Norfolk Boreas Examination Library Updated – 28 May 2020 This Examination Library relates to the Norfolk Boreas application. The library lists each document that has been submitted to the examination by any party and documents that have been issued by the Planning Inspectorate. All documents listed have been published to the National Infrastructure’s Planning website and a hyperlink is provided for each document. A unique reference is given to each document; these references will be used within the Report on the Implications for European Sites and will be used in the Examining Authority’s Recommendation Report. The documents within the library are categorised either by document type or by the deadline to which they are submitted. Please note the following: • This is a working document and will be updated periodically as the examination progresses. • Advice under Section 51 of the Planning Act 2008 that has been issued by the Inspectorate, is published to the National Infrastructure Website but is not included within the Examination Library as such advice is not an examination document. • This document contains references to documents from the point the application was submitted. • The order of documents within each sub-section is either chronological, numerical, or alphabetical and confers no priority or higher status on those that have been listed first.
104
Embed
Norfolk Boreas Examination Library Updated – 26 …...1.1 Cover Letter to the Planning Inspectorate APP-002 Norfolk Boreas Li mited 1.2 Application Form APP-003 Norfolk Boreas Limited
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Norfolk Boreas Examination Library
Updated – 28 May 2020
This Examination Library relates to the Norfolk Boreas application. The library lists each document that has been submitted to the examination by any party and documents that have been issued by the Planning Inspectorate. All documents listed have been published to the National Infrastructure’s Planning website and a hyperlink is provided for each document. A unique reference is given to each document; these references will be used within the Report on the Implications for European Sites and will be used in the Examining Authority’s Recommendation Report. The documents within the library are categorised either by document type or by the deadline to which they are submitted.
Please note the following:
• This is a working document and will be updated periodically as the examination progresses.
• Advice under Section 51 of the Planning Act 2008 that has been issued by the Inspectorate, is published to the National Infrastructure Website but is not included within the Examination Library as such advice is not an examination document.
• This document contains references to documents from the point the application was submitted.
• The order of documents within each sub-section is either chronological, numerical, or alphabetical and confers no priority or higher status on those that have been listed first.
Document Index
EN010087 – Norfolk Boreas Examination Library - Index Category
Reference
Application Documents As submitted and amended version received before the PM. Any amended version received during the Examination stage to be saved under the Deadline received
APP-xxx
Adequacy of Consultation responses
AoC-xxx
Relevant Representations
RR-xxx
Procedural Decisions and Notifications from the Examining Authority Includes Examining Authority’s questions, s55, and post acceptance s51
PD-xxx
Additional Submissions Includes anything accepted at the Preliminary Meeting and correspondence that is either relevant to a procedural decision or contains factual information pertaining to the examination
AS-xxx
Events and Hearings Includes agendas for hearings and site inspections, audio recordings, responses to notifications, applicant’s hearing notices, and responses to Rule 6 and Rule 8 letters
EV-xxx
Representations – by Deadline
Deadline 1: State what type of submissions was requested for this deadline in the heading Includes R17 responses
REP1-xxx
Deadline 2: REP2-xxx
Document Index
State what type of submissions was requested for this deadline in the heading Includes R17 responses Deadline 3:
REP3-xxx
Deadline 4:
REP4-xxx
Deadline 5: REP5-xxx
Deadline 6:
REP6-xxx
Deadline 7:
REP7-xxx
Deadline 8:
REP8-xxx
Deadline 9:
REP9-xxx
Deadline 10:
REP10-xxx
Deadline 11:
REP11-xxx
Deadline 12:
REP12-xxx
Other Documents Includes s127/131/138 information, s56, s58 and s59 certificates, and transboundary documents
APP-134 Norfolk Boreas Limited 5.1.16.1 Consultation Report Appendix 16.01 - Example of LLO information submitted to Parish Councils and local education
APP-135 Norfolk Boreas Limited 5.1.18.1 Consultation Report Appendix 18.01 - Norfolk Vanguard Statement of Community Consultation (SoCC)
APP-144 Norfolk Boreas Limited 5.1.21.3 Consultation Report Appendix 21.03 - Follow-up letter to landowners
APP-145 Norfolk Boreas Limited 5.1.21.4 Consultation Report Appendix 21.04 - Land referencing site notice
APP-146 Norfolk Boreas Limited 5.1.21.5 Consultation Report Appendix 21.05 - 26th October 2018 section 44 letter to land interests
APP-147 Norfolk Boreas Limited 5.1.21.6 Consultation Report Appendix 21.06 - 26th October 2018 section 44 letter to substation consultees
APP-148 Norfolk Boreas Limited 5.1.21.7 Consultation Report Appendix 21.07 - 26th October 2018 section 44 letter bespoke route changes
APP-149 Norfolk Boreas Limited 5.1.21.8 Consultation Report Appendix 21.08 - 26th October 2018 section 44 letter to red line boundary change request consultees
APP-150 Norfolk Boreas Limited 5.1.21.9 Consultation Report Appendix 21.09 - 9th April 2019 letter to newly identified landowners
APP-151 Norfolk Boreas Limited 5.1.21.10 Consultation Report Appendix 21.10 - 26th April 2019 letter to a newly identified landowner
APP-152 Norfolk Boreas Limited 5.1.21.11 Consultation Report Appendix 21.11 - 25th October 2018 notification letter to the Planning Inspectorate
APP-153 Norfolk Boreas Limited 5.1.21.12 Consultation Report Appendix 21.12 - Acknowledgement of receipt of 25th October 2018 notification letter from the Planning Inspectorate
APP-154 Norfolk Boreas Limited 5.1.21.13 Consultation Report Appendix 21.13 - 26th October 2018 section 42 letter
APP-155 Norfolk Boreas Limited 5.1.21.14 Consultation Report Appendix 21.14 - Section 42 letter proof of postage
APP-156 Norfolk Boreas Limited 5.1.21.15 Consultation Report Appendix 21.15 - Example email to section 42 consultees
5.1.21.16 Consultation Report Appendix 21.16 - Letter to BBL Technical Limited
APP-158 Norfolk Boreas Limited 5.1.21.17 Consultation Report Appendix 21.17 - Letter to Oranje Nassau Energie
APP-159 Norfolk Boreas Limited 5.1.21.18 Consultation Report Appendix 21.18 - Letter to West Suffolk Council
APP-160 Norfolk Boreas Limited 5.1.22.1 Consultation Report Appendix 22.01 - Draft Statement of Community Consultation (SoCC), cover letter and list of hard to reach groups to relevant section 43 authorities
APP-161 Norfolk Boreas Limited 5.1.22.2 Consultation Report Appendix 22.02 - Statement of Community Consultation (SoCC)
APP-162 Norfolk Boreas Limited 5.1.22.3 Consultation Report Appendix 22.03 - Eastern Daily Press Statement of Community Consultation (SoCC) advert
APP-163 Norfolk Boreas Limited 5.1.22.4 Consultation Report Appendix 22.04 - Proof of delivery of Statement of Community Consultation (SoCC) to deposit locations
APP-164 Norfolk Boreas Limited 5.1.22.5 Consultation Report Appendix 22.05 - Statement of Community Consultation (SoCC) stakeholder mailing list
APP-165 Norfolk Boreas Limited 5.1.22.6 Consultation Report Appendix 22.06 - Statement of Community Consultation (SoCC) email
APP-166 Norfolk Boreas Limited 5.1.22.7 Consultation Report Appendix 22.07 - Refined Primary Consultation Zone mailing area
APP-273 Norfolk Boreas Limited 6.2.8.3 Environmental Statement - Figure 8.3 Bathymetry of the Norfolk Boreas offshore cable corridor
APP-274 Norfolk Boreas Limited 6.2.8.4 Environmental Statement - Figure 8.4 Bathymetry of the project interconnector search area
APP-275 Norfolk Boreas Limited 6.2.8.5 Environmental Statement - Figure 8.5 Position of the amphidromic point and co-tidal lines relative to the position of Norfolk Boreas
APP-278 Norfolk Boreas Limited 6.2.8.8 Environmental Statement - Figure 8.8 Location of seabed sediment samples within the Norfolk Boreas site and project interconnector cable search area
APP-279 Norfolk Boreas Limited 6.2.8.9 Environmental Statement - Figure 8.9 Location of seabed sediment samples along the offshore cable corridor
APP-280 Norfolk Boreas Limited 6.2.8.10 Environmental Statement - Figure 8.10 Regional sediment transport pathways in the vicinity of Norfolk Boreas (Kenyon and Cooper, 2005)
APP-282 Norfolk Boreas Limited 6.2.8.12 Environmental Statement - Figure 8.12 Location of sand waves along the Norfolk Boreas offshore cable corridor
APP-283 Norfolk Boreas Limited 6.2.8.13 Environmental Statement - Figure 8.13 Zones of potential influence in the tidal regime for the Norfolk Boreas site
APP-284 Norfolk Boreas Limited 6.2.8.14 Environmental Statement - Figure 8.14 Zones of potential influence on the wave regime for Norfolk Boreas site
APP-285 Norfolk Boreas Limited 6.2.8.15 Environmental Statement - Figure 8.15 Zones of potential influence in the tidal regimes for Norfolk Boreas, Norfolk Vanguard and East Anglia THREE
APP-286 Norfolk Boreas Limited 6.2.8.16 Environmental Statement - Figure 8.16 Zones of potential influence on the wave regime for Norfolk Boreas, Norfolk Vanguard and East Anglia THREE
APP-287 Norfolk Boreas Limited 6.2.8.17 Environmental Statement - Figure 8.17 Zones of potential influence of the combined wave and tide regimes for Norfolk Boreas, Norfolk Vanguard and East Anglia THREE
APP-288 Norfolk Boreas Limited 6.2.9.1 Environmental Statement - Figure 9.1 Offshore Cable Corridor and landfall area against WFD water bodies and designated bathing waters
APP-318 Norfolk Boreas Limited 6.2.11.16 Environmental Statement - Figure 11.16 Danish VMS Effort (days) for Sandeel Average 2011 - 2015
APP-319 Norfolk Boreas Limited 6.2.11.17 Environmental Statement - Figure 11.17 ICES Sandeel Assessment Areas in the North Sea (1-2) and the Sandeel Habitat Areas and locations of Fishing Grounds Described by Jensen et al (2011)
APP-320 Norfolk Boreas Limited 6.2.11.18 Environmental Statement - Figure 11.18 IHLS Herring Small Larvae Abundance (2007-2010) and Herring Spawning Intensity
6.2.11.24 Environmental Statement - Figure 11.24 Mackerel Spawning Grounds and nursery Grounds in Relation to Monopile Noise Impact Contours (5000KJ)
