Top Banner
Title page Alcatel-Lucent 9326 digital 2U Node B V2 | V7.1 Maintenance Guide NN-20500-204 ISSUE 4.05 MAY 2010 Alcatel-Lucent – Proprietary Use pursuant to applicable agreements Use pursuant to applicable agreements
88
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Title page

Alcatel-Lucent 9326

digital 2U Node B V2 | V7.1

Maintenance Guide

NN-20500-204

ISSUE 4.05

MAY 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

Use pursuant to applicable agreements

Page 2: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Legal notice

Legal notice

Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All other trademarks are the property of their respective

owners.

The information presented is subject to change without notice. Alcatel-Lucent assumes no responsibility for inaccuracies contained herein.

Copyright © 2010 Alcatel-Lucent. All rights reserved.

Contains proprietary/trade secret information which is the property of Alcatel-Lucent and must not be made available to, or copied or used by anyone outside

Alcatel-Lucent without its written authorization.

Not to be used or disclosed except in accordance with applicable agreements.

Use pursuant to applicable agreements

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

Page 3: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Contents

About this document

Purpose ............................................................................................................................................................................................. ixix

Reason for revision ...................................................................................................................................................................... ixix

New in this release ....................................................................................................................................................................... ixix

Intended audience ......................................................................................................................................................................... ixix

Supported systems ........................................................................................................................................................................ ixix

How to use this document ........................................................................................................................................................... xx

Safety information ......................................................................................................................................................................... xx

Prerequisites ..................................................................................................................................................................................... xx

Conventions used ........................................................................................................................................................................... xx

Related information ....................................................................................................................................................................... xx

Document support ........................................................................................................................................................................ xixi

Technical support .......................................................................................................................................................................... xixi

How to order ................................................................................................................................................................................... xixi

How to comment ........................................................................................................................................................................... xixi

1 Roadmap to Distributed Base Stations documentation

Overview ....................................................................................................................................................................................... 1-11-1

Roadmap to Distributed Base Stations documentation ................................................................................................ 1-21-2

2 Safety statements

Overview ....................................................................................................................................................................................... 2-12-1

Structure of safety statements ................................................................................................................................................ 2-22-2

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

iii

Page 4: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

3 Corrective maintenance activity

Overview ....................................................................................................................................................................................... 3-13-1

Corrective maintenance activity ........................................................................................................................................... 3-23-2

4 9326 d2U V2 introduction

Overview ....................................................................................................................................................................................... 4-14-1

9326 d2U V2 introduction ...................................................................................................................................................... 4-24-2

5 9326 d2U V2 hardware presentation

Overview ....................................................................................................................................................................................... 5-15-1

9326 d2U V2 hardware presentation .................................................................................................................................. 5-25-2

6 9326 d2U V2 power up and power down procedures

Overview ....................................................................................................................................................................................... 6-16-1

Powering up a 9326 d2U V2 ................................................................................................................................................. 6-26-2

Powering down a 9326 d2U V2 ........................................................................................................................................... 6-36-3

7 9326 d2U V2 corrective maintenance procedures

Overview ....................................................................................................................................................................................... 7-17-1

Replacing the digital shelf equipment

Overview ....................................................................................................................................................................................... 7-27-2

Replacing an iCEM-U .............................................................................................................................................................. 7-37-3

Replacing an xCEM-U ............................................................................................................................................................. 7-67-6

Replacing the iCCM-U ............................................................................................................................................................ 7-97-9

Replacing the xCCM-U ........................................................................................................................................................ 7-147-14

Replacing an optical transceiver ........................................................................................................................................ 7-207-20

Replacing the fans rack (48V) ............................................................................................................................................ 7-237-23

Replacing the pre-cabled 9326 d2U V2 rack ................................................................................................................ 7-287-28

Replacing the optional equipment

Overview .................................................................................................................................................................................... 7-387-38

Replacing the External Alarm module ............................................................................................................................. 7-397-39

Replacing the LPPCM module ........................................................................................................................................... 7-417-41

Contents

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

iv Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 5: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

A Product conformance statements

Overview ...................................................................................................................................................................................... A-1A-1

European regulatory requirement compliance ............................................................................................................... A-2A-2

North American regulatory requirement compliance .................................................................................................. A-4A-4

Compliances for other regions/countries ......................................................................................................................... A-7A-7

Operating conditions ............................................................................................................................................................... A-8A-8

Cable specifications ................................................................................................................................................................. A-9A-9

Product labeling ...................................................................................................................................................................... A-10A-10

Contents

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

v

Page 6: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai
Page 7: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

List of figures

1-1 Roadmap to Distributed Base Stations documentation ................................................................................ 1-31-3

4-1 Outside view of the 9326 d2U V2 ....................................................................................................................... 4-34-3

5-1 9326 d2U V2 front view (with iCCM-U) ......................................................................................................... 5-25-2

5-2 9326 d2U V2 front view (with xCCM-U) ........................................................................................................ 5-25-2

7-1 iCEM-U front panel .................................................................................................................................................. 7-37-3

7-2 xCEM-U front panel ................................................................................................................................................. 7-67-6

7-3 iCCM-U board front panel ..................................................................................................................................... 7-97-9

7-4 xCCM-U-4E1 configuration front panel ........................................................................................................ 7-147-14

7-5 xCCM-U-GE configuration front panel .......................................................................................................... 7-147-14

7-6 Location of optical connectors in the 9326 d2U V2 ................................................................................... 7-217-21

7-7 Inserting an SFP transceiver in the iCCM-U ................................................................................................ 7-227-22

7-8 9326 d2U V2 front view (with iCCM-U) ....................................................................................................... 7-237-23

7-9 9326 d2U V2 front view (with xCCM-U) ...................................................................................................... 7-237-23

7-10 Extracting the fans rack ........................................................................................................................................ 7-257-25

7-11 Fans rack .................................................................................................................................................................... 7-257-25

7-12 9326 d2U V2 front view (with iCCM-U) ....................................................................................................... 7-287-28

7-13 9326 d2U V2 front view (with xCCM-U) ...................................................................................................... 7-287-28

7-14 Location of the management sticker ................................................................................................................ 7-307-30

7-15 Front panel of the External Alarm module .................................................................................................... 7-397-39

7-16 LPPCM module front panel ................................................................................................................................ 7-417-41

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

vii

Page 8: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai
Page 9: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

About this documentAbout this document

Purpose

The purpose of this document is to describe corrective maintenance procedures applicable

to the 9326 d2U V2 rack.

Reason for revision

The reissue reasons are:

Issue number Issue date Reason for reissue

4.05 May 2010 Standard issue

4.04 March 2010 Preliminary issue

4.03 February 2010 Preliminary issue

4.02 November 2009 Preliminary issue

4.01 October 2009 Draft issue

New in this release

New features:

• 74759 Gigabit Ethernet MDA for xCCM, see “Replacing the xCCM-U” (p. 7-14)

Important! The availability of the features listed above on the hardware equipment

should be checked with your Alcatel-Lucent representative.

Other changes:

• Reformat to comply with current documentation standards

Intended audience

The audience for this document is Operations and maintenance personnel and those who

want to know the principles of 9326 d2U V2 maintenance.

Supported systems

This document applies to Alcatel-Lucent W-CDMA V7.1 system release.

...................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

ix

Page 10: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

How to use this document

No specific recommendation applies regarding the way readers should read this

document.

