Page 1: Nodal Program Update and SEWG Update COPS 5/10/2011 Jim Galvin.

Nodal Program Update and SEWG Update COPS 5/10/2011

Jim Galvin

Page 2: Nodal Program Update and SEWG Update COPS 5/10/2011 Jim Galvin.

2

Settlement Observations- Load Zone to Hub Mar/Apr 2011

Meeting Title (optional)Date

Load Zone/HUB RTSPP Period: Apr-11              Location Average Zone over HUB Comparison  

Location RTSPP Average Row Labels Average RTSPP Location Average RTSPP Zone over HUB DeltaHB_HOUSTON $32.90 LZ_HOUSTON $33.11 HB_HOUSTON $32.90 $0.21HB_NORTH $30.36 LZ_NORTH $30.41 HB_NORTH $30.36 $0.05HB_SOUTH $30.97 LZ_SOUTH $31.02 HB_SOUTH $30.97 $0.05HB_WEST $18.49 LZ_WEST $19.89 HB_WEST $18.49 $1.40LZ_HOUSTON $33.11  LZ_NORTH $30.41  LZ_SOUTH $31.02  LZ_WEST $19.89  LZ_LCRA $31.10  LZ_AEN $31.17  

LZ_CPS $31.42  Total Average $29.17                  

Load Zone/HUB RTSPP Period: Mar-11              Location Average Zone over HUB Comparison  

Location RTSPP Average Row Labels Average RTSPP Location Average RTSPP Zone over HUB DeltaHB_HOUSTON $28.03 LZ_HOUSTON $28.02 HB_HOUSTON $28.03 -$0.01HB_NORTH $28.40 LZ_NORTH $28.33 HB_NORTH $28.40 -$0.07HB_SOUTH $27.71 LZ_SOUTH $27.46 HB_SOUTH $27.71 -$0.25HB_WEST $16.27 LZ_WEST $17.02 HB_WEST $16.27 $0.75LZ_HOUSTON $28.02  LZ_NORTH $28.33  LZ_SOUTH $27.46  LZ_WEST $17.02  LZ_AEN $27.29  LZ_CPS $27.13  LZ_LCRA $27.86  Total Average $25.78                  

Page 3: Nodal Program Update and SEWG Update COPS 5/10/2011 Jim Galvin.

3

Cost to Serve Load- March 2011 v 2010

Cost to Serve Load Summary: Mar-11 $1.87 Mar-10 $2.322010 Congestion

Costs: Mar-10 $0.41      

  Mar-11  

  Arithmetic Average Related Charges      

    Non-Spin Rsrv Chrg

Reg Dn Srvc Chrg

Reg Up Srvc Chrg

Rspnsv Rsrv Srvc Chrg

Revenut Neutrality Adj  

  On-Peak $0.40 $0.15 $0.27 $0.91 $0.12  

  Off-Peak $0.39 $0.26 $0.27 $0.98 -$0.01  

   Average $0.40 $0.21 $0.27 $0.95 $0.05  

 Congestion Charges- 2010  

  Mar-10 Feb-10  

  Arithmetic Average Related Charges    Arithmetic Average Related

Charges  

    Non-Spin Rsrv Chrg

Reg Dn Srvc Chrg

Reg Up Srvc Chrg

Rspnsv Rsrv Srvc Chrg BENA  

OOM Energy

OOM Capacit

y

Local Balanci

ng Energy

Replace

ment Reserve

  On-Peak $0.41 $0.59 $0.56 $1.02 -$0.13 On-Peak $0.35 $0.06 $0.01 $0.00

  Off-Peak $0.28 $0.61 $0.48 $1.02 -$0.33 Off-Peak $0.21 $0.17 $0.00 $0.00

   Average $0.37 $0.60 $0.53 $1.02 -$0.20   Average $0.30 $0.10 $0.01 $0.00

Page 4: Nodal Program Update and SEWG Update COPS 5/10/2011 Jim Galvin.

