1 0 1:50 0 10 5m 1:500 2m 0 4 2 0 1m 1:100 1:200 0 10m 20 0 20m 40 1:1250 1:2500 0.5m 200mm 0 400 40 0 20mm 1:2 100 0 1:5 0 200 100mm 1:10 50mm Scale Bars 1:20 Finishes Walls: Painted - White Floors: No flooring finish Living Room Garden Room Entrance Hall WC Utility Family Room Kitchen Pantry Snug WC Sitting Room Dining Room Hall Up Down Up Down Up Up MB-00-01 Up Up Up Plant MB-00-02 MB-00-03 MB-00-04 MB-00-05 MB-00-06 MB-00-07 MB-00-08 MB-00-09 MB-00-10 MB-00-11 MB-00-12 MB-00-13 MB-00-14 Finishes Walls: Painted - White Floors: Red Tile Finishes Walls: Painted - Cream Floors: Red Tile Finishes Walls: Painted - Cream Floors: Carpet - Cream Finishes Walls: Painted - Cream Floors: Tiles Finishes Walls: Painted - White Floors: White Tile Finishes Walls: Painted - Cream Floors: White Tile Finishes Walls: Painted - Light Green Floors: Grey/Green Tile Finishes Walls: Painted - White Floors: Grey/Green Tile Finishes Walls: Painted - White Floors: Grey Stone Tile Finishes Walls: Painted - Green Floors: No flooring finish Finishes Walls: Painted - White Floors: Grey Stone Tile Finishes Walls: Painted - Green Floors: Red Carpet Existing Ground Floor Plan Main Building Existing South Elevation Existing Internal South Elevation PR Project Title Sheet No. Sheet Scale 1:50 @ A1 0010 Sheet Title Main Building - Existing Ground Floor Plan and Elevation Jerrings Hall Farm 26 Martingate, Corsham, Wiltshire, SN13 0HL, Web: www.cms-group.co, Tel: 01249 701333 Reviewed By Project ID - Originator - Volume - Level - Type - Role - Number PR No. Date Revision Notes Suitability S4 SUITABLE FOR STAGE APPROVAL Code - Description 1831 CMS MB 00 DR A - - - - - - Drawn By Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed. . Project Client The Island Project Rev 2020/02/14 Date DR/CH TENDER
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
10
1:50
0 105m
1:500
2m0 4
20 1m
1:1001:200
0 10m 20
0 20m 40
1:12501:2500
0.5m
200mm0 400
400 20mm
1:2
1000
1:5
0 200100mm
1:10
50mm
Scale Bars1:20
FinishesWalls: Painted - WhiteFloors: No flooring finish
Project ID - Originator - Volume - Level - Type - Role - Number
PR
No. Date Revision Notes
Suitability
S4 SUITABLE FOR STAGE APPROVALCode - Description
1831 CMS MB 01 DR A- - - ---Drawn By
Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.
.
Project Client
The Island Project
Rev
2020/02/14Date
DR/CH
TENDER
10
1:50
0 105m
1:500
2m0 4
20 1m
1:1001:200
0 10m 20
0 20m 40
1:12501:2500
0.5m
200mm0 400
400 20mm
1:2
1000
1:5
0 200100mm
1:10
50mm
Scale Bars1:20
Dryer W/M
Hob
D/W
Fridge
Existing window removed. Form new door opening to achieve at least 800mm door leaf (historically this has been a door opening partially bricked up to form window). New double glazed hardwood timber door to match other existing doors. Made good externally and internally. Escape door, handle to override door lock. No handle externally.
Group Teaching Space
Lobby
WC
Upper kitchen andDining area
(Life skills teaching)DT
Kitchen
Small meetingroom and
parent lounge
WC(Visitor)
Board Room/ Large meeting room
Reception/ School Office
Hall
Up
Down
Up
Down
Up
Up
Up
UpUp
Up
Plant
Teaching Pods
Distraction freeteaching room
Corridor
New partition with glazed fire rated screen and FD30s door with VP.
New partition/doors
Existing glazing panels replaced with solid panels.
Existing glazing panels replaced with solid panels.
Strip out cupboards and coat hooks along wall opposite sink and make good
New kitchen with spaces for freestanding washing machine, dishwasher and condensing dryer. New oven, induction hob and cooker hood.
H/L bulkhead (services)
2no. existing rooflights to be replaced. Existing roof felt to be fully replaced.