APP-327 Norfolk Boreas Limited 6.2.11.25 Environmental Statement - Figure 11.25 Sandeel Spawning Grounds and Nursery Grounds in Relation to Monopile Noise Impact Contours (5000KJ)
APP-328 Norfolk Boreas Limited 6.2.11.26 Environmental Statement - Figure 11.26 Cod Spawning Grounds and Nursery Grounds in Relation to Monopile Noise impact Contours (5000KJ)
APP-329 Norfolk Boreas Limited 6.2.11.27 Environmental Statement - Figure 11.27 Whiting Spawning Grounds and Nursery Grounds in Relation to Monopile Noise Impact Contours
APP-330 Norfolk Boreas Limited 6.2.11.28 Environmental Statement - Figure 11.28 Sprat Spawning Grounds and Nursery Grounds in Relation to Monopile Noise Impact Contours (5000KJ)
APP-331 Norfolk Boreas Limited 6.2.11.29 Environmental Statement - Figure 11.29 Herring Spawning Grounds and Nursery Grounds in Relation to Monopile Noise Impact Contours (5000KJ)
APP-332 Norfolk Boreas Limited 6.2.11.30 Environmental Statement - Figure 11.30 Tope and Thornback Ray Spawning Grounds and nursery Grounds in Relation to Monopile Noise Impact Contours (5000KJ)
APP-333 Norfolk Boreas Limited 6.2.12.1 Environmental Statement - Figure 12.1 Southern North Sea SAC for harbour porpoise
APP-334 Norfolk Boreas Limited 6.2.12.2 Environmental Statement - Figure 12.2 Mean grey seal at-sea around Norfolk Boreas offshore project area
APP-335 Norfolk Boreas Limited 6.2.12.3 Environmental Statement - Figure 12.3 Mean harbour seal at-sea usage around Norfolk Boreas offshore project area
APP-336 Norfolk Boreas Limited 6.2.12.4 Environmental Statement - Grey and harbour seal haul-out sites around Norfolk Boreas offshore project area
APP-337 Norfolk Boreas Limited 6.2.12.5 Environmental Statement Figure 12.5 Harbour porpoise PTS ranges based on worst case scenario
APP-338 Norfolk Boreas Limited 6.2.12.6 Environmental Statement - Figure 12.6 Harbour porpoise TTS and disturbance range based on worst case scenarios
APP-339 Norfolk Boreas Limited 6.2.12.7 Environmental Statement - Figure 12.7 Grey and harbour seal PTS, TTS and disturbance ranges based on worst case scenarios
APP-374 Norfolk Boreas Limited 6.2.14.30 Environmental Statement - Figure 14.30 UK VMS Value (£) Otter Twin Trawl¹ Average 2012-2016
APP-375 Norfolk Boreas Limited 6.2.14.31 Environmental Statement - Figure 14.31 UK VMS Effort (Hours) Otter Twin Trawl¹ Average 2012-2016
APP-376 Norfolk Boreas Limited 6.2.14.32 Environmental Statement - Figure 14.32 French VMS (hours fished) by Bottom and Pelagic Trawls, 2008
APP-377 Norfolk Boreas Limited 6.2.14.33 Environmental Statement - Figure 14.33 French VMS Effort (hours fished) by Bottom Otter Trawls, 2008
APP-378 Norfolk Boreas Limited 6.2.14.34 Environmental Statement - Figure 14.34 French Fishing Effort (days) by Over 18m Vessels Using Bottom Otter Trawls in 2014
APP-379 Norfolk Boreas Limited 6.2.14.35 Environmental Statement - Figure 14.35 French Fishing Effort (days) Over18m Using Pelagic Trawls in 2014
APP-382 Norfolk Boreas Limited 6.2.14.38 Environmental Statement - Figure 14.38 German Fishing Density (No. Vessel)¹ Average 2011-2015
APP-383 Norfolk Boreas Limited 6.2.14.39 Environmental Statement - Figure 14.39 Locations of Other Projects/Activities included in the Cumulative Assessment
APP-384 Norfolk Boreas Limited 6.2.14.40 Environmental Statement - Figure 14.40 Locations of Other Projects /Activities included in the Cumulative Assessment with Dutch VMS Value (€) Be am Trawls
APP-385 Norfolk Boreas Limited 6.2.14.41 Environmental Statement - Figure 14.41 Locations of Other Projects/Activities included in the Cumulative Assessment with Annual Average Dutch VMS Effort (Days) Beam Trawls (2013-2017)
APP-386 Norfolk Boreas Limited 6.2.14.42 Environmental Statement - Figure 14.42 Locations of Other Projects /Activities included in the Cumulative Assessment with Annual Average Dutch VMS Value (€) Seine Nets (2013-2017)
APP-387 Norfolk Boreas Limited 6.2.14.43 Environmental Statement - Figure 14.43 Locations of Other Projects/Activities included in the Cumulative Assessment with Annual Average Dutch VMS Effort (Days) Seine Nets (2013-2017)
6.2.14.44 Environmental Statement - Figure 14.44 Locations of O the r Projects /Activities included in the Cumulative Assessment with Annual Average Belgian VMS Value (€) Be am Trawl (2010-2014)
APP-389 Norfolk Boreas Limited 6.2.14.45 Environmental Statement - Figure 14.45 Locations of Other Projects/Activities included in the Cumulative Assessment with Annual Average Belgian VMS Effort (Days) Beam Trawl (2010-2014)
APP-390 Norfolk Boreas Limited 6.2.14.46 Environmental Statement - Figure 14.46 Locations of Other Projects/Activities included in the Cumulative Assessment with Annual Average UK VMS Value (£) Beam Trawl (2012-2016)
APP-391 Norfolk Boreas Limited 6.2.14.47 Environmental Statement - Figure 14.47 Locations of Other Projects/Activities included in the Cumulative Assessment with Annual Average UK VMS Effort (Hours) Beam Trawl (2012-2016)
APP-392 Norfolk Boreas Limited 6.2.14.48 Environmental Statement - Figure 14.48 Locations of Other Projects/Activities included in the Cumulative Assessment with Bottom and Pelagic Trawls 2008 Fishing time (hours) per 10' by 10' Rectangles
APP-393 Norfolk Boreas Limited 6.2.14.49 Environmental Statement - Figure 14.49 Locations of Other Projects/Activities included in the Cumulative Assessment with Bottom Otter Trawls 2008 Fishing time (hours) per 10' by 10' Rectangles
APP-394 Norfolk Boreas Limited 6.2.14.50 Environmental Statement - Figure 14.50 Locations of Other Projects/Activities included in the Cumulative Assessment with French Fishing Effort (days) by Over 18m Vessels Using Bottom Otter Trawls in 2014(5)
APP-395 Norfolk Boreas Limited 6.2.14.51 Environmental Statement - Figure 14.51 Locations of Other Projects/Activities included in the Cumulative Assessment with French Fishing Effort (days) Over 18m Using Pelagic Trawls in 2014(5)
APP-396 Norfolk Boreas Limited 6.2.15.1 Environmental Statement - Figure 15.1 Study Areas
APP-406 Norfolk Boreas Limited 6.2.16.2 Environmental Statement - Figure 16.2 HMR and Oil and Gas Platforms in in the vicinity to Norfolk Boreas
APP-407 Norfolk Boreas Limited 6.2.17.1 Environmental Statement - Figure 17.1 Study Area
APP-408 Norfolk Boreas Limited 6.2.17.2 Environmental Statement - Figure 17.2 Palaeogeographic features of archaeological potential in the Norfolk Boreas site
APP-409 Norfolk Boreas Limited 6.2.17.3 Environmental Statement - Figure 17.3 Palaeogeographic features of archaeological potential in the Offshore cable corridor and Project interconnector search area (Maps 1 to 4)
APP-410 Norfolk Boreas Limited 6.2.17.4 Environmental Statement - Figure 17.4 Seabed features of archaeological potential in the Norfolk Boreas site
APP-411 Norfolk Boreas Limited 6.2.17.5 Environmental Statement - Figure 17.5 Seabed features of archaeological potential in the Offshore cable corridor and Project interconnector search area (Maps 1 to 4)
APP-471 Norfolk Boreas Limited 6.2.26.1 Environmental Statement - Figure 26.1 Road links considered in the air quality assessment under Scenario 2
APP-472 Norfolk Boreas Limited 6.2.26.2 Environmental Statement - Figure 26.2 Sensitive human receptor locations considered in the air quality assessment under Scenario 2
APP-473 Norfolk Boreas Limited 6.2.26.3 Environmental Statement - Figure 26.3 Road links considered in the air quality assessment under Scenario 1
APP-474 Norfolk Boreas Limited 6.2.26.4 Environmental Statement - Figure 26.4 Sensitive human receptor locations considered in the air quality assessment under Scenario 1
APP-483 Norfolk Boreas Limited 6.2.28.7 Environment Statement - Figure 28.7 Archaeological Interpretation of Geophysical Survey Data across the Norfolk Boreas onshore project area
APP-484 Norfolk Boreas Limited 6.2.29.1 Environmental Statement - Figure 29.1 Scenario 1 - Study Area
APP-485 Norfolk Boreas Limited 6.2.29.2 Environmental Statement - Figure 29.2 Scenario 1 - Landscape Designations and Landscape Character Areas (Map 1 of 9)
APP-683 Norfolk Boreas Limited 6.3.32.1 Environmental Statement - Appendix 32.1 Offshore CIA and Transboundary Impact Consultation
APP-684 Norfolk Boreas Limited 6.3.32.2 Environmental Statement - Appendix 32.2 Plans and Projects included in the Offshore CIA and Transboundary Assessments
APP-685 Norfolk Boreas Limited 6.3.33.1 Environmental Statement - Appendix 33.1 Plans and Projects included in the Onshore CIA
APP-686 Norfolk Boreas Limited 6.4 Environmental Statement Non Technical Summary - Non-Technical Summary provides a lay persons' summary to the Environmental Statement
APP-687 Norfolk Boreas Limited 6.5 Scoping Opinion as given by the Secretary of State in June 2017
APP-688 Norfolk Boreas Limited 6.6 Schedule of Mitigation
APP-689 Norfolk Boreas Limited 6.7 EIA and DCO Reconciliation Document
Adequacy of Consultation Responses AoC-001 Borough Council of King's Lynn and West Norfolk AoC-002 Broadland District Council AoC-003 Great Yarmouth Borough Council AoC-004 Norfolk County Council AoC-005 North Norfolk District Council AoC-006 Norwich City Council AoC-007 South Norfolk Council AoC-008 Suffolk County Council Relevant Representations RR-001 Borough Council of Kings Lynn and West Norfolk RR-002 Corporation of Trinity House RR-003 NATS Safeguarding Office RR-004 Penelope Malby RR-005 The Coal Authority RR-006 Jenny Smedley RR-007 Maritime and Coastguard Agency RR-008 National Federation of Fisherman’s Organisations RR-009 Brown and Co on behalf of Necton Farms Ltd RR-010 East of England Energy Group (EERGR) (East of England Energy
Group (EEEGR)) RR-011 Brian Schuil RR-012 Mrs G Watson RR-013 Alice Spain RR-014 Necton Substation Action Group RR-015 Rijskwaterstaat RR-016 Cawston Parish Council RR-017 Oulton Parish Council RR-018 Polly Brockis RR-019 The Monk Family RR-020 N2RS (No to Relay Stations) (N2RS (No to Relay Stations)) RR-021 Public Health England RR-022 Historic England RR-023 Helen Savage RR-024 Cadent Gas Limited RR-025 Highways England RR-026 Vanessa Long
RR-027 Alison Shaw RR-028 Broadland District Council RR-029 Tony Barnett RR-030 UK Chamber of Shipping RR-031 Diana Lockwood RR-032 Steffan Aquarone RR-033 Clive Searson RR-034 Corpusty and Saxthorpe Parish Council RR-035 Eastern Inshore Fisheries and Conservation Authority RR-036 Jan Burley RR-037 Norfolk County Council RR-038 Paul King RR-039 Norma Albinson RR-040 The Wildlife Trusts RR-041 East Ruston Parish Council RR-042 George Freeman MP RR-043 James Smith RR-044 National Farmers Union RR-045 The Crown Estate RR-046 CPRE Norfolk RR-047 Glenn Berry RR-048 Happisburgh Parish Council RR-049 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr Charles Sayer RR-050 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr Cubit Siely RR-051 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mrs C B Hart RR-052 National Grid Electricity Transmission & National Grid Gas RR-053 Peter Soldan RR-054 RSPB RR-055 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Thomas Love RR-056 Whale and Dolphin Conservation RR-057 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Albanwise Ltd RR-058 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Bradenham Hall
