NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic Products and Services National Geodetic Survey Height Modernization Partners Meeting, April 14, 2015 Presented by: Laura Rear McLaughlin, Mapping and Charting Program Manager, CO-OPS
17

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

Dec 19, 2015

Download

Documents

Rose Gallagher
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

Updating the International Great Lakes Datum

Plan OverviewCenter for Operational Oceanographic Products and Services

National Geodetic Survey

Height Modernization Partners Meeting, April 14, 2015

Presented by: Laura Rear McLaughlin, Mapping and Charting Program Manager,

CO-OPS

Page 2: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

What is the International Great Lakes Datum?

IGLD can be defined by the following three main attributes:

A water level reference zero:•IGLD (1955) - local mean sea level established at the tide gauge at Point-au-Pere, Quebec near the mouth of the Saint Lawrence River using observations from 1941-1956.   •IGLD (1985) - the reference zero was established using a combination of mean sea level data from a time period between 1970 and 1988 (a tidal datum epoch) from the gauge at Point-au-Pere and a newer station 5 km upstream at Rimouski, Quebec.  •The reference zero, if any, to be used for IGLD (2020) has not yet been established.

A defined time reference: •IGLD (1955) was established using water level observations and survey measurements for a base 7-year time period of 1952-1958.   •IGLD (1985) was similarly established using a base time period of 1982-1988.  •IGLD (2020) is envisioned to use the base observational time period of 2017-2023.

A system of elevations defined in terms of dynamic heights (as opposed to orthometric heights). •Dynamic heights are geopotential numbers scaled by a constant 980.6199 gals which is normal gravity computed on the Geodetic Reference System of 1980 (GRS 80) ellipsoid at 45 degrees latitude. Geopotential numbers are the difference in gravity potential measured between the bench mark and the geoid.

Page 3: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

Why update the International Great Lakes Datum?

Hydrology changes•Changing water levels over time

Vertical Crustal Movement•Uplift in the Northern Lakes•Vertical land subsidence in the southern lakes•Variation along the shorelines•Crustal movement studies indicate vertical movement can be neglected over 3-5 year timeframe, but overall adjustments should be made no more often than once every 20 years

•New Technology for positioning and water level collection

Page 4: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

▪ NOAAs Center for Operational Oceanographic Products and Services (CO-OPS) and the National Geodetic Survey (NGS) has drafted an IGLD 2020 update plan

▪ This plan will be presented for approval to the bilateral Coordinating Committee (CC) in May 2015

▪ IGLD is maintained under the auspices of Canada and the United States under the CC

The International Great Lakes Datum Project Plan

Page 5: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

NGS maintains the authoritative expertise of geodetic datums in the Lakes

In FY15 and FY20, collect GNSS observations at NWLON bench marks.

Continue to generate and evaluate accuracy of scientific geoid models

Ensure Lakes GRAV-D data is incorporated into the national geoid model.

Ensure that historical surface gravity measurements are consistent with GRAV-D airborne data.

NGS Role in IGLD

Page 6: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

NGS Role in IGLDDetermine surface gravity data needs Collaborate on crustal movement models Support transformations for IGLD (1985) and IGLD (2020) in the VDatum software. Provide tools to users to obtain accurate IGLD dynamic heightsDetermine and disseminate a consistent set of heights and velocities.Determine how existing and future leveling will be used.

Page 7: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

CO-OPS Role in IGLD▪ CO-OPS maintains water level and datum expertise in the

Great Lakes ▪ Determine Low Water Datum (Chart Datum) ▪ Determine which existing NWLON leveling data to Blue book

into the NGS database▪ Assist NGS with recons and field campaigns for GNSS surveys

in FY15 and FY20▪ Determine the appropriate use of Hydraulic Correctors▪ Prioritize the list of 140 potential seasonal gauges in small

ports and harbors. ▪ Support VDatum transformation models between IGLD (1985)

and IGLD (2020).

Page 8: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

▪FY15 Approach▪CO-OPS to work on three research

questions1. How do we prioritize seasonal gauge

locations?2. How do we determine Low Water

Datum, it has been static since 1933?3. Are hydraulic correctors necessary?

