Page 1: North Washington Street Bridge Project

North Washington Street Bridge Project Charlestown Neighborhood Council Briefing

April 6, 2016 1

Boston, Massachusetts

Page 2: North Washington Street Bridge Project

2

City of Boston: Para Jayasinghe, City Engineer Mass DOT: Michael O’Dowd, Project Manager

Introduction

Page 3: North Washington Street Bridge Project

3

City of Boston Mass DOT Highway Division Federal Highway Administration Bridge Engineer: Benesch Bridge Architect: Rosales + Partners Public Involvement Specialist: Howard Stein Hudson

Project Team

Page 4: North Washington Street Bridge Project

Existing Bridge

NORTH END

BOSTON HARBOR CHARLESTOWN

LOVEJOY WHARF

4

Page 5: North Washington Street Bridge Project

Existing Bridge Context

5

Project Limits

Project Limits

NORTH END CHARLESTOWN

BOSTON HARBOR

CHARLES RIVER

Page 6: North Washington Street Bridge Project

1898 Existing Bridge Constructed - 12 spans, 1087’ in Length 1956 Bridge is Reconstructed 1961 Swing Span Closed Permanently 1977 Elevated Street Railway Structure Removed 1992 Adjoining Warehouse Bridge Structure in Charlestown is Replaced 2003 Center Truss Bay Lanes Closed 2004-2015 Ongoing Maintenance and Repairs

Project History

6

Page 7: North Washington Street Bridge Project

Existing Bridge

7

Page 8: North Washington Street Bridge Project

Existing Bridge

8

Page 9: North Washington Street Bridge Project

Existing Bridge

9

Page 10: North Washington Street Bridge Project

10

• Replacement of Structurally Deficient Bridge • Multi-Modal Bridge as a Complete City Street over Water • Improvements to Deficient Bike and Pedestrian Accommodations • Improvements to Intersections Safety and Functionality • Improvements to Navigation Channel • Context Sensitive Bridge Design in Important Waterfront and Historic

Bridge Location • Visually Appealing Bridge Design Complementing the Zakim Bridge

Project Goals

Page 11: North Washington Street Bridge Project

Form

Iconic (Zakim Bridge)

vs. Iconic-lite

(Charlestown Bridge)

Function

Interstate Highway (Zakim Bridge)

vs. City Street over water (Charlestown Bridge)

11

Proposed Bridge – Design Philosophy

Page 12: North Washington Street Bridge Project

12

Bridge Type Study Alternatives

Double Steel Arch Alternative Single Diagonal Steel Arch Alternative

Hammerhead Piers Alternative V-Shape Piers Alternative

Page 13: North Washington Street Bridge Project

13

Comprehensive Bridge Type Study

• Constructability • Initial Construction Cost • Life Cycle Maintenance Cost • Structural Considerations • Bridge Aesthetics • Context Sensitive Considerations • Environmental / Permitting

Bridge Type Selection Criteria

Page 14: North Washington Street Bridge Project

14

• Meeting with DCR and Coast Guard: Spring 2014 • City of Boston Interdepartmental Briefing Including Boston

Landmarks Commission: Summer 2014 • Charlestown Neighborhood Community Meeting: Fall of 2014 • North End Neighborhood Community Meeting: Fall of 2014 • Bicycle and Pedestrian Advocacy Groups Meeting Including Walk

Boston, Livable Streets, and MassBike: Fall of 2014 • Charlestown Preservation Society: Winter of 2015 • Stakeholders Meetings Include Marriott Hotel, Constitution

Marina, and Downtown North Association: Spring of 2015 • A Better City Transportation Committee : Spring of 2015 • Friends of City Square Park: Fall of 2015 • 25% Design Public Hearing: December 2015

History of Public Outreach

Page 15: North Washington Street Bridge Project

Form - Zakim Bridge

15

Page 16: North Washington Street Bridge Project

Form – Existing Charlestown Bridge

16

Page 17: North Washington Street Bridge Project

Form - Proposed Bridge Aerial View

17

Page 18: North Washington Street Bridge Project

Form - Proposed Bridge Elevation View

18

Page 19: North Washington Street Bridge Project

Function – Zakim Bridge

19

Page 20: North Washington Street Bridge Project

Function - Proposed Bridge

20

Livable Walkable

Green / Sustainable Multimodal

Page 21: North Washington Street Bridge Project

21

Project Limits

Project Limits

Context Plan with Proposed Bridge

Page 22: North Washington Street Bridge Project

Proposed Bridge Elevation

• Constant Depth Trapezoidal Steel Box Superstructure • Five Sets of Concrete V Piers Substructure • Main Span 190 Feet • Overall Length 1,087 Feet