Farms RR-059 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Church Farm
(Gimingham) Ltd (Church Farm (Gimingham) Ltd) RR-060 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Diocese of Norwich RR-061 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Dr G Cubitt RR-062 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of E H Wenn
(Happisburgh) Ltd (E H Wenn (Happisburgh) Ltd) RR-063 Eni UK Limited RR-064 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Farnham Farms Ltd RR-065 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of G F de Feyter &
Partners RR-066 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of HBSH Pension
Scheme RR-067 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Heydon Estate RR-068 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of L Padulli RR-069 Marine Management Organisation RR-070 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr & Mrs M Jones RR-071 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr G Anderson
RR-072 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr G Hales RR-073 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr J Carrick RR-074 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr Kyle White RR-075 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr M and Mrs J
Ditch RR-076 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr M Howell RR-077 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr P Bunting RR-078 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr P Mutimer RR-079 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mr R Baldwin RR-080 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mrs A Green RR-081 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mrs A Jones RR-082 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mrs P Hinton RR-083 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of National Trust RR-084 National Trust RR-085 Royal Yachting Association RR-086 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Trustees of Salle
Park Trust RR-087 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Trustees of Stinton
Hall Trust RR-088 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Trustees of WM &
SJ Bulwer Long 1983 Settlement RR-089 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of William Youngs &
Son (Farms) Ltd (William Youngs & Son (Farms) Ltd) RR-090 Anglian Water Services Ltd RR-091 Caister Inshore Fishermans Association RR-092 Bidwells on behalf of Christopher S Wright RR-093 Cruso & Wilkin on behalf of David Perry Warnes RR-094 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Ditch Household RR-095 Environment Agency RR-096 Equinor UK Ltd RR-097 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Jones Household RR-098 Savills (UK) Ltd (Savills (UK) Ltd) on behalf of Mrs P Riches RR-099 Natural England RR-100 Addleshaw Goddard LLP on behalf of Network Rail Infrastructure
Limited RR-101 North Norfolk District Council RR-102 Orsted RR-103 Patricia Lockwood RR-104 Water Management Alliance (Internal Drainage Board) (Water
Management Alliance (Internal Drainage Board) RR-105 Nichola Banham RR-106 Andrew Lockwood RR-107 WS Atkins International Ltd. On behalf of BBL Company VOF RR-108 Clan Farm Ltd RR-109 Colin King RR-110 Great Yarmouth Borough Council RR-111 Lucy Sheringham RR-112 Paul Haddow RR-113 VisNed Procedural Decisions and Notifications from the Examining Authority
PD-001 Notification of Decision to Accept Application PD-002 Section 51 advice to the Applicant PD-003 Section 55 Checklist PD-004 Appointment of the Examining Authority PD-005 Notification of Amendment to Panel Membership PD-006 Rule 6 letter - Notification of the preliminary meeting and matters
to be discussed PD-007 Rule 8 – notification of timetable for the examination PD-008 Written Questions PD-009 The Examining Authority’s Further Written Questions and
Requests for information (ExQ2) PD-010 Notification of hearings and Accompanied Site Inspection -
January 2020 PD-011 Notification of hearings and Accompanied Site Inspection - March
2020 PD-012 Rule 17 - Request for Further Information PD-013 Rule 8(3) change to the Examination Timetable PD-014 The Examining Authority's third round of Written Questions PD-015 Rule 17 and Rule 8(3) - Request for information and change to
the timetable PD-016 The Examining Authority's Fourth Round of Written Questions and
Requests for Information PD-017 Rule 8 (3) and Rule 17
Notification of a new deadline for completion of Examination, variation to the Examination Timetable and request for information
Assessment - Integrity Matrices Version 2 - Accepted at the discretion of the Examining Authority
AS-006 Norfolk Boreas Limited Additional Submission- Response to Section 51 Advice - Land Plans Part 1 - Accepted at the discretion of the Examining Authority
AS-007 Norfolk Boreas Limited Additional Submission - Response to Section 51 Advice - Land Plans Part 2 - Accepted at the discretion of the Examining Authority
AS-008 Norfolk Boreas Limited Additional Submission - Response to Section 51 Advice - Land Plans Part 3 - Accepted at the discretion of the Examining Authority
AS-009 Norfolk Boreas Limited Additional Submission - Response to Section 51 Advice - Land Plans Part 4 - Accepted at the discretion of the Examining Authority
AS-010 Norfolk Boreas Limited Additional Submission - Response to Section 51 Advice - Land Plans Part 5 - Accepted at the discretion of the Examining Authority
AS-011 Norfolk Boreas Limited Additional Submission - Response to Section 51 Advice - Special Category Land Plans - Accepted at the discretion of the Examining Authority
AS-012 Norman Lamb MP Additional Submission - Accepted at the discretion of the Examining Authority
AS-013 Ministry of Defence Additional Submission - Accepted at the discretion of the Examining Authority
AS-014 Julian Pearson Additional Submission - Accepted at the discretion of the Examining Authority
AS-015 Mr Geoffrey Vout Additional Submission - Accepted at the discretion of the Examining Authority
AS-016 Greg Peck Additional Submission - Accepted at the discretion of the Examining Authority
AS-017 Norfolk Boreas Limited Additional Submissions - Applicant's Response to the Rule 6 Letter and Cover Letter for Annex F Documents - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-018 Norfolk Boreas Limited Additional Submissions - Applicant's guide to the Application (Revision 2) - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
Additional Submissions - Updated draft DCO (Revision 2) (Clean) - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-020 Norfolk Boreas Limited Additional Submissions - Updated draft DCO (Revision 2) (Tracked Changes) - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-021 Norfolk Boreas Limited Additional Submissions - Applicant's Updated draft DCO Schedule of Changes - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-022 Norfolk Boreas Limited Additional Submissions - Explanatory Memorandum (Revision 2) (Clean) - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-023 Norfolk Boreas Limited Additional Submissions - Explanatory Memorandum (Revision 2) (Tracked Changes) - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-024 Norfolk Boreas Limited Additional Submissions - Comments on Relevant Representations - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-025 Norfolk Boreas Limited Additional Submissions - Comments on Relevant Representations Appendices - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-026 Norfolk Boreas Limited Additional Submissions - Statement of Common Ground with Environment Agency - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-027 Norfolk Boreas Limited Additional Submissions - Statement of Common Ground with Marine Management Organisation - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-028 Norfolk Boreas Limited Additional Submissions - Statement of Common Ground with Natural England - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-029 Norfolk Boreas Limited Additional Submissions - Statement of Common Ground with Natural England (Offshore Ornithology) - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-030 Norfolk Boreas Limited Additional Submissions - Statement of Common Ground with The Royal Society for the Protection of Birds - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
Additional Submissions - Statement of Common Ground with The Wildlife Trusts and Norfolk Wildlife Trust - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-032 Cawston Parish Council Additional Submissions - Comments on Relevant Representations - Submitted in response to the Examining Authority’s request in the Rule 6 Letter of 11 October 2019
AS-033 Environment Agency Additional Submission - Response to the Rule 6 Letter of 11 October 2019
AS-034 Highways England Additional Submission - Response to the Rule 6 Letter of 11 October 2019
AS-035 Marine Management Organisation Additional Submission - Response to the Rule 6 Letter of 11 October 2019
AS-036 Natural England Additional Submission - Response to the Rule 6 Letter of 11 October 2019
AS-037 North Norfolk District Council Additional Submission - Response to the Rule 6 Letter of 11 October 2019
AS-038 Polly Brockis Additional Submission - Response to the Rule 6 Letter of 11 October 2019
AS-039 NATS Safeguarding Additional Submission - Response to the Rule 6 Letter of 11 October 2019
AS-040 Polly Brockis Additional Submission - Nominations of suggested locations for site inspections - Accepted at the discretion of the Examining Authority
AS-041 The Royal Society for the Protection of Birds Additional Submission - Further comments on the Offshore Ornithology Assessment Update - Accepted at the discretion of the Examining Authority
