transportation District