NORCAL LOGISTICS CENTER | STOCKTON, CA BUILDING 7 ±709,556 SF BUILDING 4580 LOGISTICS DRIVE, STOCKTON • ±709,556 SF Available Q3 2019 • Divisible to ±354,778 SF • Dimensions: ±1,242 x ±570’ • Parcel Acres: ±42.48 • Office to suit • 36’ minimum interior ceiling clearance • ESFR fire suppression system • 50’ x 54’ column spacing • 60’ speed bays • 7” DuctileCrete Engineered Slab • 4,000 amps; 277/480 volts; 3 phase • Designated Opportunity Zone LOADING • Cross-Load Design • One hundred and fourteen (114) 9’ x 10’ dock door positions • Four (4) 12’ x 14’ grade level doors • 135’ truck court with 60’ concrete aprons PARKING • 392 auto parking stalls • 181 trailer parking stalls JOHN MCMANUS Executive Managing Director +1 510 891 5817 [email protected]LIC #01129064 BLAKE RASMUSSEN Executive Managing Director +1 209 481 7044 [email protected]LIC #01010250 KEVIN DAL PORTO Executive Managing Director +1 209 601 2476 [email protected]LIC #01212935 cushmanwakefield.com A joint venture with:
3
Embed
NORCAL LOGISTICS BUILDING 7 709,556 SF CENTER … · O AKL ND AREA MAP VICINITY MAP AERIAL NORCAL LOGISTICS CENTER ... A joint venture with: PARKING • 392 auto parking stalls •
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
NORCAL LOGISTICS CENTER | STOCKTON, CA BUILDING 7 ±709,556 SF
BUILDING 4580 LOGISTICS DRIVE, STOCKTON
• ±709,556 SF Available Q3 2019
• Divisible to ±354,778 SF
• Dimensions: ±1,242 x ±570’
• Parcel Acres: ±42.48
• Office to suit
• 36’ minimum interior ceiling clearance
• ESFR fire suppression system
• 50’ x 54’ column spacing
• 60’ speed bays
• 7” DuctileCrete Engineered Slab
• 4,000 amps; 277/480 volts; 3 phase
• Designated Opportunity Zone
LOADING
• Cross-Load Design
• One hundred and fourteen (114) 9’ x 10’ dock door positions
• Four (4) 12’ x 14’ grade level doors
• 135’ truck court with 60’ concrete aprons
PARKING
• 392 auto parking stalls
• 181 trailer parking stalls
JOHN MCMANUSExecutive Managing Director+1 510 891 [email protected] #01129064
KEVIN DAL PORTOExecutive Managing Director+1 209 601 [email protected] #01212935
BUILDING 7 ±709,556 SF
T
30'
25'TYP.
24'
570'
25'
40'
PHASE IIBUILDING 7
709,556 SF
54' TYP.
50'
TYP
.
55'
60'
135'
135'
182'
75'
55'
75'
60'
ELEC
& P
UMP
RO
OM
OFFICE OFFICE
DETENTION
DETENTION
1242'
PG&E POWER POLE
PG&E POWER POLE
PG&E POWER POLE
S AUSTIN ROAD
MARIPOSA ROAD
8
This conceptual design is based upon a preliminary review ofentitlement requirements and on unverified and possiblyincomplete site and/or building information, and is intendedmerely to assist in exploring how the project might be developed.
NORTH
SHEET
08.20.2018
SNR15-0083-00NorCal Logistic Center
scheme: 15
Stockton, CA
Phase II - Building 70 30 60 150 300
1" =60'BUILDING
• ±709,556 SF Available Q3 2019
• Divisible to ±354,778 SF
• Dimensions: ±1,242 x ±570’
• Parcel Acres: ±42.48
• Office to suit
• 36’ minimum interior ceiling clearance
• ESFR fire suppression system
LOADING
• Cross-Load Design
• One hundred and fourteen (114) 9’ x 10’ dock door positions