Top Banner
North Carolina CTS North Carolina CTS Committee Meeting #3 Committee Meeting #3 December 12, 2000
22

North Carolina CTS Committee Meeting #3 December 12, 2000.

Dec 20, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: North Carolina CTS Committee Meeting #3 December 12, 2000.

North Carolina CTS North Carolina CTS Committee Meeting #3Committee Meeting #3

December 12, 2000

Page 2: North Carolina CTS Committee Meeting #3 December 12, 2000.

Today’s AgendaToday’s Agenda

Introduction of Program Manager and Project Manager

Status Updates Scoping Meetings Contractor Negotiations Delivery Orders LIDAR QA/QC Surveys

Committee Bylaws

Page 3: North Carolina CTS Committee Meeting #3 December 12, 2000.

Today’s AgendaToday’s Agenda(Continued)(Continued)

Questionnaires GIS Scoping Agency Surveys

Criteria for Basin Plan Development Ideas for Real Time Flood Forecasting Issues for Discussion at Committee Meeting

#4 Action Items/Wrap Up

Page 4: North Carolina CTS Committee Meeting #3 December 12, 2000.

Introduction of Introduction of Program Manager and Program Manager and

Project ManagerProject Manager

Page 5: North Carolina CTS Committee Meeting #3 December 12, 2000.

Rodger Durham, PLSRodger Durham, PLS

Program Manager responsible for day-to-day oversight of North Carolina Statewide Flood Mapping Program

23+ years experience in surveying and mapping Most recently served as State/County

Boundary Surveyor for NCGS (919) 733-3836 [email protected]

Page 6: North Carolina CTS Committee Meeting #3 December 12, 2000.

Abdul RahmaniAbdul Rahmani

Project Manager responsible for engineering issues (hydrology, hydraulics, coastal analyses) related to North Carolina Statewide Flood Mapping Program

25+ years diverse experience at State and local level in civil engineering Most recently served as Transportion Staff

Engineer, Hydraulics Design Unit, for NCDOT (919) 250-4100 [email protected]

Page 7: North Carolina CTS Committee Meeting #3 December 12, 2000.

Scoping Meetings

Status Updates:Status Updates:

Page 8: North Carolina CTS Committee Meeting #3 December 12, 2000.

Progress on Initial Scoping Progress on Initial Scoping MeetingsMeetings

Page 9: North Carolina CTS Committee Meeting #3 December 12, 2000.

Schedule for theSchedule for theWhite Oak Basin PlanWhite Oak Basin Plan

ActivityDraft Basin Plan for ReviewBasin Plan Review MeetingFinal Scoping MeetingRFP for DO DistributedProposal Due from WCBasin Plan Finalized/DO

Issued

Date12/11/0012/13/0012/19/0012/27/0001/09/0101/16/01

Page 10: North Carolina CTS Committee Meeting #3 December 12, 2000.

Schedule for the Schedule for the Lumber Basin PlanLumber Basin Plan

ActivityDraft Basin Plan for ReviewBasin Plan Review MeetingFinal Scoping Meeting(s)RFP for DO DistributedProposal Due from ContractorBasin Plan Finalized/DO

Issued

Date12/15/0012/20/00

1/4 - 5/01

01/11/0101/20/0101/27/01

Page 11: North Carolina CTS Committee Meeting #3 December 12, 2000.

Schedule for Schedule for Remaining Basin Remaining Basin

PlansPlansBasin

Tar-Pamlico

Neuse

Cape Fear

Pasquotank

Draft Date

Early Jan.

Mid-Jan.

Mid-Jan.

Late Jan.

Final Date

Early Feb.

Mid-Feb.

Mid-Feb.

Late Feb.

Page 12: North Carolina CTS Committee Meeting #3 December 12, 2000.

Status UpdatesStatus Updates

Scoping meetings- Gavin Smith Contractor negotiations-John

Dorman Delivery Orders

IT- Tim Johnson LIDAR- Gary Thompson

LIDAR QA/QC Surveys- Gary Thompson

Page 13: North Carolina CTS Committee Meeting #3 December 12, 2000.

Committee BylawsCommittee Bylaws

Comments received since the 11/14 meeting have been incorporated

Revised version is in your packet

Page 14: North Carolina CTS Committee Meeting #3 December 12, 2000.

GIS Data Availability Survey CTS Committee Questionnaire

QuestionnairesQuestionnaires

Page 15: North Carolina CTS Committee Meeting #3 December 12, 2000.

GIS Data Availability GIS Data Availability SurveySurvey

Administered by CGIA as part of initial scoping

Inventory to identify local GIS base map resources

Currently compiling results and developing database

Copy of survey form in your package

Page 16: North Carolina CTS Committee Meeting #3 December 12, 2000.

CTS Committee CTS Committee QuestionnaireQuestionnaire

Survey handed out at last meeting If you have not yet submitted the

survey, please do so Submit to John Dorman Copy in your package

Page 17: North Carolina CTS Committee Meeting #3 December 12, 2000.

Criteria for Basin Criteria for Basin Plan DevelopmentPlan Development

See draft document in your package “Selecting Technical Methods and Assigning Scores”

As discussed at CTS Committee Meeting # 2, there are 5 options for selecting technical methods:1. Riverine detailed study

2. Coastal detailed study

3. Redelineation

4. Approximate riverine study

5. Use of effective information

Page 18: North Carolina CTS Committee Meeting #3 December 12, 2000.

Criteria for Basin Criteria for Basin Plan DevelopmentPlan Development

Selection of technical method based on: Current zone designation on FIRM Existing and anticipated development How flooding experience compares with

FIRMs Adequacy/currency of study methods

used to prepare FIRM See Tables 1 and 2 in document

Page 19: North Carolina CTS Committee Meeting #3 December 12, 2000.

Criteria for Basin Criteria for Basin Plan DevelopmentPlan Development

Scoring system to prioritize. Points assigned based on: Age of effective analysis/FIRMs Likely mapping impacts Level of development Historical Flooding Information Contiguous mismatches with adjacent communities Community-identified needs Community Mitigation Planning

See Table 3 in document

Page 20: North Carolina CTS Committee Meeting #3 December 12, 2000.

State Perspective-Gavin Smith, NCDEM

NOAA Perspective-Glenn Austin, NWS

USGS Perspective-Jerad Bales, USGS

Open Discussion

Ideas for Real Time Ideas for Real Time Flood ForecastingFlood Forecasting

Page 21: North Carolina CTS Committee Meeting #3 December 12, 2000.

Issues for Discussion at Issues for Discussion at CTS CTS

Committee Meeting #4Committee Meeting #4 Scheduled for January 16,

2001

Page 22: North Carolina CTS Committee Meeting #3 December 12, 2000.

Action Items/Wrap UpAction Items/Wrap Up