Safety information

For your safety, this document contains safety statements. Safety statements are given at

points where risks of damage to personnel, equipment, and operation may exist. Failure to

follow the directions in a safety statement may result in serious consequences.

Prerequisites

It is recommended that readers become familiar with the following documents:

• Alcatel-Lucent 9326 digital 2U Node B V2 - Technical Description, NN-20500-203

• Alcatel-Lucent 93xx Node B – Commissioning and Fault Management User Manual:

TIL, NN-20500-019

Conventions used

Vocabulary conventions

For a list of terms used in this document, see Alcatel-Lucent W-CDMA System -

Terminology, NN-20500-002.

Typographical conventions

The following typographical conventions are used in this document:

Appearance Description

Italicized text Emphasized information

graphical user interface text Text that is displayed in a graphical user interface or

in a hardware label

Document reference, reference number Related document that is referenced in the document

Related information

For information on subjects related to the content of this document, refer to the

documents listed in the following table:

Refer to this document At this location For more information on

Alcatel-Lucent W-CDMA

System - Terminology,

NN-20500-002

http://support.alcatel-

lucent.com.

Terms used in Alcatel-Lucent

W-CDMA documents.

Alcatel-Lucent 9326 digital

2U Node B V2 - Technical

Description, NN-20500-203

http://support.alcatel-

lucent.com.

The Alcatel-Lucent 9326

digital 2U Node B V2:

• Basic characteristics

• Hardware description

About this document

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

x Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 11: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Refer to this document At this location For more information on

Alcatel-Lucent 9353

Wireless Management

System - Node B Alarms

Reference Guide for 9311,

9312, 9322, 9326, 9332

Node B, NN-20500-018P1

http://support.alcatel-

lucent.com.

Alarm descriptions and

maintenance actions required

for Alcatel-Lucent Node Bs.

Alcatel-Lucent 9353

Wireless Management

System - User Guide,

NN-20500-032

http://support.alcatel-

lucent.com.

How to perform commands

available in the 9353 Wireless

Management System (WMS)

Graphical User Interface

(GUI).

Alcatel-Lucent 93xx Node B

– Commissioning and Fault

Management User Manual:

TIL, NN-20500-019

http://support.alcatel-

lucent.com.

How to perform the Node B

installation, commissioning

and maintenance tasks using

the Node B TIL (Terminal for

Local Installation) tool.

Alcatel-Lucent W-CDMA

System Safety Guide,

401-382-880

http://support.alcatel-

lucent.com.

Safety guidelines and the

catalog of hazard statements

that appear in the

Alcatel-Lucent W-CDMA

customer documents.

Document support

For support in using this or any other Alcatel-Lucent document, contact Alcatel-Lucent at

one of the following telephone numbers:

• 1-888-582-3688 (for the United States)

• 1-317-377-8618 (for all other countries)

Technical support

For technical support, contact your local Alcatel-Lucent customer support team. See the

Alcatel-Lucent Support web site (http://www.alcatel-lucent.com/support/) for contact

information.

How to order

To order Alcatel-Lucent documents, contact your local sales representative or use Online

Customer Support (OLCS) (http://support.alcatel-lucent.com)

How to comment

To comment on this document, go to the Online Comment Form (http://infodoc.

alcatel-lucent.com/comments/enus/) or e-mail your comments to the Comments Hotline

([email protected]).

About this document

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

xi

Page 12: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai
Page 13: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

1 1Roadmap to Distributed

Base Stations

documentation

Overview

Purpose

This chapter provides the roadmap for Distributed Base Stations documentation.

Contents

Roadmap to Distributed Base Stations documentation 1-2

...................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

1-1

Page 14: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Roadmap to Distributed Base Stations documentation

The following figure shows where the current document stands within the W-CDMA

customer documentation.

For a global view of the W-CDMA customer documentation, see the Roadmap chapter in:

• Alcatel-Lucent W-CDMA System - Document Collection Overview, NN-20500-050

• Alcatel-Lucent W-CDMA System - Access Network Elements Overview,

NN-20500-233

Roadmap to Distributed Base Stations documentation Roadmap to Distributed Base Stations documentation

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

1-2 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 15: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Figure 1-1 Roadmap to Distributed Base Stations documentation

Roadmap to Distributed Base Stations documentation Roadmap to Distributed Base Stations documentation

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

1-3

Page 16: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai
Page 17: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

2 2Safety statements

Overview

Purpose

This chapter provides information on the structure of safety statements which may arise

in the course of your work.

Contents

Structure of safety statements 2-2

...................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

2-1

Page 18: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Structure of safety statements

Overview

Safety statements describe the safety risks relevant while performing tasks on

Alcatel-Lucent products during deployment and/or use. Failure to avoid the hazards may

have serious consequences.

General structure

Safety statements include the following structural elements:

Item Structure element Purpose

1 Safety alert symbol Indicates the potential for personal injury

(optional)

2 Safety symbol Indicates hazard type (optional)

3 Signal word Indicates the severity of the hazard

4 Hazard type Describes the source of the risk of damage or

injury

5 Safety message Consequences if protective measures fail

6 Avoidance message Protective measures to take to avoid the hazard

7 Identifier The reference ID of the safety statement

(optional)

Signal words

The signal words identify the hazard severity levels as follows:

Signal word Meaning

DANGER Indicates an extremely hazardous situation which, if not avoided, will

result in death or serious injury.

Lifting this equipment by yourself can result in injurydue to the size and weight of the equipment.

Always use three people or a lifting device to transportand position this equipment. [ABC123]

CAUTION

Lifting hazard

B C D

E F

G

H

Safety statements Structure of safety statements

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

2-2 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 19: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Signal word Meaning

WARNING Indicates a hazardous situation which, if not avoided, could result in

death or serious injury.

CAUTION Indicates a hazardous situation which, if not avoided, could result in

minor or moderate injury.

NOTICE Indicates a hazardous situation not related to personal injury.

Safety statements Structure of safety statements

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

2-3

Page 20: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai
Page 21: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

3 3Corrective maintenance

activity

Overview

Purpose

This chapter describes the corrective maintenance activity applicable to the 9326 d2U V2

rack.

Contents

Corrective maintenance activity 3-2

...................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

3-1

Page 22: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Corrective maintenance activity

Corrective maintenance

The network maintenance is based on the supervision of the network, by using the OAM

graphical interface. For more information, refer to Alcatel-Lucent 9353 Wireless

Management System - User Guide, NN-20500-032.

It is also based on the identification and replacement of faulty items of equipment, using

the alarms.

The process is divided into the following two steps:

• Locating and identifying the faulty items of equipment, by using the information

provided in Alcatel-Lucent 9353 Wireless Management System - Node B Alarms

Reference Guide for 9311, 9312, 9322, 9326, 9332 Node B, NN-20500-018P1

• Replacing the faulty items of equipment, by using the replacement procedures given

in this document

Note: The iModules replacement procedures described in this guide are based on the

following assumptions:

• Your 9326 d2U V2 is equipped with the following digital modules:

– One iCCM-U upgraded with the specific adapter board and front panel (iCCM-U

V2)

– One xCEM-U (mandatory) and possibly up to two additional xCEMs-U

– Possibly up to two iCEMs-U upgraded with the specific adapter boards and front

panels (iCEMs-U V2)

• As spare parts, you ordered iCEMs-U V2 and iCCMs-U V2 modules (order codes:

3JR08057AA and 3JR08056AA).