Existing door to be rehung to open into MB-00-03.
Existing beam & tie rod boxed in.
Existing radiator relocatedExisting Front door retained. New externally mounted mechanical code lock.
New tea point with sink, base unit and wall shelf over.
(3 Desks)
Larder
Pipework to back of recess to be boxed in. Wall units, full height casing and 1no. base unit removed. Walls to be made good. Two client supplied freestanding cookers installed.
New staircase formed in location of previous floor alterations. Raised area removed and returned to original condition. Remove fake timber beam and replace ceiling.
Ex. raised area removed
New timber staircase.
F-C 2009
MB-00-01
MB
D-0
0-07
MB-00-03
MB-00-04
MB-00-05
MB-00-06
MB-00-07
MB-00-08
MB-00-09
MB-00-10
MB-00-11
MB-00-12
MB-00-13
MB-00-14
MB-00-15MB-00-16
Replace existing door leaf MBD-00-19 with new FD30s fire door. Non standard door leaf.
Existing radiator relocated.
MBD
-00-
01
MBD-00-02
MBD
-00-
03
MBD-00-04
MBD
-00-
05
MBD-00-06
MB-00-02
MBD
-00-
08
MBD-00-09
MBD-00-10
MB
D-0
0-1
1
MBD-00-12
FD30SVP
MB
D-0
0-1
3
MBD-00-14
MB
D-0
0-15
MB
D-0
0-1
6
MBD-00-17 MBD-00-
18 MBD-00-19
MB
D-0
0-20
MBD-00-21
MBD-00-22
MBD-00-23
MB
D-0
0-24
MBW-00-3
MBW-00-4
MBW-00-5
MBW-00-6
MBW-00-7
MBW-00-8
MBW-00-9MBW-00-10
MBW-00-11
MBW-00-12
MBW-00-13
MBW
-00-14
MBW-00-15 MBW-00-16MBW-00-17 MBW-00-18 MBW-00-19
MBW-00-20
MBW
-00-21
MBW
-00-22
MBW-00-23
MBW
-00-24
MBW-00-25MBW-00-26MBW-00-27MBW-00-28
MBW-00-01
MBW-00-02
Existing tiled floor removed completely and made good ready for new vinyl flooring.
Existing bush removed and flower bed edging relocated to clear door. Paving to be made good.
Lobby
Existing glazing panels replaced with solid panels.
Supply and fit 6no. double and 1no. single socket covers.
New externally mounted mechanical code lock.
New externally mounted mechanical code lock. Existing glazing
panels replaced with solid panels.
Door MB-00-09 replaced with solid door with VP.
Steps to have non slip contrasting nosings applied. Colour to be confirmed.
New externally mounted mechanical code lock.
All new and existing pipework to be boxed in. Access panels proved to valves etc.
Mirrored cabinet over sink to be removed. New cill to recess and make good.
New privacy lock
External steps cleaned and to have non slip strips applied. Colour to be confirmed.
Existing tiled floor removed completely and made good ready for new vinyl flooring.
New carpet to stairs with non slip contrasting nosings applied. Colour to be confirmed.
Existing floor to be cleaned and made good.
Replace existing door leaf MBD-00-23 with new FD30s fire door. Non standard door leaf.
Replace existing door leaf MBD-00-22 with new FD30s fire door. Non standard door leaf. New keyed lock (suited) with thumb turn internally.
Replace existing door leaf MBD-00-18 with new FD30s fire door. Non standard door leaf.
New privacy lock
New vinyl flooring to lobby and WC.
New keyed lock (suited) with thumb turn internally.
Lift and relay all lose tiles and make good.
Mechanical code lock kitchen side.
New externally mounted mechanical code lock.
Lift and relay 1no. lose floor tile and make good.
Carpet removed (stair carpet retained) and floor to be sealed and painted.
Existing door to cupboard understairs to be fitted with a keyed lock (suited).
Existing electrical cupboard to be fitted with a keyed lock (suited).
All new and existing pipework to be boxed in. Access panels proved to valves etc.
All new and existing pipework to be boxed in. Access panels proved to valves etc.
All new and existing pipework to be boxed in. Access panels proved to valves etc.Supply and fit 2no.
double socket covers
Glazing to window MBW-00-01 replaced with toughen and laminated glazing. New protection from falling bar for window.
Curtains retained
New keyed lock (suited) with thumb turn internally.
Bay window seat to be repaired and redecorated.