AS-042 Breckland Council Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-043 Broadland District Council Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-044 Necton Parish Council Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-046 North Norfolk District Council Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-047 Oulton Parish Council Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-048 The Royal Society for the Protection of Birds Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-049 Necton Substation Action Group Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-050 Phil Hayton Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-051 Necton Substation Action Group Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-052 Norfolk Boreas Limited Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-053 People with Energy Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-054 Future Marine Services Group Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-055 ESP Scotland Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-056 Necton Substation Action Group Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-057 Opergy Ltd Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-058 Tidal Transit Limited Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-059 John Best Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-060 Andrew Egerton-Smith Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-061 Julia Nix Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-062 Cawston Parish Council Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining
AS-063 HexCam Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-064 Windcat Workboats Ltd Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-065 Norfolk County Council Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-066 Oulton Parish Council Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-067 TMS Media Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-068 Colin King Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-069 Breckland Council Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-070 Greg Peck Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-071 Necton Parish Council Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-072 Brian Schuil Additional Submission – Submissions in response to Covid-19 restrictions – Accepted at the discretion of the Examining Authority
AS-073 TFKable GROUP Additional Submission – Submissions in response to Covid-19 restrictions – Accepted at the discretion of the Examining Authority
AS-074 North Norfolk District Council Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-075 Polly Brockis Additional Submission - Submissions in response to Covid-19 restrictions - Accepted at the discretion of the Examining Authority
AS-076 Norfolk Boreas Limited Additional Submission - Response to the Secretary of State’s letter of 11 May 2020 - Accepted at the discretion of the Examining Authority
AS-077 Necton Parish Council Additional Submission - Response to Applicant's letter of 12 May 2020 - Accepted at the discretion of the Examining Authority
Events and Hearings Preliminary Meeting - 12 November 2019 EV1-001 Norfolk Boreas Limited
Notice of Preliminary Meeting and Hearings on 12 - 14 November 2019
EV1-002 Recording of Preliminary Meeting - 12 November 2019 EV1-003 Preliminary Meeting Note Unaccompanied Site Inspections EV2-001 Note of Unaccompanied Site Inspections up to 1 October 2019 EV2-002 Note of Unaccompanied Site Inspections up to 11 November 2019
EV2-003 Note of Unaccompanied Site Inspections up to 20 January 2020 The Examining Authority's updated USI record
EV2-004 Note of Unaccompanied Site Inspection up to 16 March 2020 The Examining Authority's updated USI record
Issue Specific Hearing 1 - 13 November 2019 EV3-001 The Planning Inspectorate
Agenda for Issue Specific Hearing 1: The draft Development Consent Order - Wednesday 13 November 2019
EV3-002 Norfolk Boreas Limited List of appearances for the Applicant at the Issue Specific Hearing on the draft Development Consent Order on 13 November 2019
EV3-003 Recording of Issue Specific Hearing 1 - Part 1 of 2 Issue Specific Hearing on draft Development Consent Order - 13 November 2019
EV3-004 Recording of Issue Specific Hearing 1 - Part 2 of 2 Issue Specific Hearing on draft Development Consent Order - 13 November 2019
EV3-005 The Planning Inspectorate Action points arising from the Issue Specific Hearing on the draft Development Consent Order held on 13 November 2019
Open Floor Hearing 1 - 13 November 2019 EV4-001 Recording of Open Floor Hearing 1 - 13 November 2019 Issue Specific Hearing 2 - 14 November 2019 EV5-001 The Planning Inspectorate
Agenda for Issue Specific Hearing 2: Environmental Matters including HRA - Thursday 14 November 2019
EV5-002 Norfolk Boreas Limited List of appearances for the Applicant at the Issue Specific Hearing on environmental matters including HRA on 14 November 2019
EV5-003 Recording of Issue Specific Hearing 2 - Part 1 of 3 Issue Specific Hearing on Environmental Matters including Habitats Regulations Assessment - 14 November 2019
EV5-004 Recording of Issue Specific Hearing 2 - Part 2 of 3 Issue Specific Hearing on Environmental Matters including Habitats Regulations Assessment - 14 November 2019
EV5-005 Recording of Issue Specific Hearing 2 - Part 3 of 3 Issue Specific Hearing on Environmental Matters including Habitats Regulations Assessment - 14 November 2019
EV5-006 The Planning Inspectorate Action points arising from the Issue Specific Hearing on environmental matters including HRA held on 14 November 2019
Issue Specific Hearing 3 – 21 January 2020 EV6-001 The Planning Inspectorate
Agenda for Issue Specific Hearing 3: Onshore effects including the draft Development Consent Order
EV6-002 The Planning Inspectorate Recording of Issue Specific Hearing on Onshore effects including the draft Development Consent Order - Part 1 - 21 January 2020
EV6-003 The Planning Inspectorate Recording of Issue Specific Hearing on Onshore effects including the draft Development Consent Order - Part 2 - 21 January 2020
EV6-004 The Planning Inspectorate Recording of Issue Specific Hearing on Onshore effects including the draft Development Consent Order - Part 3 - 21 January 2020
EV6-005 The Planning Inspectorate Recording of Issue Specific Hearing on Onshore effects including the draft Development Consent Order - Part 4 - 21 January 2020
EV6-006 The Planning Inspectorate Action Points arising from the Issue Specific Hearing on Onshore effects including the draft Development Consent Order - 21 January 2020
Issue Specific Hearing 4 – 22 January 2020 EV7-001 The Planning Inspectorate
Agenda for Issue Specific Hearing 4: Offshore effects including the draft Development Consent Order
EV7-002 The Planning Inspectorate Recording of Issue Specific Hearing on Offshore effects including the draft Development Consent Order - Part 1 - 22 January 2020
EV7-003 The Planning Inspectorate Recording of Issue Specific Hearing on Offshore effects including the draft Development Consent Order - Part 2 - 22 January 2020
EV7-004 The Planning Inspectorate Recording of Issue Specific Hearing on Offshore effects including the draft Development Consent Order - Part 3 - 22 January 2020
EV7-005 The Planning Inspectorate Action Points arising from the Issue Specific Hearing on Offshore effects including the draft Development Consent Order - 22 January 2020
Accompanied Site Inspections EV8-001 Accompanied Site Inspection Itinerary EV8-002 Note of Accompanied Site Inspection 1 on 23 January 2020
The Examining Authority's record of Accompanied Site Inspection 1 on 23 January 2020
EV8-003 Accompanied Site Inspection Itinerary 2 Issue Specific Hearing 5 – 17 March 2020 EV9-001 The Planning Inspectorate
Agenda for Issue Specific Hearing 5: Onshore and Offshore effects including the draft Development Consent Order
EV9-002 Natural England Cover Letter - Submission in lieu of attendance at Issue Specific Hearing 5 on Onshore and Offshore effects including the draft Development Consent Order
EV9-003 Natural England Updated Ornithology Collision Risk Modelling Advice - Submission in lieu of attendance at Issue Specific Hearing 5 on Onshore and Offshore effects including the draft Development Consent Order
Submission in lieu of attendance at Issue Specific Hearing 5 on Onshore and Offshore effects including the draft Development Consent Order
EV9-005 Oulton Parish Council Cover Email - Submission in lieu of attendance at Issue Specific Hearing 5 on Onshore and Offshore effects including the draft Development Consent Order
EV9-006 Oulton Parish Council Norfolk Vanguard Noise Mitigation Measures at the Old Railway Gatehouse Position Statement - Issue Specific Hearing 6, Action Point 14 - Submission in lieu of attendance at Issue Specific Hearing 5 on Onshore and Offshore effects including the draft Development Consent Order
EV9-007 Oulton Parish Council Deadline 9 Submission for Norfolk Vanguard - Submission in lieu of attendance at Issue Specific Hearing 5 on Onshore and Offshore effects including the draft Development Consent Order
EV9-008 Oulton Parish Council Ørsted Hornsea Project Three (UK) Ltd - Appendix 23 - Construction Traffic Noise and Vibration Assessment at The Old Railway Gatehouse - Submission in lieu of attendance at Issue Specific Hearing 5 on Onshore and Offshore effects including the draft Development Consent Order
EV9-009 Oulton Parish Council Submission on Noise & Vibration for Ørsted Hornsea Project Three (UK) Ltd - Submission in lieu of attendance at Issue Specific Hearing 5 on Onshore and Offshore effects including the draft Development Consent Order
EV9-010 Cawston Parish Council Submission in lieu of attendance at Issue Specific Hearing 5 on Onshore and Offshore effects including the draft Development Consent Order
Compulsory Acquisition Hearing – 18 March 2020 EV10-001 The Planning Inspectorate
Agenda for Compulsory Acquisition Hearing Representations Deadline 1 – 25 November 2019 • Submission of post-hearing documents including any written submissions of oral case • Revised draft DCO and Schedule of Changes • Applicant’s updated HRA Matrices to inform the RIES • Nominations of suggested locations and justifications for site inspections for consideration by the ExA • Notification by Statutory Parties of wish to be considered an Interested Party • Any other information as requested by the ExA REP1-001 Norfolk Boreas Limited
Deadline 1 Submission - Cover Letter REP1-002 Norfolk Boreas Limited
Deadline 1 Submission - Applicant's Guide to the Application (Version 3)
REP1-031 Norfolk Boreas Limited Deadline 1 Submission - 8.16 Outline Scour Protection and Cable Protection Plan (Clean) (Version 2)
REP1-032 Norfolk Boreas Limited Deadline 1 Submission - 8.16 Outline Scour Protection and Cable Protection Plan (Tracked Changes) (Version 2)
REP1-033 Norfolk Boreas Limited Deadline 1 Submission - 8.20 Outline Norfolk Boreas Haisborough Hammond and Winterton Special Area of Conservation Site Integrity Plan (Clean) (Version 2)
REP1-034 Norfolk Boreas Limited Deadline 1 Submission - 8.20 Outline Norfolk Boreas Haisborough Hammond and Winterton Special Area of Conservation Site Integrity Plan (Tracked Changes) (Version 2)