Replacing the digital shelf equipment

Procedure Order Code Impact on service

“Replacing an iCEM-U”

(p. 7-3)

3JR08057AA Loss of capacity or loss of service

(depending on the number of CEMs in

the digital shelf)

“Replacing an xCEM-U”

(p. 7-6)

300986049 Loss of capacity or loss of service

(depending on the number of CEMs in

the digital shelf)

“Replacing the iCCM-U”

(p. 7-9)

3JR08056AA Loss of service on the Remote Radio

device(s) associated with the iCCM-U

being replaced

“Replacing the xCCM-U”

(p. 7-14)

3JR20038AA Loss of service on the Remote Radio

device(s) associated with the xCCM-U

being replaced

Corrective maintenance activity Corrective maintenance activity

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-2 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 23: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Procedure Order Code Impact on service

“Replacing an optical

transceiver” (p. 7-20)

Single-Mode (SM):

NTU850HA

Loss of service on the Remote Radio

device associated with the optical

transceiver being replacedMulti-Mode (MM):

NTU850HM

“Replacing the fans rack

(48V)” (p. 7-23)

3JR08021AA Service interruption

“Replacing the pre-cabled

9326 d2U V2 rack”

(p. 7-28)

3JR08067AA Service interruption

Replacing the optional equipment

Procedure Order Code Impact on service

“Replacing the LPPCM

module” (p. 7-41)

NTU870GM Service interruption

“Replacing the External

Alarm module” (p. 7-39)

NTU870GA None

Description of a replacement procedure

A replacement procedure is divided into the following parts:

• The title

• The main body with the following information:

– The intervention time

– The tools required

– The impact of the procedure, if necessary

– The step-by-step actions of the procedure

One or more figures are provided to help you execute the actions. They show the FRU

schematically and its location in the cabinet.

Intervention restrictions

There may be a lapse of time between the identification of the alarm at the Access OAM

Graphic User Interface (GUI) and the time you arrive at the site.

You must be synchronized with the access network controller or system administrator (by

telephone) before an on-site intervention, in the following cases:

• Isolating procedures

• Completion of an on-site intervention

• Return to service procedure

Corrective maintenance activity Corrective maintenance activity

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

3-3

Page 24: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

General personnel safety instructions

The personnel must obey the safety instructions specific to the installation site:

• Rules concerning the premises (see instructions posted on site or in the building)

• Rules linked to general personnel safety instructions

The personnel working on the cabinet must be authorized to work according to security

standards.

Equipment safety instructions

The 9326 d2U V2 normally operates when the external temperature is between –5°C and

+65°C.

Corrective maintenance activity Corrective maintenance activity

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

3-4 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 25: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

4 49326 d2U V2 introduction

Overview

Purpose

This chapter introduces the 9326 d2U V2.

Contents

9326 d2U V2 introduction 4-2

...................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

4-1

Page 26: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

9326 d2U V2 introduction

The 9326 d2U V2 is the enhanced 9326 d2U rack supporting xModules (xCEM-U,

xCCM-U). It is designed to be connected to one of the following products via optical

fiber links:

• RRH60-21

• RRH40-AWS

• RRH40-21

• RRH40-08

• RRH40-19

• RRH20-21

• 9332 rCompact

The iModules (iCEM-U, iCCM-U) can be plugged in this 9326 d2U V2 rack, using

specific adapter boards and front panels.

xCEM-U and iCEM-U modules can be mixed inside the 9326 d2U V2 rack. The 9326

d2U V2 rack is factory-equipped with one xCCM-U or one iCCM-U (in slot 1), one

xCEM-U (in slot 2) and two fillers. Depending on the capacity requirements, the 9326

d2U V2 rack can host two xCEMs-U, two iCEMs-U, or one xCEM-U and one iCEM-U

in place of the two fillers (slot 3 and slot 4).

The Alcatel-Lucent Remote Radio solution improves flexibility for deploying mobile

broadband Node Bs in space-constrained locations. It is particularly suited to

macro-cellular applications in dense areas, where site acquisition is difficult, and on sites

where installation constraints prevent the use of legacy Node Bs.

Compared to legacy Node B site deployment, the Remote Radio solution provides the

following benefits:

• Reduced volume, weight, footprint, acoustic noise, and power consumption

• Reduced cost of feeder paths from the Node B to the antenna

• Increased RF power per carrier at the antenna feeder

• Reduced radio loss with use of the remote RF block concept, which eliminates the

distance between the radio amplifier and the antenna

The Remote Radio solution provides for the UMTS system:

• The means of communication between a User Equipment (UE) and a network using

Transport Channels

• Physical layer channels, which are necessary to synchronize the downlink and

perform cell selection/reselection and handover preparation

• Measurement information to the RNC for radio resource management (handover,

power control)

The 9326 d2U V2 provides up to eight E1/T1 with Inversion Multiplexing ATM (IMA) or

Drop-and-Insert capability (fractional E1/T1). The 9326 d2U V2 also supports

multi-PCM without IMA.

9326 d2U V2 introduction 9326 d2U V2 introduction

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

4-2 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 27: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

The 9326 d2U V2 delivers high UMTS radio performances and supports the enhanced

High Speed Downlink Packet Access (HSDPA) and High Speed Uplink Packet Access

(HSUPA) solutions through easy software upgrade.

The 9326 d2U V2 is compliant with the Common Public Radio Interface (CPRI).

9326 d2U V2 enclosure

The 9326 d2U V2 provides the operators with a suited solution whatever the site

constraints.

The 9326 d2U V2 can be installed in a standalone indoor mode or in an existing indoor or

outdoor Alcatel-Lucent 9100 Multi-Standard Base Station cabinet for multi-standard

configuration.

Moreover, the 9326 d2U V2 can be integrated in a small or a medium Power Supply Unit

(PSU) outdoor cabinet.

The following figure shows an outside view of the 9326 d2U V2.

Figure 4-1 Outside view of the 9326 d2U V2

9326 d2U V2 introduction 9326 d2U V2 introduction

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

4-3

Page 28: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai
Page 29: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

5 59326 d2U V2 hardware

presentation

Overview

Purpose

This chapter describes the hardware of the 9326 d2U V2 rack.

Contents

9326 d2U V2 hardware presentation 5-2

...................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

5-1

Page 30: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

9326 d2U V2 hardware presentation

The 9326 d2U V2 is built around the following components:

• A mechanical enclosure (including two fans), compatible with standard 19-inch rack

installation

• A digital shelf including the digital modules and the associated digital backplane

• A commissioning module located on the right hand side of the digital shelf

The following figure shows a front view of the 9326 d2U V2 equipped with iCCM-U.

The following figure shows a front view of the 9326 d2U V2 equipped with xCCM-U.

Figure 5-1 9326 d2U V2 front view (with iCCM-U)

Figure 5-2 9326 d2U V2 front view (with xCCM-U)

9326 d2U V2 hardware presentation 9326 d2U V2 hardware presentation

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

5-2 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 31: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

6 69326 d2U V2 power up

and power down

procedures

Overview

Purpose

This chapter describes how to power up and power down the 9326 d2U V2.

Contents

Powering up a 9326 d2U V2 6-2

Powering down a 9326 d2U V2 6-3

...................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

6-1

Page 32: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Powering up a 9326 d2U V2

Perform the following procedure to power up a 9326 d2U V2.

Initial check

On the RUC module, check that the power switch is in the "O" position.

Procedure

...................................................................................................................................................................................................

1 At the operator DC power supply, put the site circuit breaker of the 9326 d2U V2 in the

"ON" position.