S-01
Building Regulations Note:
Part BWorks to existing building fabric and/or insertion of fire doors to provide fire compartmentation and protected means of escape all to be agreed with Building Control and Conservation Officers.
Part EWorks to existing building fabric and/or insertion of acoustic doors and/or acoustic ceiling treatments to provide adequate acoustic separation for adjacent room uses all to be agreed with Building Control and Conservation Officers.
Part FWorks to existing building fabric to provide ventilation extracts all to be agreed with Building Control and Conservation Officers.
Part KWorks to provide protection from falling to existing staircases/balconies and/or replacement of existing glazing to be agreed with Building Control and Conservation Officers.
Part LWorks to existing building fabric, including floors and roof to provide thermal efficiencies all to be agreed with Building Control and Conservation Officers.
Part MClient to provide Access Statement' to address accessibility issues for agreement with Building Control and Conservation Officers.
Project ID - Originator - Volume - Level - Type - Role - Number
GB/BC
No. Date Revision Notes
Suitability
S4 SUITABLE FOR STAGE APPROVALCode - Description
1831 CMS MB 00 DR A- - - ---Drawn By
P01
Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.
.
Project Client
The Island Project
Rev
2020/02/14Date
DR/CH
TENDER
Wall types added and key updated. Skirting note added. New stair design updated.P01 11/03/2020 BC
General note:Drawings to be read in conjunction with specification, room data sheets, room elevations, construction details and schedules.
Finishes Notes:- All rooms to be decorated walls and ceilings. All painted doors, architraves and skirtings to be decorated. Refer to room data sheets and specification for details.- Replacement floor finishes as per room data sheets and specification.- Wall tiling/whiterock as noted on room data sheets and room elevations.- Skirting: Any missing sections of skirting, resulting from demolition/removal of items, to replaced with new skirting with profile to match existing.
Project ID - Originator - Volume - Level - Type - Role - Number
PR
No. Date Revision Notes
Suitability
S4 SUITABLE FOR STAGE APPROVALCode - Description
1831 CMS MB XX DR A- - - ---Drawn By
Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.
.
Project Client
The Island Project
Rev
2020/02/14Date
DR/CH
TENDER
10
1:50
0 105m
1:500
2m0 4
20 1m
1:1001:200
0 10m 20
0 20m 40
1:12501:2500
0.5m
200mm0 400
400 20mm
1:2
1000
1:5
0 200100mm
1:10
50mm
Scale Bars1:20
Dryer W/M
Hob
D/W
Fridge
Existing window removed. Form new door opening to achieve at least 800mm door leaf (historically this has been a door opening partially bricked up to form window). New double glazed hardwood timber door to match other existing doors. Made good externally and internally. Escape door, handle to override door lock. No handle externally.
Group Teaching Space
Lobby
WC
Upper kitchen andDining area
(Life skills teaching)DT
Kitchen
Small meetingroom and
parent lounge
WC(Visitor)
Board Room/ Large meeting room
Reception/ School Office
Hall
Up
Down
Up
Down
Up
Up
Up
UpUp
Up
Plant
Teaching Pods
Distraction freeteaching room
Corridor
New partition with glazed fire rated screen and FD30s door with VP.
New partition/doors
Existing glazing panels replaced with solid panels.
Existing glazing panels replaced with solid panels.
Strip out cupboards and coat hooks along wall opposite sink and make good
New kitchen with spaces for freestanding washing machine, dishwasher and condensing dryer. New oven, induction hob and cooker hood.
H/L bulkhead (services)
2no. existing rooflights to be replaced. Existing roof felt to be fully replaced.
Existing door to be rehung to open into MB-00-03.
Existing beam & tie rod boxed in.
Existing radiator relocatedExisting Front door retained. New externally mounted mechanical code lock.
New tea point with sink, base unit and wall shelf over.
(3 Desks)
Larder
Pipework to back of recess to be boxed in. Wall units, full height casing and 1no. base unit removed. Walls to be made good. Two client supplied freestanding cookers installed.
New staircase formed in location of previous floor alterations. Raised area removed and returned to original condition. Remove fake timber beam and replace ceiling.
Ex. raised area removed
New timber staircase.
F-C 2009
MB-00-01
MB
D-0
0-07
MB-00-03
MB-00-04
MB-00-05
MB-00-06
MB-00-07
MB-00-08
MB-00-09
MB-00-10
MB-00-11
MB-00-12
MB-00-13
MB-00-14
MB-00-15MB-00-16
Replace existing door leaf MBD-00-19 with new FD30s fire door. Non standard door leaf.