22

Page 23: North Washington Street Bridge Project

23

Existing Bridge Cross Section at Approach Spans

8’ 80’ 8’

• Plate Girder Bridge • Granite Historic Piers

Page 24: North Washington Street Bridge Project

24

Existing Bridge Cross Section at Navigation Span

11’ 22’ 11’ 22’ 22’

• Swing Movable Span • Steel Truss

Page 25: North Washington Street Bridge Project

25

Proposed Bridge Cross Section at Approach Spans

12’ 12’ 7’ 7’ 54’

• Wide Sidewalks • Separated Bike Lanes • Two Vehicular Lanes in Each Direction

Page 26: North Washington Street Bridge Project

26

Proposed Bridge Cross Section at Navigation Span

21’ 21’ 7’ 7’ 54’

• Pedestrian Overlooks • Architectural Trellis and Plantings

Page 27: North Washington Street Bridge Project

Proposed Bridge Pier Detail

12’ 12’ 7’ 7’ 54’

27

Page 28: North Washington Street Bridge Project

Elevation of Architectural Trellis

28

Page 29: North Washington Street Bridge Project

Roadway and Pedestrian Lighting

Light Fixture

29

Page 30: North Washington Street Bridge Project

Pedestrian Railing

30

Page 31: North Washington Street Bridge Project

Suggested Themes for Interpretive Signage

CUSTOM HOUSE TOWER

BOSTON GARDEN

ZAKIM BRIDGE

U.S. CONSTITUTION

OLD NORTH

CHURCH

BUNKER HILL

MONUMENT

31

Page 32: North Washington Street Bridge Project

Vehicular Barrier

32

Page 33: North Washington Street Bridge Project

33

3D Visualizations

Page 34: North Washington Street Bridge Project

34

Harbor Walk View

Page 35: North Washington Street Bridge Project

35

Harbor View

Page 36: North Washington Street Bridge Project

36

Pedestrian View

Page 37: North Washington Street Bridge Project

37

Pedestrian View

Page 38: North Washington Street Bridge Project

Motorist View

38

Page 39: North Washington Street Bridge Project

39

Motorist View

Page 40: North Washington Street Bridge Project

40

Pedestrian View at Overlook

Page 41: North Washington Street Bridge Project

41

Pedestrian View at Overlook

Page 42: North Washington Street Bridge Project

42

Pedestrian View at Grade Separated Walkway

Page 43: North Washington Street Bridge Project

43

Proposed Bridge Underside View

Page 44: North Washington Street Bridge Project

Proposed Bridge Night Elevation View

44

Page 45: North Washington Street Bridge Project

Connectivity Improvements

45

Page 46: North Washington Street Bridge Project

46

CITY SQUARE PARK

PAUL REVERE PARK

City Square Intersection Improvements

46

Page 47: North Washington Street Bridge Project

Keany Square Intersection Improvements

NORTH WASHINGTON STREET

47

Page 48: North Washington Street Bridge Project

Detailed Plan at Paul Revere Landing Park

NORTH WASHINGTON STREET

48

Page 49: North Washington Street Bridge Project

Detail Plan at Grade Separated Walkway

NORTH WASHINGTON STREET

49

Page 50: North Washington Street Bridge Project

50

Grade Separated Walkway Elevation

Page 51: North Washington Street Bridge Project

Comparison Before and After Views

Before

51

Page 52: North Washington Street Bridge Project

52

After

Page 53: North Washington Street Bridge Project

53

Before

Page 54: North Washington Street Bridge Project

54

After

Page 55: North Washington Street Bridge Project

55

Before

Page 56: North Washington Street Bridge Project

56

After

Page 57: North Washington Street Bridge Project

57

• FHWA is Lead Agency • U.S. Coast Guard • U.S. Army Corps of Engineers – Individual Permit • Massachusetts Coastal Zone Management (CZM) • National Marine Fisheries Service (NMFS)/Essential Fish Habitat

Assessment (EFH)/Section 7 Consultation • FHWA - Categorical Exclusion Determination (CE Checklist) • FHWA - Section 4(f) de Minimis Impact to Park and Recreation Lands • FHWA - Section 106 National Historic Preservation Act - Coordination

with State Historic Preservation Officer and Boston Landmarks Commission

• MassDEP - Section 401 Water Quality Certification • Water Quality Data Form (WQDF)/Stormwater Management • Early Environmental Coordination Checklist (EECC)