...................................................................................................................................................................................................

2 On the RUC module, put the power switch in the "1" position.

...................................................................................................................................................................................................

3 Check that the fans are starting up.

...................................................................................................................................................................................................

4 On the iCCM-U/xCCM-U and on each iCEM-U/xCEM-U, check that:

• The green LED is ON.

• The red LED is OFF.

9326 d2U V2 power up and power down procedures Powering up a 9326 d2U V2

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

6-2 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

E N D O F S T E P S...................................................................................................................................................................................................

Page 33: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Powering down a 9326 d2U V2

Perform the following procedure to power down a 9326 d2U V2.

Procedure

...................................................................................................................................................................................................

1 Preliminary operation: make sure that the btsSiteManager object is "locked".

...................................................................................................................................................................................................

2 On the RUC module, put the power switch in the "O" position.

...................................................................................................................................................................................................

3 Check that the green or red LED on the iCCM-U/xCCM-U and on each

iCEM-U/xCEM-U is OFF.

...................................................................................................................................................................................................

4 Check that the fans are stopping down.

...................................................................................................................................................................................................

5 At the operator DC power supply, put the site circuit breaker of the 9326 d2U V2 in the

"OFF" position.

9326 d2U V2 power up and power down procedures Powering down a 9326 d2U V2

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

6-3

E N D O F S T E P S...................................................................................................................................................................................................

Page 34: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai
Page 35: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

7 79326 d2U V2 corrective

maintenance procedures

Overview

Purpose

This chapter contains the replacement procedures applicable to the 9326 d2U V2 rack.

Note:

1. For detailed information on PSU maintenance, refer to the documentation

provided within the PSU cabinet.

2. For detailed information on Alcatel-Lucent 9100 Multi-Standard Base Station

maintenance, refer to the documentation related to the Alcatel-Lucent 9100

Multi-Standard Base Station cabinets.

Contents

Replacing the digital shelf equipment 7-2

Replacing an iCEM-U 7-3

Replacing an xCEM-U 7-6

Replacing the iCCM-U 7-9

Replacing the xCCM-U 7-14

Replacing an optical transceiver 7-20

Replacing the fans rack (48V) 7-23

Replacing the pre-cabled 9326 d2U V2 rack 7-28

Replacing the optional equipment 7-38

Replacing the External Alarm module 7-39

Replacing the LPPCM module 7-41

...................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-1

Page 36: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Replacing the digital shelf equipment

Overview

Purpose

This section presents the replacement procedures applicable to the digital shelf.

Those replacement procedures concern the following modules:

• integrated Channel Element Module-U (iCEM-U) or eXtended Channel Element

Module-U (xCEM-U)

• integrated Core Controller Module-U (iCCM-U) or eXtended Core Controller

Module-U (xCCM-U)

• Optical transceiver

• Fans rack (48V)

• Pre-cabled 9326 d2U V2 rack

Contents

Replacing an iCEM-U 7-3

Replacing an xCEM-U 7-6

Replacing the iCCM-U 7-9

Replacing the xCCM-U 7-14

Replacing an optical transceiver 7-20

Replacing the fans rack (48V) 7-23

Replacing the pre-cabled 9326 d2U V2 rack 7-28

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Overview

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-2 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 37: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Replacing an iCEM-U

Carry out the following procedure to replace an iCEM-U.

Intervention time

15 minutes

Tools required

Screwdrivers

Extraction tool

NOTICE

ESD hazard

Electronic components can be destroyed by electrostatic discharge (ESD).

Hold circuit packs only at the edges or on the insertion and removal facilities.

Always observe the general ESD instructions.

NOTICE

Service-disruption hazard

Following the procedure below will result in a loss of capacity or a loss of service

(depending on the number of CEMs housed in the 9326 d2U V2 rack).

Procedure

...................................................................................................................................................................................................

1 Locate the faulty iCEM-U in the 9326 d2U V2 rack: its red triangular LED is ON.

Figure 7-1 iCEM-U front panel

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing an iCEM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-3

Page 38: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

2 Lock the faulty cem object at the OMC by Set Administrative State.

For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User

Guide, NN-20500-032.

...................................................................................................................................................................................................

3 Undo and remove the upper hook (if present and if the defective iCEM-U is in slot 4).

...................................................................................................................................................................................................

4 Loosen the two screws on the defective iCEM-U front panel.

...................................................................................................................................................................................................

5 Remove the defective iCEM-U using the extraction tool.

...................................................................................................................................................................................................

6 If you are to replace the defective iCEM-U with a xCEM-U, go to step 6 of the procedure

“Replacing an xCEM-U” (p. 7-6).

If you are to replace the defective iCEM-U with a new iCEM-U, check the release of the

new iCEM-U.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing an iCEM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-4 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 39: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

7 Insert the new iCEM-U into the 9326 d2U V2 rack, in the same slot as the defective

iCEM-U.

...................................................................................................................................................................................................

8 Tighten the two screws on the iCEM-U front panel.

...................................................................................................................................................................................................

9 Put the hook back in place and secure it.

...................................................................................................................................................................................................

10 From the OMC, unlock the cem object previously locked on step 2.

...................................................................................................................................................................................................

11 Check the state of the LEDs. They should go on, then take the following state:

red triangular LED OFF and green rectangular LED ON.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing an iCEM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-5

E N D O F S T E P S...................................................................................................................................................................................................

Page 40: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Replacing an xCEM-U

Carry out the following procedure to replace an xCEM-U.

Intervention time

Ten minutes

Tools required

Screwdriver

Extraction tool

NOTICE

ESD hazard

Electronic components can be destroyed by electrostatic discharge (ESD).

Hold circuit packs only at the edges or on the insertion and removal facilities.

Always observe the general ESD instructions.

NOTICE

Service-disruption hazard

Following the procedure below will result in a loss of capacity or a loss of service

(depending on the number of CEMs housed in the 9326 d2U V2 rack).

Procedure

...................................................................................................................................................................................................

1 Locate the faulty xCEM-U in the 9326 d2U V2 rack: its red LED is ON.

Figure 7-2 xCEM-U front panel

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing an xCEM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-6 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 41: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

2 Lock the faulty cem object at the OMC by Set Administrative State.

For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User

Guide, NN-20500-032.

...................................................................................................................................................................................................

3 Undo and remove the upper hook (if present and if the defective xCEM-U is in slot 4).

...................................................................................................................................................................................................

4 Loosen the two screws on the xCEM-U front panel.

...................................................................................................................................................................................................

5 Remove the defective xCEM-U using the extraction tool.

...................................................................................................................................................................................................

6 Check the release of the new xCEM-U.

...................................................................................................................................................................................................

7 Insert the new xCEM-U into the 9326 d2U V2 rack, in the same slot as the defective

xCEM-U.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing an xCEM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-7

Page 42: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

8 Tighten the two screws on the xCEM-U front panel.

...................................................................................................................................................................................................

9 Put the hook back in place and secure it.

...................................................................................................................................................................................................

10 From the OMC, unlock the cem object previously locked on step 2.

...................................................................................................................................................................................................

11 Check the state of the LEDs. They should go on, then take the following state:

red triangular LED OFF and green rectangular LED ON.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing an xCEM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-8 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

E N D O F S T E P S...................................................................................................................................................................................................

Page 43: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Replacing the iCCM-U

Carry out the following procedure to replace the iCCM-U.