Existing radiator relocated.
MBD
-00-
01
MBD-00-02
MBD
-00-
03
MBD-00-04
MBD
-00-
05
MBD-00-06
MB-00-02
MBD
-00-
08
MBD-00-09
MBD-00-10
MB
D-0
0-1
1
MBD-00-12
FD30SVP
MB
D-0
0-1
3
MBD-00-14
MB
D-0
0-15
MB
D-0
0-1
6
MBD-00-17 MBD-00-
18 MBD-00-19
MB
D-0
0-20
MBD-00-21
MBD-00-22
MBD-00-23
MB
D-0
0-24
MBW-00-3
MBW-00-4
MBW-00-5
MBW-00-6
MBW-00-7
MBW-00-8
MBW-00-9MBW-00-10
MBW-00-11
MBW-00-12
MBW-00-13
MBW
-00-14
MBW-00-15 MBW-00-16MBW-00-17 MBW-00-18 MBW-00-19
MBW-00-20
MBW
-00-21
MBW
-00-22
MBW-00-23
MBW
-00-24
MBW-00-25MBW-00-26MBW-00-27MBW-00-28
MBW-00-01
MBW-00-02
Existing tiled floor removed completely and made good ready for new vinyl flooring.
Existing bush removed and flower bed edging relocated to clear door. Paving to be made good.
Lobby
Existing glazing panels replaced with solid panels.
Supply and fit 6no. double and 1no. single socket covers.
New externally mounted mechanical code lock.
New externally mounted mechanical code lock. Existing glazing
panels replaced with solid panels.
Door MB-00-09 replaced with solid door with VP.
Steps to have non slip contrasting nosings applied. Colour to be confirmed.
New externally mounted mechanical code lock.
All new and existing pipework to be boxed in. Access panels proved to valves etc.
Mirrored cabinet over sink to be removed. New cill to recess and make good.
New privacy lock
External steps cleaned and to have non slip strips applied. Colour to be confirmed.
Existing tiled floor removed completely and made good ready for new vinyl flooring.
New carpet to stairs with non slip contrasting nosings applied. Colour to be confirmed.
Existing floor to be cleaned and made good.
Replace existing door leaf MBD-00-23 with new FD30s fire door. Non standard door leaf.
Replace existing door leaf MBD-00-22 with new FD30s fire door. Non standard door leaf. New keyed lock (suited) with thumb turn internally.
Replace existing door leaf MBD-00-18 with new FD30s fire door. Non standard door leaf.
New privacy lock
New vinyl flooring to lobby and WC.
New keyed lock (suited) with thumb turn internally.
Lift and relay all lose tiles and make good.
Mechanical code lock kitchen side.
New externally mounted mechanical code lock.
Lift and relay 1no. lose floor tile and make good.
Carpet removed (stair carpet retained) and floor to be sealed and painted.
Existing door to cupboard understairs to be fitted with a keyed lock (suited).
Existing electrical cupboard to be fitted with a keyed lock (suited).
All new and existing pipework to be boxed in. Access panels proved to valves etc.
All new and existing pipework to be boxed in. Access panels proved to valves etc.
All new and existing pipework to be boxed in. Access panels proved to valves etc.Supply and fit 2no.
double socket covers
Glazing to window MBW-00-01 replaced with toughen and laminated glazing. New protection from falling bar for window.
Curtains retained
New keyed lock (suited) with thumb turn internally.
Bay window seat to be repaired and redecorated.
S-01
Building Regulations Note:
Part BWorks to existing building fabric and/or insertion of fire doors to provide fire compartmentation and protected means of escape all to be agreed with Building Control and Conservation Officers.
Part EWorks to existing building fabric and/or insertion of acoustic doors and/or acoustic ceiling treatments to provide adequate acoustic separation for adjacent room uses all to be agreed with Building Control and Conservation Officers.
Part FWorks to existing building fabric to provide ventilation extracts all to be agreed with Building Control and Conservation Officers.
Part KWorks to provide protection from falling to existing staircases/balconies and/or replacement of existing glazing to be agreed with Building Control and Conservation Officers.
Part LWorks to existing building fabric, including floors and roof to provide thermal efficiencies all to be agreed with Building Control and Conservation Officers.