REP1-035 Norfolk Boreas Limited Deadline 1 Submission - Schedule of Changes to the draft Development Consent Order (Version 2)
REP1-036 Norfolk Boreas Limited Deadline 1 Submission - Applicant's Response to the Open Floor Hearing
REP1-041 Norfolk Boreas Limited Deadline 1 Submission - Written Summary of the Applicant's Oral Case at Issue Specific Hearing 1 - draft Development Consent Order
REP1-042 Norfolk Boreas Limited Deadline 1 Submission - Written Summary of the Applicant's Oral Case at Issue Specific Hearing 2 - Environmental Matters including Habitats Regulations Assessment
REP1-043 Cawston Parish Council Deadline 1 Submission - Submission of post-hearing document including any written submissions of oral case and justification for site inspections for consideration by the ExA
REP1-044 Cawston Parish Council Deadline 1 Submission - Other Submission - Submissions made to the Hornsea 3 and Norfolk Vanguard Examinations
REP1-045 Glenn Berry Chairman on behalf of Happisburgh Parish Council Deadline 1 Submission - Submission of post-hearing document including any written submission of oral case
REP1-046 Glenn Berry Chairman on behalf of Happisburgh Parish Council Deadline 1 Submission - Nomination of suggested locations and justifications for site inspections for consideration by the Examining Authority
REP1-047 Glenn Berry Chairman on behalf of Happisburgh Parish Council Deadline 1 Submission - Other Submission
REP1-048 Necton Parish Council Deadline 1 Submission - Submission of post-hearing document including any written submission of oral case
REP1-049 Necton Parish Council Deadline 1 Submission - Nominations of suggested locations and justifications for site inspections for consideration by the ExA
REP1-050 Oulton Parish Council Deadline 1 Submission - Submission of post-hearing document including any written submissions of oral case
REP1-051 Oulton Parish Council Deadline 1 Submission - Nominations of suggested locations and justifications for site inspections for consideration by the ExA
REP1-052 Oulton Parish Council Deadline 1 Submission - Other Submission - Questions and comments made by the Parish Council at the Preliminary Meeting and copy of a letter from George Freeman MP to BEIS
Deadline 1 Submission - Other Submission - Dudgeon and Sheringham Shoal Offshore Wind Farm Extensions Scoping Report of October 2019
REP1-054 Oulton Parish Council Deadline 1 Submission - Other Submission - Summary of Norfolk Vanguard issues and submissions for Norfolk Vanguard deadlines
REP1-055 Natural England Deadline 1 Submission - Other Submission - Response to the Rule 8 Letter
REP1-056 Natural England Deadline 1 Submission - Other Submission - Updated Risk and Issues Log
REP1-057 Natural England Deadline 1 Submission - Other Submission - Appendix 2.6 Natural England advice note regarding consideration of small scale habitat loss within Special Areas of Conservation (SACs) in relation to cable protection, omitted in error from Natural England's Relevant Representation
REP1-058 Marine Management Organisation Deadline 1 Submission - Post-hearing document including any written submission of oral case
REP1-059 N2RS Deadline 1 Submission - Submission of post-hearing documents including any written submissions of oral case
REP1-060 Necton Substation Action Group Deadline 1 - Submission in lieu of attendance at Issue Specific Hearing 2 on Environmental Matters including HRA on 14 November 2019
REP1-061 Necton Substation Action Group Deadline 1 Submission - Other Submission
REP1-062 Savills (UK) Ltd on behalf of Mr C Allhusen Deadline 1 Submission - Nomination of suggested locations and justifications for site inspections for consideration by the ExA
REP1-063 Nicola Banham Deadline 1 Submission - Submission of post-hearing document including any written submission of oral case
REP1-064 George Freeman MP Deadline 1 Submission - Other Submission
REP1-065 Colin King Deadline 1 Submission - Nomination of suggested locations and justifications for site inspections for consideration by the Examining Authority
REP1-066 Diana Lockwood Deadline 1 Submission - Nomination of suggested locations and justifications for site inspections for consideration by the Examining Authority
REP1-067 The Monk Family Deadline 1 Submission -Nomination of suggested locations and justification for site inspections for consideration by the ExA
Deadline 1 Submission - Submission of post-hearing document including any written submission of oral case and nomination of suggested locations and justifications for consideration by the ExA - Accepted at the discretion of the Examining Authority
REP1-069 Julian Pearson Deadline 1 Submission - Submission of post-hearing documents including any written submissions of oral case - Accepted at the discretion of the Examining Authority
REP1-070 Guy Pitcher Deadline 1 Submission - Submission of post-hearing documents including any written submissions of oral case - Accepted at the discretion of the Examining Authority
REP1-071 Kate Pitcher Deadline 1 Submission - Nominations of suggested locations and justifications for site inspections for consideration by the ExA - Accepted at the discretion of the Examining Authority
REP1-072 Jenny Smedley Deadline 1 Submission - Nominations of suggested locations and justifications for site inspections for consideration by the ExA
REP1-073 Jenny Smedley Deadline 1 Submission - Other Submission
REP1-074 David Vince & Nicola Draycott Deadline 1 Submission - Other Submission - Accepted at the discretion of the Examining Authority
Deadline 2 – 10 December 2019 • Written Representations • Summaries of Relevant Representations exceeding 1500 words • Summaries of all Written Representations exceeding 1500 words • Local Impact Reports • Responses to ExA’s Written Questions • Initial Statements of Common Ground • Schedule of Mitigation • Notification of wish to speak at a Compulsory Acquisition Hearing • Notification of wish to make oral representations at the Issue Specific Hearings in January 2020 • Notification of wish to speak at Open Floor Hearing • Any other information as requested by the ExA
REP2-001 Norfolk Boreas Limited
Deadline 2 Submission - Cover Letter
REP2-002 Norfolk Boreas Limited Deadline 2 Submission - Guide to the Application (Version 4)
REP2-003 Norfolk Boreas Limited Deadline 2 Submission - 5.4 Consents and Licences Required under Other Legislation (Version 2) (Clean)
REP2-072 Historic England Deadline 2 Submission - Written Representation
REP2-073 Historic England Deadline 2 Submission - Responses to ExA’s Written Questions
REP2-074 Ministry of Defence Deadline 2 Submission - MoD safeguarding position - Other Submission
REP2-075 Ministry of Defence Deadline 2 Submission - Responses to ExA’s Written Questions
REP2-076 National Federation of Fishermen's Organisations Deadline 2 Submission - Written Representation
REP2-077 National Grid Deadline 2 Submission - Written Representation
REP2-078 National Trust Deadline 2 Submission - Other Submission - Withdrawal of objection
REP2-079 Natural England Deadline 2 Submission - Cover Letter
REP2-080 Natural England Deadline 2 Submission - Responses to ExA’s Written Questions
REP2-081 Natural England Deadline 2 Submission - Risk and Issues Log
REP2-082 NATS Safeguarding Deadline 2 Submission - Written Representation
REP2-083 Necton Parish Council Deadline 2 Submission - Responses to ExA’s Written Questions
REP2-084 Norfolk County Council Deadline 2 Submission - Responses to ExA's Written Questions
REP2-085 Norfolk County Council Deadline 2 Submission - Local Impact Report
REP2-086 Norfolk County Council Deadline 2 Submission - Other Submission - Response to the Dudgeon and Sheringham Shoal Wind Farm scoping consultations
REP2-087 North Norfolk District Council Deadline 2 Submission - Local Impact Report
REP2-110 Patricia Lockwood Deadline 2 Submission - Written Representation
REP2-111 Trinity House Deadline 2 Submission - Responses to ExA’s Written Questions
REP2-112 Whale and Dolphin Conservation Deadline 2 Submission - Written Representation
Deadline 3 – 19 December 2019 • Comments on responses to ExA’s Written Questions • Comments on Written Representations • Comments on LIRs • Comments on the updated HRA Matrices • Updated Guide to the Application • Implications for the Norfolk Boreas Application for Development Consent of any SoS decision on the Norfolk Vanguard Offshore Windfarm application; • Any other information as requested by the ExA REP3-001 Norfolk Boreas Limited
Deadline 3 Submission - Cover Letter REP3-002 Norfolk Boreas Limited
Deadline 3 Submission - Guide to the Application (Revision 5) REP3-003 Norfolk Boreas Limited
Deadline 3 Submission - Comments on responses to ExA's Written Questions
REP3-004 Norfolk Boreas Limited Deadline 3 Submission - Comments on responses to ExA's Written Questions Appendix 1 (Part 1 of 2)
REP3-005 Norfolk Boreas Limited Deadline 3 Submission - Comments on responses to ExA's Written Questions Appendix 1 (Part 2 of 2)
REP3-006 Norfolk Boreas Limited Deadline 3 Submission - Comments on responses to ExA's Written Questions Appendix 2
REP3-007 Norfolk Boreas Limited Deadline 3 Submission - Applicant's Comments on Written Representations and Additional Submissions
REP3-008 Norfolk Boreas Limited Deadline 3 Submission - Applicant's Response to Norfolk County Council's Local Impact Report
REP3-009 Norfolk Boreas Limited Deadline 3 Submission - Applicant's Response to Breckland Council's Local Impact Report
REP3-010 Norfolk Boreas Limited Deadline 3 Submission - Applicant's Response to Broadland District Council's Local Impact Report
REP3-011 Norfolk Boreas Limited Deadline 3 Submission - Applicant's Response to North Norfolk District Council's Local Impact Report
REP3-012 Norfolk Boreas Limited Deadline 3 Submission - Implications for the Norfolk Boreas Application for Development Consent of any Secretary of State decision on the Norfolk Vanguard Offshore Windfarm Application
REP3-013 Cawston Parish Council Deadline 3 Submission - Comments on Deadline 2 submissions
REP3-014 Cawston Parish Council Deadline 3 Submission - Comments on Deadline 2 Norfolk Boreas - Appendix 14.2 Norfolk Vanguard Offshore Wind Farm Alternative Construction Routes at Cawston, Applicants Comments on Deadline 6 Written Submissions: Appendix 2
REP3-015 Historic England Deadline 3 Submission - Comments on responses to ExA's Written Questions
REP3-016 Marine Management Organisation Deadline 3 Submission - Comments on responses to ExA’s Written Questions
REP3-017 Marine Management Organisation Deadline 3 Submission - Other submission
REP3-018 National Farmers Union Deadline 3 Submission - Responses to ExA's Written Questions - Late Response for Deadline 2