Permitting

Page 58: North Washington Street Bridge Project

58

North Washington Street

Paul Revere Park Boston Inner Harbor

Constitution Marina Proposed Temporary Easement

Proposed Permanent Easement

Right - Of - Way Impacts

Page 59: North Washington Street Bridge Project

59

Rutherford Avenue

Paul Revere Park

Proposed Temporary Easement

Proposed Permanent Easement

Right - Of - Way Impacts

Page 60: North Washington Street Bridge Project

Existing

NORTH END CHARLESTOWN

BOSTON HARBOR Proj

ect L

imits

Construction Sequence and Traffic Impacts

60

Page 61: North Washington Street Bridge Project

Stage 1A

NORTH END CHARLESTOWN

BOSTON HARBOR Proj

ect L

imits

Construction Sequence and Traffic Impacts

61

Page 62: North Washington Street Bridge Project

Stage 1B

NORTH END CHARLESTOWN

BOSTON HARBOR Proj

ect L

imits

Construction Sequence and Traffic Impacts

62

Page 63: North Washington Street Bridge Project

Stage 1B Detour

Construction Sequence and Traffic Impacts

63

Page 64: North Washington Street Bridge Project

Stage 2

NORTH END CHARLESTOWN

BOSTON HARBOR Proj

ect L

imits

Construction Sequence and Traffic Impacts

64

Page 65: North Washington Street Bridge Project

Stage 3

NORTH END CHARLESTOWN

BOSTON HARBOR Proj

ect L

imits

Construction Sequence and Traffic Impacts

65

Page 66: North Washington Street Bridge Project

Stage 4A

NORTH END CHARLESTOWN

BOSTON HARBOR Proj

ect L

imits

Construction Sequence and Traffic Impacts

66

Page 67: North Washington Street Bridge Project

Stage 4B

NORTH END CHARLESTOWN

BOSTON HARBOR Proj

ect L

imits

Construction Sequence and Traffic Impacts

67

Page 68: North Washington Street Bridge Project

Final

NORTH END CHARLESTOWN

BOSTON HARBOR Proj

ect L

imits

Construction Sequence and Traffic Impacts

68

Page 69: North Washington Street Bridge Project

Possibility for dedicated bus lane Purpose

• Dedicated bus lane providing expedited service inbound • MBTA and shuttles

Proposed Roadway Dimensions • 57.5 foot roadway • Two 11 foot lanes • Two 10.5 foot lanes • 10.5 foot dedicated bus lane • 2 foot shoulders

69

Page 70: North Washington Street Bridge Project

• Completed Conceptual Design: Spring 2015 • Preliminary Design: Fall 2015 • Environmental Permits: 2015 to 2016 • Final Design: Winter 2016 • Anticipated Construction Activity: 2017 to 2020

Project Progress and Schedule

70

Page 71: North Washington Street Bridge Project

FAQ

71

Page 72: North Washington Street Bridge Project

72

Chief Engineer: Patricia A. Leavenworth, P.E. Project File No. 604173 MassDOT- Highway Division 10 Park Plaza Boston, MA 02116

Contact Public Outreach: Elizabeth Flanagan, Public Involvement Specialist Howard Stein Hudson [email protected] 617-482-7080

Page 73: North Washington Street Bridge Project

73

Thank you

Q & A

North Washington Street Bridge Replacement Project Boston, Massachusetts

Page 74: North Washington Street Bridge Project

74

Lovejoy Wharf

North Washington Street

Prince Street Park

Boston Inner Harbor

Proposed Temporary Easement

Proposed Permanent Easement

Right - Of - Way Impacts

Page 75: North Washington Street Bridge Project

75

North Washington Street

Boston Inner Harbor

Proposed Temporary Easement

Proposed Permanent Easement

Right - Of - Way Impacts

Page 76: North Washington Street Bridge Project

76

Boston Inner Harbor

Existing Fender System

2- Separated Channels

40’

Vertical Clearance = 22.4’ to MHW

22’

Fender System and Navigational Channel

Page 77: North Washington Street Bridge Project

77

Boston Inner Harbor

Proposed Fender System

141’-0” Proposed Navigational Channel

40’

Vertical Clearance = 22.4’ to MHW (Center 80’)

22’

Fender System and Navigational Channel