Title: Power Quality of Emergency Stand-by Systems Presenter: David Vennie and Ed Moseley Company: Caterpillar Inc. and Holt CAT Date: October 25 th , 2009 2009 North American Power Quality Interest Group Workshop
18

North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

Jul 09, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

Title: Power Quality of Emergency Stand-by Systems

Presenter: David Vennie and Ed MoseleyCompany: Caterpillar Inc. and Holt CATDate: October 25th, 2009

2009 North American Power Quality Interest Group Workshop

Page 2: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

2 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Agenda

• Understanding your Stand-By Power Needs

• Sizing the Appropriate Stand-By Power System

• Developing a complete Systems Solution

• Appropriate Maintenance of the Equipment

Page 3: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

3 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Basic Power Quality Problems

Power failure

Voltage sag

Voltage surge

Undervoltage

Overvoltage

Line noise

Frequency variation

Switching transients

Harmonic distortion

Page 4: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

4 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Understanding Your Stand-By Power Needs

• Is Power Quality an Issue? • Can you afford to lose ALL Power for 10 seconds?• Do you need to back up the entire system?• Do you have Critical Loads?• Are you looking into Load Management or Peak Shaving?• Do you need to parallel to utility?• Do you need Multiple Units?

Page 5: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

5 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

• Load Profile • Necessary Loads• Load Steps • Load Types on the System

– Does the facility have equipment requiring specific voltage and frequency limitations?

• Sizing Software

Sizing the Appropriate Back Up System

Page 6: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

6 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Load Profile

• What does your Load Profile look like?

Page 7: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

7 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Necessary Loads

• Is it necessary to back up the entire facility? • Can you split your loads up? • Do you have critical loads vs. non-critical loads?

Page 8: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

8 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Load Steps

• Load Stepping – Prioritization – Reduces Transients – Load Shedding Scheme

• Multi-Unit Timing – First to Rated

• First Load Step• Parallel • Second Load Step

– First to Rated • Parallel • One Large Load Step

Page 9: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

9 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Load Types

• Motors – DC motors, VFD’s, AC Motors, etc

• Lighting• UPS• Office Equipment• Machining Equipment

Page 10: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

10 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Sizing Software – load types and steps

Page 11: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

11 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Sizing Software - Generator Selection

Page 12: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

12 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Complete Systems Solution

• Generator Set • Automatic Transfer Switch • Switchgear• Uninterruptable Power Supply

(UPS) • Communications• Multi-Generator Solutions

Page 13: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

13 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Automatic Transfer Switch (ATS)

• Open / Closed Transition • Delayed Transition • Bypass Isolation • Service Entrance Rated • Low & Medium Voltage

Page 14: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

14 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Switchgear – Reliability

Redundant Ethernet

Remote Communications

ModBus

Generator 1 Generator 2 Generator 3

EMCP 3.S/3.SGGenerator Dead Bus

Load Shed/Load Add

Generator Demand Priority

Generator Setpoint Management

System Setpoint Management

System Measurements and Alarms

EMCP 3.S/3.SGEngine Control

Breaker ControlGen Power Measurement

Synchronization

Engine Protection

Generator ProtectionVoltage Control

Frequency Control

kW and kVAR Sharing Power Factor Control

EGP MASTER 3.S (EGP)Single or

Redundant Ethernet I/O

BECAUSE ANY CONTROLLER CAN BE THEMASTER, THE CONTROL SYSTEM WILL ALWAYS HAVE A MASTER CONTROLLER

EMCP 3.S (EGP)Breaker Control

Gen Power MeasurementSynchronization

Engine ProtectionGenerator Protection

Voltage ControlFrequency Control

kW and kVAR Sharing

Power Factor Control

EMCP 3.S/3.SGGenerator Dead Bus

Load Shed/Load Add

Generator Demand Priority

Generator Setpoint Management

System Setpoint Management

EMCP 3.S/3.SGEngine Control

Breaker ControlGen Power Measurement

Synchronization

Engine Protection

Generator ProtectionVoltage Control

Frequency Control

kW and kVAR Sharing Power Factor Control

EGP MASTER 3.S (EGP)

System Measurements and Alarms

EMCP 3.S (EGP)Breaker Control

Gen Power MeasurementSynchronization

Engine ProtectionGenerator Protection

Voltage ControlFrequency Control

kW and kVAR Sharing

Power Factor Control

Touch screen

ATS

Page 15: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

15 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Uninterruptable Power Supply (UPS)

Flywheel UPSBattery UPS

Page 16: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

16 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Multi-Generator Solutions

• When to Use Multiple Generators– Redundancy – Significant Load Variation

• Synchronization– Frequency– Voltage – Phase

• Load Control – Acceptance/Shedding Order– Unit Starting Stopping Order– Unit Synchronization Order

Page 17: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

17 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Completely Integrated Communications System

Redundant Ethernet

Single or Redundant Ethernet I/O

ModBus

Remote Monitoring Software

EMCP 3.S Utility / Tie

Breaker Control

ATS UPS

ModBus

EMCP 3.S Generator Paralleling

Control

Switchgear Touchscreen

Switchgear Touchscreen

Processor

Annunciator Genset Temperature Monitoring

Voltage Regulator

ADEM IV Engine Controller

EMCP 3

Generator Set Controller

Discrete I/O Module

Page 18: North American Power Quality Interest Group Workshop 2009 ...mydocs.epri.com/docs/PublicMeetingMaterials/0910/5... · Power Factor Control EMCP 3S3S.G./ Generator Dead Bus Load Shed/Load

18 Copyright © 2009 Electric Power Research Institute, Inc. All rights reserved. PQIG 2009

Appropriate Maintenance of Equipment

• Guarantee Reliable Power/ Quality is always there– Generator is the only line of defense when your facility loses

power– A Scheduled Maintenance Program will ensure reliability

• Checking/ Changing Filters– Fuel/ Air/ Oil – Scheduled Fluid Change

• Load Capability – Exercise 30% Nameplate Rating monthly

• ATS Maintenance – Clean and test functionality of components