REP3-019 National Grid Deadline 3 Submission - Responses to ExA's Written Questions - late response for Deadline 2
REP3-020 Natural England Deadline 3 Submission - Cover Letter
REP3-021 Natural England Deadline 3 Submission - Response to Norfolk Boreas comments on Relevant Representations [AS-024] Table 26 DCO and DML
REP3-022 Natural England Deadline 3 Submission - Response to Onshore Ecology and Onshore Ornithology Documents submitted at Deadline 1 and 2
REP3-023 Natural England Deadline 3 Submission - Advice on Cable Protection Assessment for Offshore Windfarms and Inclusion in Marine Licenses - Draft Position Paper December 2019
REP3-024 Natural England Deadline 3 Submission - Risk and Issue Register
REP3-025 Necton Substation Action Group Deadline 3 Submission - Comments on responses to ExA’s Written Questions
REP3-026 Necton Substation Action Group Deadline 3 Submission - Other Submission
REP3-027 Oulton Parish Council Deadline 3 Submission - Comments on responses to ExA’s Written Questions
REP3-028 The Royal Society for the Protection of Birds Deadline 3 Submission - Comments on responses to ExA’s Written Questions
REP3-029 The Wildlife Trusts Deadline 3 Submission - Responses to ExA's Written Questions - Late Response for Deadline 2
REP3-030 Colin King Deadline 3 Submission - Comments on responses to ExA’s Written Questions
Deadline 4 – 30 January 2020 • Post hearing submissions from hearings • Revised draft DCO and Schedule of Changes • Any other information as requested by the ExA
REP4-001 Norfolk Boreas Limited Deadline 4 Submission - Cover Letter
REP4-002
Norfolk Boreas Limited Deadline 4 Submission - Applicant's Guide to the Application (Version 6)
Norfolk Boreas Limited Deadline 4 Submission - Applicant's Response to Natural England's Onshore Ecology and Onshore Ornithology Deadline 3 Submissions
REP4-011
Norfolk Boreas Limited Deadline 4 Submission - Applicant's Comments on Responses to the Examining Authority's Written Questions - Late Submissions and Additional Comments received at Deadline 3
REP4-012
Norfolk Boreas Limited Deadline 4 Submission - Applicant's Responses to the Examining Authority's Written Questions Appendices - Section 9 - Appendices 9.5 and 9.6
REP4-013
Norfolk Boreas Limited Deadline 4 Submission - Written Summary of the Applicant's Oral Case at Issue Specific Hearing 3 - Onshore effects including the draft Development Consent Order
REP4-014
Norfolk Boreas Limited Deadline 4 Submission - Written Summary of the Applicant's Oral Case at Issue Specific Hearing 4 - Offshore effects including the draft Development Consent Order
REP4-015
Norfolk Boreas Limited Deadline 4 Submission - Orsted Hornsea Project Three BEIS Letter dated 31 October 2019
Breckland Council Deadline 4 Submission - Post hearing submission - Response to Action Point 13 of the Issue Specific Hearing on onshore effects including the draft Development Consent Order
REP4-027 Cawston Parish Council Deadline 4 Submission - Post hearing submission
REP4-028
Necton Parish Council Deadline 4 Submission - Comments on Responses to ExA's Written Questions at Deadline 3
REP4-029 Necton Parish Council Deadline 4 Submission - Post hearing submission
REP4-030 Necton Parish Council Deadline 4 Submission - Post ASI Submission
REP4-031 North Norfolk District Council Deadline 4 Submission - Post hearing submission
REP4-032 Oulton Parish Council Deadline 4 Submission - Post hearing submission
REP4-033
Eastern Inshore Fisheries and Conservation Authority Deadline 4 Submission - Post hearing submission - Response to Action Point 4 of the Issue Specific Hearing on offshore effects including the draft Development Consent Order
REP4-034 Historic England Deadline 4 Submission - Post hearing submission
REP4-039 Natural England Deadline 4 submission - Updated Ornithology Advice
REP4-040
Natural England Deadline 4 Submission - Updated Ornithology Advice - Comments in relation to the Norfolk Boreas updated offshore ornithological assessment, submitted at Deadline 2 [REP2-035]
REP4-041
Natural England Deadline 4 Submission - Position Statement Regarding the Proposed Site Integrity Plan for the Haisborough Hammond and Winterton Special Area of Conservation
REP4-042 Natural England Deadline 4 Submission - Risk and Issues Log
REP4-043 Natural England Deadline 4 Submission - Post hearing submission
Deadline 5 Submission - 8.17 In Principle Norfolk Boreas Southern North Sea Special Area of Conservation (SAC) Site Integrity Plan (Version 2) (Clean)
REP5-042 Norfolk Boreas Limited Deadline 5 Submission - 8.17 In Principle Norfolk Boreas Southern North Sea Special Area of Conservation (SAC) Site Integrity Plan (Version 2) (Tracked Changes)
REP5-044 Norfolk Boreas Limited Deadline 5 Submission - Schedule of Changes to the draft Development Consent Order (Version 4)
REP5-045 Norfolk Boreas Limited Deadline 5 Submission - Applicant's Responses to the Examining Authority's Further Written Questions
REP5-046 Norfolk Boreas Limited Deadline 5 Submission - Applicant's Responses to the Examining Authority's Further Written Questions Appendices Section 3
REP5-047 Norfolk Boreas Limited Deadline 5 Submission - Applicant’s Responses to the Examining Authority’s Further Written Questions Appendices Section 9
REP5-048 Norfolk Boreas Limited Deadline 5 Submission - Issue Specific Hearings 3 and 4 Action Points Tracker (Version 2)
REP5-061 Breckland Council Deadline 5 Submission - Response to Further Written Questions
REP5-062 Cawston Parish Council Deadline 5 Submission - Response to Further Written Questions
REP5-063 Necton Parish Council Deadline 5 Submission - Response to Further Written Questions
REP5-064 Necton Parish Council Deadline 5 Submission - Representation on SoCG
REP5-065 Norfolk County Council Deadline 5 Submission - Response to Further Written Questions
REP5-066 Norfolk County Council Deadline 5 Submission - Response to the Applicant's clarification note on trenchless crossings
REP5-067 North Norfolk District Council Deadline 5 Submission - Response to Further Written Questions
REP5-068 Oulton Parish Council Deadline 5 Submission - Response to Further Written Questions
REP5-069 Eastern Inshore Fisheries and Conservation Authority Deadline 5 Submission - Response to Further Written Questions
REP5-070 Environment Agency Deadline 5 Submission - Response to Further Written Questions
REP5-071 Historic England Deadline 5 Submission - Response to Further Written Questions
REP5-072 Maritime & Coastguard Agency Deadline 5 Submission - Response to Further Written Questions
REP5-073 Marine Management Organisation Deadline 5 Submission - Response to Further Written Questions; Comments on draft DCO; update on comments raised at Deadline 4
REP5-074 National Farmers Union Deadline 5 Submission - Response to Further Written Questions
REP5-075 National Grid Deadline 5 Submission - Response to Further Written Questions
REP5-076 Natural England Deadline 5 Submission - Cover Letter
REP5-077 Natural England Deadline 5 Submission - Responses to Examining Authority's Further Written Questions and Requests for Information (ExQ2)
REP5-078 Natural England Deadline 5 Submission - Response to the Applicant's Summary of Oral Representations at Issue Specific Hearing 4 - Agenda Item 6a(i)
REP5-087 Necton Substation Action Group Deadline 5 Submission - Meeting with Breckland Council and request for Statement of Common Ground with Necton Parish Council
REP5-088 Necton Substation Action Group Deadline 5 Submission - Submissions on earth banks, National Grid extension location and Top Farm
REP5-089 Chris Allhusen Deadline 5 Submission - Response to Further Written Questions
REP5-090 Polly Brockis Deadline 5 Submission - Response to Further Written Questions
REP5-091 Colin King Deadline 5 Submission
REP5-092 Patricia Lockwood Deadline 5 Submission
REP5-093 Tony Smedley Deadline 5 Submission
REP5-094 Eni UK Limited Deadline 5 Submission
Deadline 6 – 05 March 2020 • Comments on responses to Further Written Questions • An Updated Compulsory Acquisition Objections schedule • Updated Statements of Common Ground • Updated Guide to the Application • Any other information as requested by the ExA REP6-001 Norfolk Boreas Limited
Deadline 6 Submission - Cover Letter REP6-002 Norfolk Boreas Limited
Deadline 6 Submission - Applicant's Guide to the Application (Version 8)
REP6-011 Norfolk Boreas Limited Deadline 6 Submission - 8.20 Outline Norfolk Boreas Haisborough Hammond and Winterton Special Area of Conservation Site Integrity Plan (Version 3) (Clean)
REP6-012 Norfolk Boreas Limited Deadline 6 Submission - 8.20 Outline Norfolk Boreas Haisborough Hammond and Winterton Special Area of Conservation Site Integrity Plan (Version 3) (Tracked Changes)
REP6-014 Norfolk Boreas Limited Deadline 6 Submission - Applicant's Comments on Responses to the Examining Authority's Further Written Questions
REP6-015 Norfolk Boreas Limited Deadline 6 Submission - Applicant's Statement of Commonality of Statements of Common Ground
REP6-016 Norfolk Boreas Limited Deadline 6 Submission - Additional information for the HHW SAC position paper
REP6-017 Norfolk Boreas Limited Deadline 6 Submission - Outline Norfolk Boreas Haisborough Hammond and Winterton Special Area of Conservation Cable Specification, Installation and Monitoring Plan - Annex 1
REP6-018 Norfolk Boreas Limited Deadline 6 Submission - Additional information to the HHW SAC position paper - Annex 2 - Cable Protection Decommissioning Evidence
Deadline 6 Submission - Additional information for the HHW SAC position paper - Annex 4 - Assessment of Additional Mitigation in the Haisborough, Hammond and Winterton Special Area of Conservation (Version 2)
REP6-020 Norfolk Boreas Limited Deadline 6 Submission - Additional information to the HHW SAC position paper - Annex 3 - BT Cable Recovery Letter of Comfort
REP6-021 Norfolk Boreas Limited Deadline 6 Submission - Headroom Position Paper and Examples
REP6-022 Norfolk Boreas Limited Deadline 6 Submission - Joint Position Statement with North Norfolk District Council Noise Sensitive Receptors
REP6-025 Norfolk Boreas Limited Deadline 6 Submission - Position Statement on Derogation
REP6-026 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with Broadland District Council (Version 2)
REP6-027 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with Eastern Inshore Fisheries and Conservation Authority (Version 2)
REP6-028 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with Environment Agency (Version 3)
REP6-029 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with Marine Management Organisation (Version 3)
REP6-030 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with Maritime and Coastguard Agency (Version 2)