Part MClient to provide Access Statement' to address accessibility issues for agreement with Building Control and Conservation Officers.
Project ID - Originator - Volume - Level - Type - Role - Number
GB/BC
No. Date Revision Notes
Suitability
S4 SUITABLE FOR STAGE APPROVALCode - Description
1831 CMS MB 00 DR A- - - ---Drawn By
P01
Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.
.
Project Client
The Island Project
Rev
2020/02/14Date
DR/CH
TENDER
Wall types added and key updated. Skirting note added. New stair design updated.P01 11/03/2020 BC
General note:Drawings to be read in conjunction with specification, room data sheets, room elevations, construction details and schedules.
Finishes Notes:- All rooms to be decorated walls and ceilings. All painted doors, architraves and skirtings to be decorated. Refer to room data sheets and specification for details.- Replacement floor finishes as per room data sheets and specification.- Wall tiling/whiterock as noted on room data sheets and room elevations.- Skirting: Any missing sections of skirting, resulting from demolition/removal of items, to replaced with new skirting with profile to match existing.
New keyed lock (suited) with thumb turn internally.
Existing carpet removed and replaced with new carpet tiles.
Existing cupboard removed and made good
Existing carpet removed and replaced with new carpet tiles.
New Door FD30S with vision panel. New keyed lock (suited) with thumb turn internally.
Replace and repair ceiling due to damp damage.Existing carpet removed and
replaced with new carpet tiles.
New partition and FD30S door with vision panel and magnetic hold open. Cut around existing boxing in.
Existing carpet removed and replaced with new carpet tiles.
New Door FD30S with vision panel.
Remove curtain pole and make good.
Supply and fit window restrictor to existing frame.
Fit new panic gear to external door.
Supply and fit new timber handrail to inside of stair.
Existing carpet removed and replaced with new carpet tiles.
2no. Ex. rooflights to be replaced. Existing roof felt to be fully replaced.
Existing flooring removed and replaced with new vinyl.
New vinyl flooring to MB-01-05, MB-01-16 and MB-01-17
Curtain pole retained
New full height partition to protect stair edge.
Existing carpet removed and replaced with new carpet tiles.
New staircase
Building Regulations Note:
Part BWorks to existing building fabric and/or insertion of fire doors to provide fire compartmentation and protected means of escape all to be agreed with Building Control and Conservation Officers.
Part EWorks to existing building fabric and/or insertion of acoustic doors and/or acoustic ceiling treatments to provide adequate acoustic separation for adjacent room uses all to be agreed with Building Control and Conservation Officers.
Part FWorks to existing building fabric to provide ventilation extracts all to be agreed with Building Control and Conservation Officers.
Part KWorks to provide protection from falling to existing staircases/balconies and/or replacement of existing glazing to be agreed with Building Control and Conservation Officers.
Part LWorks to existing building fabric, including floors and roof to provide thermal efficiencies all to be agreed with Building Control and Conservation Officers.
Part MClient to provide Access Statement' to address accessibility issues for agreement with Building Control and Conservation Officers.
New wall - Type 1
Key
New wall - Type 2
New wall - Type 3
General note:Drawings to be read in conjunction with specification, room data sheets, room elevations, construction details and schedules.
Finishes Notes:- All rooms to be decorated walls and ceilings. All painted doors, architraves and skirtings to be decorated. Refer to room data sheets and specification for details.- Replacement floor finishes as per room data sheets and specification.- Wall tiling/whiterock as noted on room data sheets and room elevations.- Skirting: Any missing sections of skirting, resulting from demolition/removal of items, to replaced with new skirting with profile to match existing.
Project ID - Originator - Volume - Level - Type - Role - Number
GB/BC
No. Date Revision Notes
Suitability
S4 SUITABLE FOR STAGE APPROVALCode - Description
1831 CMS MB 02 DR A- - - ---Drawn By
P01
Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.
.
Project Client
The Island Project
Rev
2020/02/14Date
DR/CH
TENDER
Wall types added and key updated. New stairs amended. Skirting note added.P01 11/03/2020 BC
Resource RoomProject Office
WC
Down New staircase
MB-02-01
MB-02-02
MB-02-03
F-F Height 1228
New carpet tile.
New vinyl flooring.
Building Regulations Note:
Part BWorks to existing building fabric and/or insertion of fire doors to provide fire compartmentation and protected means of escape all to be agreed with Building Control and Conservation Officers.