Intervention time

20 minutes

Tools required

Screwdrivers

Extraction tool

DANGER

Laser hazard

This equipment operates with invisible laser radiation. Laser radiation can cause

considerable injuries to the eyes.

Never look into the end of an exposed fiber or into an open optical connector when the

optical source is switched on. Always observe the laser warning instructions.

NOTICE

ESD hazard

Electronic components can be destroyed by electrostatic discharge (ESD).

Hold circuit packs only at the edges or on the insertion and removal facilities.

Always observe the general ESD instructions.

Figure 7-3 iCCM-U board front panel

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the iCCM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-9

Page 44: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

NOTICE

Service-disruption hazard

Following the procedure below will result in a loss of service.

Important! The spare iCCM-U software load must be UA05.1.2, otherwise the 9326

d2U V2 can not start.

Important! There will be a loss of service on the Remote Radio device(s) associated

with the iCCM-U being replaced.

Procedure

...................................................................................................................................................................................................

1 Lock all the objects associated with the Remote Radio devices connected to the faulty

iCCM-U at the OMC by Set Administrative State.

For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User

Guide, NN-20500-032.

...................................................................................................................................................................................................

2 Power down the 9326 d2U V2.

To do this, follow the procedure “Powering down a 9326 d2U V2” (p. 6-3).

...................................................................................................................................................................................................

3 Undo and remove the lower hook (if present).

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the iCCM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-10 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 45: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

4 Loosen the two screws on the defective iCCM-U front panel.

...................................................................................................................................................................................................

5 Unplug the iCCM-U from its RBP connectors using the extraction tool.

...................................................................................................................................................................................................

6 Disconnect the optical fiber(s) from the iCCM-U front panel.

...................................................................................................................................................................................................

7 Remove the SFP transceiver(s) from the iCCM-U front panel.

...................................................................................................................................................................................................

8 Disconnect the digital cable (connector labeled "ALARM") from the iCCM-U front

panel.

...................................................................................................................................................................................................

9 Disconnect the E1/T1 connector (PCM link) from the iCCM-U front panel.

...................................................................................................................................................................................................

10 Extract the defective iCCM-U using the extraction tool.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the iCCM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-11

Page 46: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

11 Insert the new iCCM-U into the slot guides without plugging it on the RBP.

...................................................................................................................................................................................................

12 Reinsert the SFP transceiver(s) through the iCCM-U front panel.

...................................................................................................................................................................................................

13 Important! In case of an iCCM-U equipped with MM SFP transceivers, when

reconnecting the optical fibers on the iCCM-U front panel, put the LC connectors

(L/R) in the same sense as they were before the intervention.

Reconnect the optical fiber(s) on the iCCM-U front panel.

...................................................................................................................................................................................................

14 Reconnect the digital cable on the iCCM-U front panel.

...................................................................................................................................................................................................

15 Insert completely the new iCCM-U into the 9326 d2U V2 rack by plugging it into its RBP

connectors.

...................................................................................................................................................................................................

16 Tighten the two screws on the iCCM-U front panel.

...................................................................................................................................................................................................

17 Put the hook back in place and secure it.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the iCCM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-12 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 47: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

18 Important! If the iCCM-U software load is not UA05.1.2, the 9326 d2U V2 can not

start.

Power up the 9326 d2U V2.

To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 6-2)

...................................................................................................................................................................................................

19 Reconnect the PCM E1/T1 cable on the iCCM-U front panel.

...................................................................................................................................................................................................

20 Unlock from the OMC the objects previously locked through step 1.

...................................................................................................................................................................................................

21 Check the state of the LEDs and display:

• The i/xCEM(s)-U and iCCM-U corporate LEDs should turn on, then take the

following state:

red LED OFF and green LED ON.

• The green PCM LEDs should be ON.

• The display should indicate the PCM synchronization.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the iCCM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-13

E N D O F S T E P S...................................................................................................................................................................................................

Page 48: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Replacing the xCCM-U

Carry out the following procedure to replace the xCCM-U.

Intervention time

20 minutes

Tools required

Screwdrivers

Extraction tool

Figure 7-4 xCCM-U-4E1 configuration front panel

Figure 7-5 xCCM-U-GE configuration front panel

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the xCCM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-14 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 49: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

DANGER

Laser hazard

This equipment operates with invisible laser radiation. Laser radiation can cause

considerable injuries to the eyes.

Never look into the end of an exposed fiber or into an open optical connector when the

optical source is switched on. Always observe the laser warning instructions.

NOTICE

ESD hazard

Electronic components can be destroyed by electrostatic discharge (ESD).

Hold circuit packs only at the edges or on the insertion and removal facilities.

Always observe the general ESD instructions.

NOTICE

Service-disruption hazard

Following the procedure below will result in a loss of service.

Procedure

...................................................................................................................................................................................................

1 Important! There will be a loss of service on the Remote Radio device(s) associated

with the xCCM-U being replaced.

Lock all the objects associated with the Remote Radio devices connected to the faulty

xCCM-U at the OMC by Set Administrative State.

For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User

Guide, NN-20500-032.

...................................................................................................................................................................................................

2 Power down the 9326 d2U V2.

To do this, follow the procedure “Powering down a 9326 d2U V2” (p. 6-3).

...................................................................................................................................................................................................

3 Undo and remove the lower hook (if present).

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the xCCM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-15

Page 50: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

4 Loosen the two screws on the defective xCCM-U front panel.

...................................................................................................................................................................................................

5 Unplug the xCCM-U from its RBP connectors using the extraction tool.

...................................................................................................................................................................................................

6 Disconnect the GPS cable (connector labeled “GPS”) from the xCCM-U front panel if

used.

...................................................................................................................................................................................................

7 Disconnect the optical fiber(s) and remove the SFP transceiver(s) (connector(s) labeled

“OPTIC”) from the xCCM-U front panel.

...................................................................................................................................................................................................

8 Disconnect the digital cable (connector labeled "ALARM") from the xCCM-U front

panel.

...................................................................................................................................................................................................

9 Disconnect the TIL cable (labeled “PORT 1”) from the xCCM-U front panel.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the xCCM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-16 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 51: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

10

If... Then...

The xCCM-U hardware configuration is

xCCM-U-4E1

Disconnect the two E1/T1 connectors (labeled

“PCM E1/T1” and “MDA”) from the

xCCM-U front panel.

If the hybrid Iub interface is implemented,

disconnect the Ethernet connector (labeled

“PORT 2”).

The xCCM-U hardware configuration is

xCCM-U-GE

Disconnect the Gigabit Ethernet cable(s) and

remove the SFP transceiver(s) (labeled

“MDA) from the xCCM-U front panel.

...................................................................................................................................................................................................

11 Extract the defective xCCM-U using the extraction tool.

...................................................................................................................................................................................................

12 Insert the new xCCM-U into the slot guides without plugging it on the RBP.

...................................................................................................................................................................................................

13 Reconnect the GPS cable (connector labeled “GPS”) on the xCCM-U front panel if used.

...................................................................................................................................................................................................

14 Reinsert the SFP transceiver(s) (connector(s) labeled “OPTIC”) through the xCCM-U

front panel.

...................................................................................................................................................................................................

15 Important! In case of an xCCM-U equipped with MM SFP transceivers, when

reconnecting the optical fibers on the xCCM-U front panel, put the LC connectors

(L/R) in the same sense as they were before the intervention.

Reconnect the optical fiber(s) (connector(s) labeled “OPTIC”) on the xCCM-U front

panel.