REP6-031 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with National Association of Producer Organisations in Dutch Demersal Fisheries (VisNed) and National Federation of Fishermen’s Organisations (NFFO) (Version 2)
REP6-032 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with National Farmers Union (Version 2)
REP6-033 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with Natural England (Version 3)
REP6-034 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with Natural England (Offshore Ornithology) (Version 3)
Deadline 6 Submission - Statement of Common Ground with Norfolk County Council (Version 2)
REP6-036 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with North Norfolk District Council (Version 2)
REP6-037 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with Orsted Hornsea Project Three (Version 2)
REP6-038 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with Royal Society of the Protection of Birds (Version 2)
REP6-039 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with Trinity House (Version 2)
REP6-040 Norfolk Boreas Limited Deadline 6 Submission - Statement of Common Ground with The Wildlife Trusts and Norfolk Wildlife Trust (Version 3)
REP6-041 Breckland Council Deadline 6 Submission - Response to Further Written Questions - Intended for Deadline 5
REP6-042 Cawston Parish Council Deadline 6 Submission - Comments on Responses to Further Written Questions
REP6-043 North Norfolk District Council Deadline 6 Submission - Comments on Responses to Further Written Questions; Responses to Further Written Questions; and Other Matters
REP6-044 Oulton Parish Council Deadline 6 Submission - Comments on Responses to Further Written Questions
REP6-045 Marine Management Organisation Deadline 6 Submission - Comments on Responses to Further Written Questions
REP6-046 Marine Management Organisation Deadline 6 Submission - Comments on the Draft DCO and the Applicant's submissions at Deadline 5
REP6-047 Marine Management Organisation Deadline 6 Submission - Response to Notification of Hearings
REP6-048 Natural England Deadline 6 Submission - Cover Letter
REP6-049 Natural England Deadline 6 Submission - Comments on Norfolk Boreas approach to as-built vs consented turbine numbers and headroom in cumulative/in combination collision assessments
REP6-050 Natural England Deadline 6 Submission - Comments in Response to Offshore Issue Specific Hearing Action Points
REP6-051 Natural England Deadline 6 Submission - Risk and Issues Log
Deadline 7 Submission - Applicant's Comments on Deadline 6 Submissions and Other Submissions
REP7-017
Norfolk Boreas Limited Deadline 7 Submission - Applicant's Responses to the Examining Authority's Third Round of Written Questions
REP7-018
Norfolk Boreas Limited Deadline 7 Submission - Applicant's Responses to the Examining Authority's Third Round of Written Questions Appendices - Section 8 - Appendix 8.1 (Q3.8.3.5)
REP7-019
Norfolk Boreas Limited Deadline 7 Submission - Applicant's Responses to the Examining Authority's Third Round of Written Questions Appendices - Section 9 - Appendix 9.1 (Version 2) Appendix 9.2 (Q3.9.3.1)
REP7-020
Norfolk Boreas Limited Deadline 7 Submission - Applicant's Responses to the Examining Authority's Third Round of Written Questions Appendices - Section 12 - Appendix 12.1 (Q3.12.0.3)
REP7-021
Norfolk Boreas Limited Deadline 7 Submission - Applicant's Responses to the Examining Authority's Third Round of Written Questions Appendices - Section 14 - Appendices 14.1 (Q3.14.1.8) and 14.2 (Q3.14.4.9)
Deadline 7 Submission - update on response to Further Written Questions
REP7-066
Necton Substation Action Group Deadline 7 Submission - 3D view of buildings inside one Vattenfall convertor building
REP7-067
Colin King Deadline 7 Submission - Response to the Applicant's Comments to Deadline 5 Submission
REP7-068
Margaret Woodall Deadline 7 Submission - Accepted at the discretion of the Examining Authority
Late Submissions REP7-069
Necton Parish Council Deadline 7 Submission - Accepted at the discretion of the Examining Authority
REP7-070
Oulton Parish Council Deadline 7 Submission - Accepted at the discretion of the Examining Authority
REP7-071 The Old Railway Gatehouse Deadline 7 Submission - Accepted at the discretion of the Examining Authority
REP7-072 North Norfolk District Council Deadline 7 Submission - Late Submission - Response to Examining Authority's third round of Written Questions - Accepted at the discretion of the Examining Authority
Deadline 8 – 08 April 2020 • Comments on responses to third round of written questions • Comments on revised draft DCO and Schedule of Changes • Updated Statements of Common Ground • Any other information as requested by the ExA REP8-001 Norfolk Boreas Limited
Deadline 8 Submission - Cover Letter REP8-002 Norfolk Boreas Limited
Deadline 8 Submission - Applicant's Guide to the Application (Version 10)
REP8-003 Norfolk Boreas Limited Deadline 8 Submission - 8.1 Outline Code of Construction Practice (Version 4) (Clean)
REP8-004 Norfolk Boreas Limited Deadline 8 Submission - 8.1 Outline Code of Construction Practice (Version 4) (Tracked Changes)
REP8-033 Royal Society for the Protection of Birds Deadline 8 Submission
REP8-034 Trinity House Deadline 8 Submission - Comments on responses to third round of Written Questions
REP8-035 Colin King Deadline 8 Submission
REP8-036 Norfolk County Council Deadline 7 and 8 Submission – late responses to third round of written questions and comments on responses to third round of written questions
Deadline 9 – 29 April 2020 • Comments on the RIES • Updated Guide to the Application • Final ‘Compulsory Acquisition’ schedule • Final signed Statements of Common Ground • Submissions on the implications for the Norfolk Boreas Application of the representations made in relation to the SoS consultation on the Norfolk Vanguard and any other relevant offshore Wind Farm applications • Any other information as requested by the ExA REP9-001 Norfolk Boreas Limited
Deadline 9 Submission - Cover Letter REP9-002 Norfolk Boreas Limited
Deadline 9 Submission - Applicant's Guide to the Application (Version 11)
REP9-003 Norfolk Boreas Limited Deadline 9 Submission - 2.2 Land Plans (Onshore) (Version 3) - Part 1 of 6
REP9-004 Norfolk Boreas Limited Deadline 9 Submission - 2.2 Land Plans (Onshore) (Version 3) - Part 2 of 6
REP9-005 Norfolk Boreas Limited Deadline 9 Submission - 2.2 Land Plans (Onshore) (Version 3) - Part 3 of 6
REP9-006 Norfolk Boreas Limited Deadline 9 Submission - 2.2 Land Plans (Onshore) (Version 3) - Part 4 of 6
REP9-007 Norfolk Boreas Limited Deadline 9 Submission - 2.2 Land Plans (Onshore) (Version 3) - Part 5 of 6
REP9-008 Norfolk Boreas Limited Deadline 9 Submission - 2.2 Land Plans (Onshore) (Version 3) - Part 6 of 6
REP9-009 Norfolk Boreas Limited Deadline 9 Submission - Submissions on the implications for the Norfolk Boreas Application arising from other relevant offshore wind farm applications awaiting SoS determination
REP9-010 Norfolk Boreas Limited Deadline 9 Submission - Applicant's Comments on the Report on the Implications for European Sites (RIES)
Deadline 9 Submission - Statement of Common Ground with Environment Agency (Version 4)
REP9-021 Norfolk Boreas Limited Deadline 9 Submission - Statement of Common Ground with Highways England (Version 2)
REP9-022 Norfolk Boreas Limited Deadline 9 Submission - Statement of Common Ground with Historic England
REP9-023 Norfolk Boreas Limited Deadline 9 Submission - Statement of Common Ground with Marine Management Organisation (Version 5)
REP9-024 Norfolk Boreas Limited Deadline 9 Submission - Statement of Common Ground with Maritime and Coastguard Agency (Version 4)
REP9-025 Norfolk Boreas Limited Deadline 9 Submission - Statement of Common Ground with National Association of Producer Organisations in Dutch Demersal Fisheries (VisNed) and National Federation of Fishermen’s Organisations (NFFO) (Version 3)
REP9-026 Norfolk Boreas Limited Deadline 9 Submission - Statement of Common Ground with Orsted Hornsea Project Three (Version 4)
REP9-027 Norfolk Boreas Limited Deadline 9 Submission - Statement of Common Ground with Royal Yachting Association
REP9-028 Norfolk Boreas Limited Deadline 9 Submission - Statement of Common Ground with Trinity House (Version 4)
REP9-029 Norfolk Boreas Limited Deadline 9 Submission - Statement of Common Ground with Whale and Dolphin Conservation (Version 2)
REP9-030 Norfolk Boreas Limited Deadline 9 Submission - Statement of Common Ground with The Wildlife Trusts and Norfolk Wildlife Trust (Version 4)
REP9-031 Breckland Council Deadline 9 Submission - Response to Third Round of Written Questions
REP9-032 Cawston Parish Council Deadline 9 Submission
REP9-033 Oulton Parish Council Deadline 9 Submission
REP9-034 Marine Management Organisation Deadline 9 Submission - Written Response
REP9-035 Marine Management Organisation Deadline 9 Submission - Comments on Responses to ExA Third Written Questions
REP9-036 Marine Management Organisation Deadline 9 Submission - Response to Norfolk Vanguard Secretary of State Consultation
REP9-037 Natural England Deadline 9 Submission - Cover Letter
REP9-038 Natural England Deadline 9 Submission - Response to DCO Documents
REP9-039 Natural England Deadline 9 Submission - Comments on Outline Norfolk Boreas Haisborough Hammond and Winterton Special Area of Conservation Site Integrity Plan and Cable Specification, Installation and Monitoring Plan
REP9-040 Natural England Deadline 9 Submission - Comments on Additional information for the HHW SAC position paper
REP9-041 Natural England Deadline 9 Submission - Comments on Norfolk Boreas Position Statement on Derogation
REP9-042 Natural England Deadline 9 Submission - Response to Applicant’s Comments on Responses to the Examining Authority’s Third Round of Written Questions
REP9-043 Natural England Deadline 9 Submission - Comments on Additional information to the HHW SAC position paper- Annex 2 Cable Protection Decommissioning Evidence
REP9-044 Natural England Deadline 9 Submission - Comments on Assessment of Additional Mitigation in the Haisborough, Hammond and Winterton Special Area of Conservation (Version 2)
REP9-045 Natural England Deadline 9 Submission - Norfolk Boreas Position Statement Regarding Mitigation and Compensation
REP9-046 Natural England Deadline 9 Submission - Comments on Norfolk Boreas In Principle Habitats Regulations Derogation, Provision of Evidence - Appendix 1 Flamborough and Filey Coast SPA In Principle Compensation
REP9-047 Natural England Deadline 9 Submission - Comments on Norfolk Boreas In Principle Habitats Regulations Derogation, Provision of Evidence - Appendix 2 Alde-Ore Estuary SPA In Principle Compensation Measures