Part EWorks to existing building fabric and/or insertion of acoustic doors and/or acoustic ceiling treatments to provide adequate acoustic separation for adjacent room uses all to be agreed with Building Control and Conservation Officers.
Part FWorks to existing building fabric to provide ventilation extracts all to be agreed with Building Control and Conservation Officers.
Part KWorks to provide protection from falling to existing staircases/balconies and/or replacement of existing glazing to be agreed with Building Control and Conservation Officers.
Part LWorks to existing building fabric, including floors and roof to provide thermal efficiencies all to be agreed with Building Control and Conservation Officers.
Part MClient to provide Access Statement' to address accessibility issues for agreement with Building Control and Conservation Officers.
New wall - Type 1
Key
New wall - Type 2
New wall - Type 3
General note:Drawings to be read in conjunction with specification, room data sheets, room elevations, construction details and schedules.
Finishes Notes:- All rooms to be decorated walls and ceilings. All painted doors, architraves and skirtings to be decorated. Refer to room data sheets and specification for details.- Replacement floor finishes as per room data sheets and specification.- Wall tiling/whiterock as noted on room data sheets and room elevations.- Skirting: Any missing sections of skirting, resulting from demolition/removal of items, to replaced with new skirting with profile to match existing.
10
1:50
0 105m
1:500
2m0 4
20 1m
1:1001:200
0 10m 20
0 20m 40
1:12501:2500
0.5m
200mm0 400
400 20mm
1:2
1000
1:5
0 200100mm
1:10
50mm
Scale Bars1:20
Proposed East Elevation
Existing glazing panels replaced with solid panels.
Existing front door retained. New externally mounted mechanical code lock.New externally mounted
mechanical code lock.
Main Building Elevations
Proposed West Elevation
Existing glazing panels replaced with solid panels.
Project ID - Originator - Volume - Level - Type - Role - Number
GB/BC
No. Date Revision Notes
Suitability
S4 SUITABLE FOR STAGE APPROVALCode - Description
1831 CMS MB XX DR A- - - ---Drawn By
Copyright. Check all dimensions on site. This drawing is only to be used on the site for which designed.
.
Project Client
The Island Project
Rev
2020/02/14Date
DR/CH
TENDER
Proposed Internal South Elevation
Glazing to window MBW-00-01 replaced with toughen and laminated glazing. New protection from falling bar for window.
New externally mounted mechanical code lock.
Proposed South Elevation
Proposed Internal North Elevation
Existing window removed. Form new door opening to achieve at least 800mm door leaf (historically this has been a door opening partially bricked up to form window). New double glazed hardwood timber door to match other existing doors. Made good externally and internally. Escape door, handle to override door lock. No handle externally.
10
1:50
0 105m
1:500
2m0 4
20 1m
1:1001:200
0 10m 20
0 20m 40
1:12501:2500
0.5m
200mm0 400
400 20mm
1:2
1000
1:5
0 200100mm
1:10
50mm
Scale Bars1:20
Dryer W/M
Hob
D/W
Fridge
Up
Down
Up
Down
Up
Up
Up
UpUp
Up
H/L bulkhead (services)
F-C 2009
MB
D-0
0-07
MBD
-00-
01
MBD-00-02
MBD
-00-
03
MBD-00-04
MBD
-00-
05
MBD-00-06
MBD
-00-
08
MBD-00-09
MBD-00-10
MB
D-0
0-1
1
MB
D-0
0-1
3
MBD-00-14
MB
D-0
0-15
MB
D-0
0-1
6
MBD-00-17 MBD-00-
18 MBD-00-19
MB
D-0
0-20
MBD-00-22
MBD-00-23
MB
D-0
0-24
MBW-00-3
MBW-00-4
MBW-00-5
MBW-00-6
MBW-00-7
MBW-00-8
MBW-00-9MBW-00-10
MBW-00-11
MBW-00-12
MBW-00-13
MBW
-00-14
MBW-00-15 MBW-00-16MBW-00-17 MBW-00-18 MBW-00-19
MBW-00-20
MBW
-00-21
MBW
-00-22
MBW-00-23
MBW
-00-24
MBW-00-25MBW-00-26MBW-00-27MBW-00-28
MBW-00-01
MBW-00-02
Strip out cupboards and coat hooks along wall opposite sink and make good.
Strip out existing cupboards.Strip out water damaged floor boards.Strip out water damaged ceiling.Strip out existing sanitaryware and associated boxing in.