...................................................................................................................................................................................................

16 Reconnect the digital cable (connector labeled "ALARM") on the xCCM-U front panel.

...................................................................................................................................................................................................

17 Reconnect the TIL cable (labeled “PORT 1”) on the xCCM-U front panel.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the xCCM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-17

Page 52: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

18

If... Then...

The xCCM-U hardware configuration is

xCCM-U-GE

Reinsert the SFP transceiver(s) (connector(s)

labeled “MDA”) through the xCCM-U front

panel.

Reconnect the Gigabit Ethernet cable(s)

(labeled “MDA”) on the xCCM-U front panel.

...................................................................................................................................................................................................

19 Insert completely the new xCCM-U into the 9326 d2U V2 rack by plugging it into its

RBP connectors.

...................................................................................................................................................................................................

20 Tighten the two screws on the xCCM-U front panel.

...................................................................................................................................................................................................

21 Put the hook back in place and secure it.

...................................................................................................................................................................................................

22 Power up the 9326 d2U V2.

To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 6-2)

...................................................................................................................................................................................................

23

If... Then...

The xCCM-U hardware configuration is

xCCM-U-4E1

Reconnect the two E1/T1 connectors (labeled

“PCM E1/T1” and “MDA”) on the xCCM-U

front panel.

If the hybrid Iub interface is implemented,

reconnect the Ethernet connector (labeled

“PORT 2”).

...................................................................................................................................................................................................

24 Unlock from the OMC the objects previously locked through step 1.

...................................................................................................................................................................................................

25 Check the state of the LEDs and display:

• The i/xCEM(s)-U and xCCM-U corporate LEDs should turn on, then take the

following state:

red LED OFF and green LED ON

• The green PCM LEDs should be ON.

• The green MDA LEDs should be ON.

• The green/amber SYNC LEDs should indicate the PCM/MDA synchronization.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the xCCM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-18 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 53: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the xCCM-U

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-19

E N D O F S T E P S...................................................................................................................................................................................................

Page 54: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Replacing an optical transceiver

Carry out the following procedure to replace a defective optical transceiver.

Intervention time

Five minutes

Tools required

None

DANGER

Laser hazard

This equipment operates with invisible laser radiation. Laser radiation can cause

considerable injuries to the eyes.

Never look into the end of an exposed fiber or into an open optical connector when the

optical source is switched on. Always observe the laser warning instructions.

NOTICE

ESD hazard

Electronic components can be destroyed by electrostatic discharge (ESD).

Hold circuit packs only at the edges or on the insertion and removal facilities.

Always observe the general ESD instructions.

Procedure

...................................................................................................................................................................................................

1 Locate the faulty SFP transceiver: its two green RX/TX OPTIC LEDs (close to the eight

PCM LEDs on an iCCM-U, built-in LEDs on an xCCM-U) are OFF.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing an optical transceiver

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-20 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 55: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

2 At the OMC, through Set Administrative State, lock the FDDCell object associated with

the Remote Radio device connected to the optical transceiver being replaced.

...................................................................................................................................................................................................

3 Disconnect the optical fiber connected to the defective SFP transceiver (optical output

labeled "OPTIC1/2/3" on the iCCM-U front panel, "OPTIC1/2/3/4/5/6" on the xCCM-U

front panel).

...................................................................................................................................................................................................

4 Extract with care the defective SFP transceiver.

...................................................................................................................................................................................................

5 Check that the new replacing SFP transceiver has the same type as the SFP transceiver

being replaced.Be sure to replace a SM SFP transceiver with a SM SFP transceiver and a

MM SFP transceiver with a MM SFP transceiver.

Figure 7-6 Location of optical connectors in the 9326 d2U V2

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing an optical transceiver

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-21

Page 56: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

6 Put in place the new SFP transceiver and insert it in the i/xCCM-U.

...................................................................................................................................................................................................

7 Reconnect the optical fiber.

...................................................................................................................................................................................................

8 Unlock from the OMC the FDDCell object previously locked through step 2.

...................................................................................................................................................................................................

9 Check the state of the two green RX/TX OPTIC LEDs: they should be ON.

Figure 7-7 Inserting an SFP transceiver in the iCCM-U

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing an optical transceiver

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-22 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

E N D O F S T E P S...................................................................................................................................................................................................

Page 57: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Replacing the fans rack (48V)

Carry out the following procedure to replace the fans rack when alarmed.

Intervention time

15 minutes

Tools required

None

NOTICE

ESD hazard

Electronic components can be destroyed by electrostatic discharge (ESD).

Hold circuit packs only at the edges or on the insertion and removal facilities.

Always observe the general ESD instructions.

Figure 7-8 9326 d2U V2 front view (with iCCM-U)

Figure 7-9 9326 d2U V2 front view (with xCCM-U)

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the fans rack (48V)

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-23

Page 58: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

NOTICE

Service-disruption hazard

Following the procedure below will result in a loss of service.

Procedure

...................................................................................................................................................................................................

1 Lock the cem object as well as all the objects associated with the Remote Radio devices

connected to the i/xCCM-U at the OMC, by Set Administrative State.

For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User

Guide, NN-20500-032.

...................................................................................................................................................................................................

2 Power down the 9326 d2U V2.

To do this, follow the procedure “Powering down a 9326 d2U V2” (p. 6-3).

...................................................................................................................................................................................................

3 Disconnect the –48V Power cable (3JR08080AA or 3JR08081AA) from the RUC front

panel.

...................................................................................................................................................................................................

4 Disconnect the Dallas one-wire cable ("INT" - NTU872JA) from the RUC front panel.

...................................................................................................................................................................................................

5 Disconnect the Dallas one-wire cable ("ALARM" - RJ45 connector to the i/xCCM-U -

3JR22028AA) from the RUC front panel.

...................................................................................................................................................................................................

6 Extract the defective fans rack using the two handles on top and bottom of the RUC front

panel.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the fans rack (48V)

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-24 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 59: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Figure 7-10 Extracting the fans rack

Figure 7-11 Fans rack

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the fans rack (48V)

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-25

Page 60: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

7 Put the new fans rack in place and insert it completely into the 9326 d2U V2.

...................................................................................................................................................................................................

8 Reconnect the Dallas one-wire cable (3JR22028AA - "ALARM") on the RUC front

panel.

...................................................................................................................................................................................................

9 Reconnect the Dallas one-wire cable (NTU872JA - "INT") on the RUC front panel.

...................................................................................................................................................................................................

10 Reconnect the –48V Power cable (3JR08080AA or 3JR08081AA) on the RUC front

panel.

...................................................................................................................................................................................................

11 Power up the new 9326 d2U V2.

To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 6-2)

...................................................................................................................................................................................................

12 Unlock from the OMC the objects previously locked through step 1.

...................................................................................................................................................................................................

13 Check the state of the LEDs and display:

• The i/xCEM-U and i/xCCM-U corporate LEDs should turn on, then take the

following state: red LED OFF and green LED ON.

• For an xCCM-U:

– The green PCM/MDA LEDs should be ON.

– The SYNC status LEDs should indicate the PCM/MDA synchronization

(green/amber).

– The green built-in RX/TX OPTIC LEDs should be ON.

• For an iCCM-U:

– The green PCM LEDs should be ON.

– The green RX/TX OPTIC LEDs should be ON.