The International Great Lakes Datum

Page 9: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

▪ Approach: ▪ Use vetted prioritization scheme to rank seasonal gauges

▪ Proximity to international nodal points ▪ Residing in geodetically dynamic area ▪ Residing in hydraulic corrector dynamic area as indicated by

Milbert model (NGS) ▪ Locations identified by USACE high priority commercial port▪ Locations identified by USACE high priority recreational

port/harbor of refuge▪ Existing infrastructure (ie docks, piers). ▪ Proximity to NGS leveling line (BMs, tie into line to blue book). ▪ Proximity to high population density

How do we prioritize seasonal gauge locations?

Page 10: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

How do we determine Low Water Datum?

▪ Low Water Datum (Chart Datum) was determined in 1933 and has been held constant; limited documentation on how it was determined

▪ Elevations assigned to chart datum were updated in 1955 and 1985

▪ LWD will need to be updated relative to IGLD (2020) ▪ During the recent record low water conditions (2012-

2013), water levels were often below the existing LWD elevations for Superior, Huron and Michigan

▪ Do we redefine Low Water Datum or just assign it new numbers based on the IGLD 2020 update?

▪ Communicate Low Water Datum changes

Page 11: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

▪ IGLD (1985) was based on a massive surveying effort. ▪ HCs were used to correct for systematic survey errors.  ▪ Methods of calculating HCs for seasonal stations are

undocumented.▪ NGS Milbert interpolation model is a source for HC.▪ The Milbert model is known to have inaccuracies.▪ IGLD (2020) will rely on a GEOID model GPS reference

system instead of surveying and may remove the need of HCs.▪ If HC is required for IGLD (2020), is there a better spatial

Interpolation model to replace the NGS Milbert model for calculating HC.

Will Hydraulic Correctors be necessary for IGLD 2020 and how would they be calculated

Page 12: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

▪ NGS will work on three research questions▪ How accurately can Dynamic Heights be computed

without new leveling or new surface gravity in order to support IGLD (2020)

▪ How accurately can specially-designed, high-accuracy GNSS campaign-style surveys estimate crustal movement rates in the Great Lakes region.

▪ Can GNSS and geoid models replace leveling for water management of the Great Lakes and St. Lawrence Seaway?

The International Great Lakes Datum

Page 13: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

▪ FY15 Field Campaigns▪ GPS

▪ NGS to conduct Coordinated GPS

campaign in FY15 and FY20 with Canada▪ GPS measurements will occur at bench

mark locations at permanently operating water level gauges

▪ GPS measurements/leveling also at seasonal water level gauging sites

The International Great Lakes Datum

Page 14: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

▪ Water Level Field Campaigns▪Permanent Water Level Gauges

▪53 U.S. water level stations and 34 Canadian stations are foundation for IGLD update

▪Seasonal Gauges▪CO-OPS has identified about 140 additional potential

locations for seasonal water level gauging▪Funding will determine actual number▪Gauges are deployed for a single four

month period (June-September); will take

seven years to complete (2017-2023);

The International Great Lakes Datum

Page 15: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

The International Great Lakes Datum

Possible U.S. Seasonal Gauges

Page 16: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

Other research topics ▪ What is the reference zero, if any?▪ Are Gravity measurements needed at the master stations?▪ What the Master Station and Nodal Points for each Lake/Lake Pair

change?▪ Will we separate Huron/Michigan; they are now treated as one Lake pair?▪ What does the comparative analysis of past GNSS campaigns implicate?▪ How will anomalous water level variations at Green Bay and Saginaw be

handled?▪ How will Interconnecting Channel LWD steps be handled?▪ How will VDatum models in the Lakes be incorporated into IGLD?▪ Will Lidar and ultrasound altimetry be used for estimating water surface in

the Great Lakes region? ▪ Will Satellite altimetry be helpful in determining the lake levels?

Page 17: NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.

NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICESNOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES

QUESTIONS?

[email protected]

301-713-2981 x 128