REP9-048 Natural England Deadline 9 Submission - Comments on In Principle Habitats Regulations Derogation, Provision of Evidence - Appendix 3 Haisborough, Hammond and Winterton SAC
Deadline 9 Submission - Response to the Offshore Ornithological Assessment Updates (Project Alone and Project Cumulative & In-combination Collision Risk Modelling) and Report on the Implications for Ecological Sites
REP9-053 The Wildlife Trusts Deadline 9 Submission - Response on Article 6(4) and Cabling Impacts
REP9-054 Colin King Deadline 9 Submission
REP9-055 Lucy Sheringham Deadline 9 Submission
Late Submission REP9-056 Norfolk County Council
Deadline 9 Submission - Late Submission - Statement of Common Ground - Accepted at the discretion of the Examining Authority
REP9-057 Natural England Deadline 9 Submission - Late Submission - Comments on the Report on the Implications for European Sites (RIES) - Accepted at the discretion of the Examining Authority
REP9-058 Natural England Deadline 9 Submission - Late Submission - Risk and Issue Log - Accepted at the discretion of the Examining Authority
REP9-059 North Norfolk District Council Deadline 8 and 9 Submission - Late Submission - Accepted at the discretion of the Examining Authority
Deadline 10 – 06 May 2020 • Responses to comments on the RIES • Responses to fourth round of written questions • Updated draft DCO and Schedule of Changes • Updated Statements of Common Ground • Updated Compulsory Acquisition Objections schedule • Comments on the submissions on the implications for the Norfolk Boreas Application of the representations made in relation to the SoS consultation on the Norfolk Vanguard and any other relevant offshore Wind Farm applications • Any other information as requested by the ExA REP10-001 Norfolk Boreas Limited
Deadline 10 Submission - Applicant's Cover Letter for Deadline 10 REP10-002 Norfolk Boreas Limited
Deadline 10 Submission - Applicant's Guide to the Application (Version 12)
REP10-024 Norfolk Boreas Limited Deadline 10 Submission - 8.16 Outline Scour Protection and Cable Protection Plan (Version 4) (Clean)
REP10-025 Norfolk Boreas Limited Deadline 10 Submission - 8.16 Outline Scour Protection and Cable Protection Plan (Version 4) (Tracked Changes)
REP10-026 Norfolk Boreas Limited Deadline 10 Submission - 8.20 Outline Norfolk Boreas Haisborough Hammond and Winterton Special Area of Conservation Cable Specification, Installation and Monitoring Plan (Version 2) (Clean)
REP10-027 Norfolk Boreas Limited Deadline 10 Submission - 8.20 Outline Norfolk Boreas Haisborough Hammond and Winterton Special Area of Conservation Cable Specification, Installation and Monitoring Plan (Version 2) (Tracked Changes)
REP10-028 Norfolk Boreas Limited Deadline 10 Submission - 8.20 Outline Norfolk Boreas Haisborough Hammond and Winterton Special Area of Conservation Site Integrity Plan (Version 4) (Clean)
REP10-029 Norfolk Boreas Limited Deadline 10 Submission - 8.20 Outline Norfolk Boreas Haisborough Hammond and Winterton Special Area of Conservation Site Integrity Plan (Version 4) (Tracked Changes)
REP10-030 Norfolk Boreas Limited Deadline 10 Submission - Schedule of Changes to the draft Development Consent Order (Version 6)
REP10-037 Norfolk Boreas Limited Deadline 10 Submission – Statement of Common Ground with National Farmers Union (Version 4)
REP10-038 Norfolk Boreas Limited Deadline 10 Submission - Statement of Common Ground with Natural England (Version 4)
REP10-039 Norfolk Boreas Limited Deadline 10 Submission - Statement of Common Ground with Natural England (Offshore Ornithology) (Version 4)
REP10-040 Norfolk Boreas Limited Deadline 10 Submission - Statement of Common Ground with North Norfolk District Council (Version 4)
REP10-041 Norfolk Boreas Limited Deadline 10 Submission - Statement of Common Ground with Royal Society of the Protection of Birds (Version 4)
REP10-042 Norfolk Boreas Limited Deadline 10 Submission - Applicant's Response to Comments on the Report on the Implications for European Sites (RIES)
REP10-043 Norfolk Boreas Limited Deadline 10 Submission - Assessment of Additional Mitigation in the Haisborough, Hammond and Winterton Special Area of Conservation (Version 3)
REP10-044 Breckland Council Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-045 Broadland District Council Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-046 Cawston Parish Council Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-047 Cawston Parish Council Deadline 10 Submission - Comments on Submissions from Deadline 6-9
REP10-048 Mulbarton Parish Council Deadline 10 Submission - Accepted at the discretion of the Examining Authority
REP10-049 Necton Parish Council Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-050 Norfolk County Council Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-051 North Norfolk District Council Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-052 Oulton Parish Council Deadline 10 Submission
REP10-053 Anglian Water Services Limited Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-054 Cadent Gas Limited Deadline 10 Submission - Withdrawal of Objection and Response to Fourth Round of Written Questions
REP10-055 Eastern Inshore Fisheries and Conservation Authority Deadline 10 Submission
REP10-056 Environment Agency Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-057 Highways England Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-058 Historic England Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-059 Marine Management Organisation Deadline 10 Submission - Cover Letter and update to REP9-036
REP10-060 Marine Management Organisation Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-061 Maritime & Coastguard Agency Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-062 National Farmers Union Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-063 Natural England Deadline 10 Submission - Cover Letter
REP10-064 Natural England Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-065 Natural England Deadline 10 Submission - Risk and Issues Log
REP10-066 The Old Railway Gatehouse Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-067 Royal Society for the Protection of Birds Deadline 10 Submission - Response to the Applicant’s In Principle Habitats Regulations Derogation Provision of Evidence submitted at Deadline 7 and other matters
REP10-068 Royal Society for the Protection of Birds Deadline 10 Submission - Response to Comments on the Report on the Implications for European Sites
REP10-069 Trinity House Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-070 UK Chamber of Shipping Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-071 The Wildlife Trusts Deadline 10 Submission - Response to Fourth Round of Written Questions
REP10-072 Colin King Deadline 10 Submission - Response to Applicant's Comments on Deadline 8 Submissions
Late Submissions REP10-073 The Crown Estate
Deadline 10 Submission - Late Submission - Accepted at the discretion of the Examining Authority
REP10-074 Nicola Banham Deadline 10 Submission - Late Submission - Accepted at the discretion of the Examining Authority
Deadline 11 – 11 May 2020 • Comments on responses to fourth round of written questions • Final draft DCO and Schedule of Changes to be submitted by the Applicant in the SI template with the SI template validation report • Final Note on Requirements and Conditions in the Development Consent Order • Final Guide to the Application • Final Compulsory Acquisition Objections schedule • Final signed Statements of Common Ground (or confirmatory email if parties are unable to sign it) • Final updated version of the Book of Reference REP11-001 Norfolk Boreas Limited
Deadline 11 Submission - Cover Letter REP11-002 Norfolk Boreas Limited
Deadline 11 Submission - Applicant's Guide to the Application (Version 13)
REP11-003 Norfolk Boreas Limited Deadline 11 Submission - 3.1 Updated Draft Development Consent Order (Clean) (Version 7)
REP11-004 Norfolk Boreas Limited Deadline 11 Submission - 3.3 Note on Requirements and Conditions in the Development Consent Order (Version 4)
REP11-005 Norfolk Boreas Limited Deadline 11 Submission - 4.3 Book of Reference (Clean) (Version 3)
REP11-006 Norfolk Boreas Limited Deadline 11 Submission - 4.3 Book of Reference (Tracked Changes) (Version 3)
REP11-007 Norfolk Boreas Limited Deadline 11 Submission - Applicant's Comments on Responses to the Examining Authority's Fourth Round of Written Questions
REP11-008 Norfolk Boreas Limited Deadline 11 Submission - Applicant's Comments on Deadline 10 Submissions and Other Submissions
REP11-016 Norfolk Boreas Limited Deadline 11 Submission - Joint Final Position Statement with Norfolk County Council Highway Intervention Scheme, Cawston
REP11-017 Breckland Council Deadline 11 Submission - Confirmatory Email of Final Statement of Common Ground Submitted at Deadline 9
REP11-018 Cawston Parish Council Deadline 11 Submission
REP11-019 Oulton Parish Council Deadline 11 Submission
REP11-020 Marine Management Organisation Deadline 11 Submission - Comments on the Applicant's draft DCO submitted at Deadline 10
REP11-021 Marine Management Organisation Deadline 11 Submission - Comments on Responses to the ExA's Fourth Round of Written Questions
REP11-022 National Federation of Fishermen's Organisations Deadline 11 Submission - Confirmatory Email of Final Statement of Common Ground Submitted at Deadline 9
REP11-023 National Grid Deadline 11 Submission - Withdrawal of Relevant Representation
REP11-024 Natural England Deadline 11 Submission - Confirmatory Letter of Final Statement of Common Ground Submitted at Deadline 10
REP11-025 Necton Substation Action Group Deadline 11 Submission
REP11-026 Orsted Hornsea Project Three Deadline 11 Submission - Confirmatory Letter of Final Statement of Common Ground Submitted at Deadline 9 and Submission on Cawston Traffic Matters
REP11-027 Royal Society for the Protection of Birds Deadline 11 Submission - Confirmatory Email of Final Statement of Common Ground Submitted at Deadline 10
Late Submission REP11-031 North Norfolk District Council
Deadline 11 Submission - Late Submission - Confirmatory Email of Final Statement of Common Ground Submitted at Deadline 10 - Accepted at the discretion of the Examining Authority
Deadline 12 – 26 May 2020 • Responses to the questionnaire on the use of teleconferencing and /or video conferencing technologies for hearings REP12-001 Norfolk Boreas Limited
Deadline 12 Submission - Applicant's Comments on Deadline 10 Submissions and Other Submissions (Tracked Changes) (Version 2). This version has been updated to include the Applicant's response to REP10-067 which was omitted in error from the version submitted at Deadline 11
REP12-002 Corpusty & Saxthorpe Parish Council Deadline 12 Submission - Response to fourth round of Written Questions