– The SYNC display should indicate the PCM synchronization.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the fans rack (48V)

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-26 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 61: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the fans rack (48V)

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-27

E N D O F S T E P S...................................................................................................................................................................................................

Page 62: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Replacing the pre-cabled 9326 d2U V2 rack

Carry out the following procedure to replace the 9326 d2U V2 rack.

Intervention time

40 minutes

Tools required

Screwdrivers

Extraction tool

Figure 7-12 9326 d2U V2 front view (with iCCM-U)

Figure 7-13 9326 d2U V2 front view (with xCCM-U)

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the pre-cabled 9326 d2U V2 rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-28 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 63: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

DANGER

Laser hazard

This equipment operates with invisible laser radiation. Laser radiation can cause

considerable injuries to the eyes.

Never look into the end of an exposed fiber or into an open optical connector when the

optical source is switched on. Always observe the laser warning instructions.

NOTICE

ESD hazard

Electronic components can be destroyed by electrostatic discharge (ESD).

Hold circuit packs only at the edges or on the insertion and removal facilities.

Always observe the general ESD instructions.

NOTICE

Service-disruption hazard

Following the procedure below will result in a loss of service.

Procedure

...................................................................................................................................................................................................

1 Lock the cem object as well as all the objects associated with the Remote Radio devices

connected to the i/xCCM-U at the OMC, by Set Administrative State.

For more information, refer to Alcatel-Lucent 9353 Wireless Management System - User

Guide, NN-20500-032.

...................................................................................................................................................................................................

2 Power down the 9326 d2U V2.

To do this, follow the procedure “Powering down a 9326 d2U V2” (p. 6-3).

...................................................................................................................................................................................................

3 Remove the management sticker located on the lug, on the right hand side of the 9326

d2U V2 rack.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the pre-cabled 9326 d2U V2 rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-29

Page 64: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

This removable sticker contains a 6-digit Network IDentifier (NeID) that is used at 9326

d2U V2 connection to the OMC. This sticker must be stored in a safe location since it will

be reused on the new 9326 d2U V2 rack.

...................................................................................................................................................................................................

4 Undo and remove the upper and lower hooks (if present).

Figure 7-14 Location of the management sticker

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the pre-cabled 9326 d2U V2 rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-30 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 65: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

5 Remove the i/xCEM(s)-U using the extraction tool.

...................................................................................................................................................................................................

6 Remove the i/xCCM-U:

• Loosen the two screws on the defective i/xCCM-U front panel.

• Unplug the i/xCCM-U from its RBP connectors using the extraction tool.

• Disconnect the optical fiber(s) from the i/xCCM-U front panel.

• Disconnect the digital cable (connector labeled "ALARM") from the i/xCCM-U front

panel.

• For an iCCM-U, disconnect the E1/T1 cable (connector labeled "PCM E1/T1") from

the iCCM-U front panel.

• For an xCCM-U, disconnect the PCM E1/T1 cable (connector labeled "PCM E1/T1")

and the MDA cable (connector labeled "MDA") from the xCCM-U front panel.

• Extract the i/xCCM-U using the extraction tool.

...................................................................................................................................................................................................

7 Remove the defective 9326 d2U V2 rack.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the pre-cabled 9326 d2U V2 rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-31

Page 66: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

8 Put the new 9326 d2U V2 rack in place.

...................................................................................................................................................................................................

9 Fix the NeID sticker on the right hand side of the RUC, on the lug of the new 9326 d2U

V2 rack.

...................................................................................................................................................................................................

10 Reinsert the i/xCEM(s)-U in the new digital shelf.

...................................................................................................................................................................................................

11 Reinsert the i/xCCM-U in the new digital shelf:

• Insert the i/xCCM-U into the slot guides without plugging it on the RBP.

• Reconnect the optical fiber(s) on the i/xCCM-U front panel.

• Reconnect the digital cable on the i/xCCM-U front panel.

• Insert completely the i/xCCM-U into the digital shelf by plugging it into its RBP

connectors.

• Tighten the two screws on the i/xCCM-U front panel.

...................................................................................................................................................................................................

12 Put the two hooks in place and secure them.

...................................................................................................................................................................................................

13 Power up the new 9326 d2U V2.

To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 6-2)

...................................................................................................................................................................................................

14 Reconnect the following cables:

• For an iCCM-U, the PCM E1/T1 cable on the iCCM-U front panel

• For an xCCM-U, the PCM E1/T1 cable and the MDA cable on the xCCM-U front

panel

...................................................................................................................................................................................................

15 Unlock from the OMC the objects previously locked through step 1.

...................................................................................................................................................................................................

16 Connect the TIL on the 9326 d2U V2 (on "PORT2" of the iCCM-U, on "PORT1" of the

xCCM-U) to modify the pre-cabled rack inventory parameters.

...................................................................................................................................................................................................

17 Launch the TIL.

...................................................................................................................................................................................................

18 Go to the I&C menu.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the pre-cabled 9326 d2U V2 rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-32 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 67: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

19

...................................................................................................................................................................................................

20 In the Change I&C parameters tabs, choose the BTS tab.

...................................................................................................................................................................................................

21 The Serialisation number, Manufacturing Date, and Hardware Release fields are

linked with the defective 9326 d2U V2 rack. This information must be updated.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the pre-cabled 9326 d2U V2 rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-33

Page 68: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

22 Using the information printed on the pre-cabled rack labels present on the left hand side

of the 9326 d2U V2 spare, fill out the following fields:

• Serialisation number

• Manufacturing Date

• Hardware Release

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the pre-cabled 9326 d2U V2 rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-34 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 69: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

23 Click Send to iBTS and wait during the operation. At the end of the operation, the

following message is displayed:

...................................................................................................................................................................................................

24 Go to the Tools menu.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the pre-cabled 9326 d2U V2 rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-35

Page 70: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

25

...................................................................................................................................................................................................

26 In the Confirm the reset window, click OK.

...................................................................................................................................................................................................

27 In the End of Reset window, click OK.

...................................................................................................................................................................................................

28 Exit the TIL.

...................................................................................................................................................................................................

29 Disconnect the TIL from the 9326 d2U V2.

...................................................................................................................................................................................................

30 Check the state of the LEDs and display:

• The i/xCEM-U and i/xCCM-U corporate LEDs should turn on, then take the

following state: red LED OFF and green LED ON.

• For an xCCM-U:

– The green PCM/MDA LEDs should be ON.

– The SYNC status LEDs should indicate the PCM/MDA synchronization

(green/amber).

– The green built-in RX/TX OPTIC LEDs should be ON.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the pre-cabled 9326 d2U V2 rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-36 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 71: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

• For an iCCM-U:

– The green PCM LEDs should be ON.

– The green RX/TX OPTIC LEDs should be ON.

– The SYNC display should indicate the PCM synchronization.

9326 d2U V2 corrective maintenance procedures

Replacing the digital shelf equipment

Replacing the pre-cabled 9326 d2U V2 rack

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-37

E N D O F S T E P S...................................................................................................................................................................................................

Page 72: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Replacing the optional equipment

Overview

Purpose

This section presents the replacement procedures related to the following items:

• External Alarm module

• PCM Lightning Protection (LPPCM) module

Contents

Replacing the External Alarm module 7-39

Replacing the LPPCM module 7-41

9326 d2U V2 corrective maintenance procedures

Replacing the optional equipment

Overview

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-38 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 73: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Replacing the External Alarm module

Perform the following procedure to replace the External Alarm module.