4

Cost to Serve Load- April 2011 v 2010

Meeting Title (optional)Date

Cost to Serve Load Summary: Mar-11 $1.42 Apr-10 $1.13

2010 Congestion

Costs: Apr-10 $0.52      

  Apr-11  

  Arithmetic Average Related Charges      

    Non-Spin Rsrv Chrg

Reg Dn Srvc Chrg

Reg Up Srvc Chrg

Rspnsv Rsrv Srvc Chrg

Revenut Neutrality Adj  

  On-Peak $0.48 $0.11 $0.19 $0.77 $0.14  

  Off-Peak $0.27 $0.14 $0.20 $0.76 -$0.17  

   Average $0.36 $0.13 $0.20 $0.76 -$0.03  

  Congestion Charges- 2010  

  Apr-10 Apr-10  

  Arithmetic Average Related Charges     Arithmetic Average Related Charges  

    Non-Spin Rsrv Chrg

Reg Dn Srvc Chrg

Reg Up Srvc Chrg

Rspnsv Rsrv Srvc Chrg BENA  

OOM Energy

OOM Capacit

y

Local Balanci

ng Energy

Replace

ment Reserve

  On-Peak $0.15 $0.21 $0.35 $0.60 -$0.06 On-Peak $0.36 $0.11 $0.00 $0.00

  Off-Peak $0.05 $0.20 $0.25 $0.53 -$0.13 Off-Peak $0.35 $0.27 $0.00 $0.00

   Average $0.12 $0.20 $0.32 $0.57 -$0.08   Average $0.36 $0.16 $0.00 $0.00

Page 5: Nodal Program Update and SEWG Update COPS 5/10/2011 Jim Galvin.

5

• Cost to Serve Load March 2011-– AS $1.87 (March) $1.42 (April) down from February which was

$4.24 (primarily driven by Non-spin during winter weather events– BPD Uplift charges are a credit to Loads at $0.02 per MWh ( $370K

March and $440K April)– RUC Uplift Charges remain negligible as most charges are

assigned to entities short at RUC periods• Mar-2011 RUC payments $680 K• Apr-2011 RUC payments $3.0 M• RUC Continues to be assigned to entities short in the market

– Revenue Neutrality uplift to Loads normalizing from $0.05 /MWh (March) to $(0.03) /MWh April

Settlement Observations- Cost to Serve Load January

Page 6: Nodal Program Update and SEWG Update COPS 5/10/2011 Jim Galvin.

6

• ERCOT discussed the balance of year CRR Auction process which will auction CRRs for July – December 2011– Same format, unique invoice as this is separate from Monthly

Auction process• Market Default-

– ERCOT corrected previous schedule for uplift of recent market default

– Default will be allocated in September 2011, as opposed to spread out over September and October 2011

– Current uplift amount is approximately $732K

Settlement Updates to SEWG

Page 7: Nodal Program Update and SEWG Update COPS 5/10/2011 Jim Galvin.

7

NPRR 347

• NPRR 347- Single Daily Invoice and Counter Party Invoice, as submitted by ERCOT to assist in simplifying the settlement process by reducing statements and aggregating to a single invoice– SEWG and MCWG endorse the concept, NPRR just posted and

will be reviewed at next meeting• SEWG vetted NPRR 347 and provided comments to PRS for

consideration• Concern raised on confidentiality with the “Counter Party” Invoice as

entities with counter party relationships may not want other invoice totals or information shared across entities

• SEWG comments focused on maintaining the Single Daily invoice concept but to the entity level (QSE, Sub-QSE(s), CRRAH(s) etc.)

• PRS accepted comments and unanimously passed NPRR 347

Page 8: Nodal Program Update and SEWG Update COPS 5/10/2011 Jim Galvin.

8

SEWG Summary- Nodal Settlement Guide

• SEWG Leadership has secured volunteers to assist in adding detail to the Nodal Settlement Guide

– Harika Basaran (Vice Chair), Lori Williams (BTU), Alana Lewis (NRG) and Heather Boisseau (LCRA)

– Approach will be a “divide and conquer” and collaboration on individual efforts as we prepare the document for draft submittal to COPS

• SEWG will provide in June COPs meeting updated examples of documentation for comment and discussion

• SEWG will provide initial draft late summer (Aug target) for COPS consideration

Meeting Title (optional)Date

Page 9: Nodal Program Update and SEWG Update COPS 5/10/2011 Jim Galvin.

9

Extract Issues Update

• Events are on the decline and reports and extracts are posting timely with few exceptions

• ERCOT remains focused on stabilization of the systems• SEWG has requested that posting statistics no longer are required

for monthly update and will continue to track performance and issues via the monthly report from ERCOT IT

• ERCOT continues to post and monitor events as were done in Nodal and report to SEWG regularly at the link below:

http://www.ercot.com/services/sla/

Page 10: Nodal Program Update and SEWG Update COPS 5/10/2011 Jim Galvin.

10

Questions?

Meeting Title (optional)Date