Intervention time

Ten minutes

Tools required

Screwdriver

NOTICE

ESD hazard

Electronic components can be destroyed by electrostatic discharge (ESD).

Hold circuit packs only at the edges or on the insertion and removal facilities.

Always observe the general ESD instructions.

Procedure

...................................................................................................................................................................................................

1 Open the door(s) of the Node B.

...................................................................................................................................................................................................

2 Locate the External Alarm module, just below the 9326 d2U V2 rack.

...................................................................................................................................................................................................

3 On the External Alarm module, disconnect the following cables from the front panel

connectors:

• The two external alarm cables

• The alarm cable that connects the alarm module to the LPPCM module (if exists)

• The private alarm bus cable that is connected to the front panel of the RUC module

• The ground cable

Figure 7-15 Front panel of the External Alarm module

9326 d2U V2 corrective maintenance procedures

Replacing the optional equipment

Replacing the External Alarm module

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-39

Page 74: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

...................................................................................................................................................................................................

4 Loosen the four front panel screws.

...................................................................................................................................................................................................

5 Remove the defective External Alarm module.

...................................................................................................................................................................................................

6 Insert the new External Alarm module.

...................................................................................................................................................................................................

7 Tighten the four front panel screws.

...................................................................................................................................................................................................

8 Reconnect the five cables.

...................................................................................................................................................................................................

9 Close the door(s) of the Node B.

9326 d2U V2 corrective maintenance procedures

Replacing the optional equipment

Replacing the External Alarm module

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-40 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

E N D O F S T E P S...................................................................................................................................................................................................

Page 75: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Replacing the LPPCM module

Carry out the following procedure to replace the LPPCM module.

Intervention time

15 minutes

Tools required

• Screwdriver

• Wrench for hexagonal head (M6 nut)

NOTICE

ESD hazard

Electronic components can be destroyed by electrostatic discharge (ESD).

Hold circuit packs only at the edges or on the insertion and removal facilities.

Always observe the general ESD instructions.

Figure 7-16 LPPCM module front panel

9326 d2U V2 corrective maintenance procedures

Replacing the optional equipment

Replacing the LPPCM module

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

7-41

Page 76: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

NOTICE

Service-disruption hazard

Following the procedure below will result in a loss of service.

Procedure

...................................................................................................................................................................................................

1 Power down the 9326 d2U V2.

To do this, follow the procedure “Powering down a 9326 d2U V2” (p. 6-3).

...................................................................................................................................................................................................

2 Locate the LPPCM module, just above the 9326 d2U V2 rack.

...................................................................................................................................................................................................

3 Disconnect the cables connected on the LPPCM front panel:

• The "PCM Out" cable that is connected to the iCCM-U/xCCM-U

• The "IN" alarm bus cable that is connected to the External Alarm module

• The PCM cable ("PCM In")

• The ground cable

...................................................................................................................................................................................................

4 Loosen the two front panel screws.

...................................................................................................................................................................................................

5 Remove the defective LPPCM module.

...................................................................................................................................................................................................

6 Insert the new LPPCM module.

...................................................................................................................................................................................................

7 Tighten the two front panel screws.

...................................................................................................................................................................................................

8 Reconnect the four cables.

...................................................................................................................................................................................................

9 Power up the 9326 d2U V2.

To do this, follow the procedure “Powering up a 9326 d2U V2” (p. 6-2).

9326 d2U V2 corrective maintenance procedures

Replacing the optional equipment

Replacing the LPPCM module

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

7-42 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

E N D O F S T E P S...................................................................................................................................................................................................

Page 77: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Appendix A: Product

conformance statements

Overview

Purpose

This appendix provides the 9326 d2U V2 product conformance statements.

Contents

European regulatory requirement compliance A-2

North American regulatory requirement compliance A-4

Compliances for other regions/countries A-7

Operating conditions A-8

Cable specifications A-9

Product labeling A-10

...................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

A-1

Page 78: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

European regulatory requirement compliance

The 9326 d2U V2 falls under the Directive of the European Parliament and of the Council

of December 15th 2004 on the approximation of the laws of the Member States relating to

electromagnetic compatibility 2004/108/EC.

This directive covers essential requirements in the field of:

• Electromagnetic compatibility (EMC) protection requirements contained in Directive

2004/108/EC.

This equipment generates, uses, and can radiate radio frequency energy. If not

installed and used in accordance with the instruction manual, it can interfere with

radio communications. However, there is no guarantee that interferences do not occur

in a particular installation. If this equipment does cause harmful interference to radio

or television reception, which can be determined by turning the equipment off and on.

The user is encouraged to correct any interference problems.

EMC requirements have been selected to ensure an adequate level of compatibility for

apparatus in residential, commercial, and light industrial environments. Compatibility

levels, however, do not cover extreme cases that can occur in any location, but that

have a low probability of occurrence. In particular, they may not cover cases where a

source of interference that is producing repeated transient or continuous phenomena is

permanently present. This could include, for example, a radar or broadcast site in the

near vicinity. In these cases, it may be necessary to limit the source of interference,

and/or apply special protection to the interfered part.

Note: For operation or maintenance inside Alcatel-Lucent systems, the operator must

always wear the antistatic wrist strap to maintain the integrity of the product.

• Effective use of the Radio spectrum allocated to terrestrial/space radio communication

and orbital resources to avoid interference. The routes and standards used to

demonstrate compliance with these requirements are outlined in the following

paragraphs.

– Node B EMC

Compliance with essential EMC requirements was demonstrated using ETSI EN

300 386.

– Node B safety

Compliance with essential safety requirements was demonstrated using EN

60950-1 as well as IEC 60950-1.

European Union Environmental Directives (EUED)

The 9326 d2U V2 is manufactured according to the following two European Union

Environmental Directives:

• Restriction of Hazardous Substances (RoHS), 2002/95/EC.

The RoHS directive restricts the use of lead, mercury, cadmium, hexavalent

chromium, poly-brominated biphenyls (PBB) and poly-brominated diphenyl ethers

(PBDE) in electrical and electronic products. This directive applies to all electrical

and electronic products placed on the European Union (EU) and European Economic

Area (EEA) markets after July 1, 2006, with certain exemptions, including an

exemption for lead solder in network infrastructure equipment.

• Waste of Electrical and Electronic Equipment (WEEE), 2002/96/EC.

Product conformance statements European regulatory requirement compliance

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

A-2 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 79: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

The WEEE directive mandates the necessary treatment of such equipment when it

enters end-of-life. It specifically identifies requirements for recycling, reuse, and

disposal.

Product conformance statements European regulatory requirement compliance

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

A-3

Page 80: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

North American regulatory requirement compliance

The 9326 d2U V2 has been qualified according to North American market requirements.

This equipment has been tested and found to comply with the limits for a Class A digital

device, pursuant to part 15 of the FCC Rules. These limits are designed to provide

reasonable protection against harmful interference in a residential installation.

This equipment generates, uses and can radiate radio frequency energy and, if not

installed and used in accordance with the instructions, may cause harmful interference to

radio communications. However, there is no guarantee that interference will not occur in

a particular installation.

If this equipment does cause harmful interference to radio or television reception, which

can be determined by turning the equipment off and on, the user is encouraged to try to

correct the interference by one or more of the following measures:

• Reorient or relocate the receiving antenna

• Increase the separation between the equipment and receiver

• Connect the equipment into an outlet on a circuit different from that to which the

receiver is connected

• Consult the dealer or an experienced radio/TV technician for help

Node B safety

The 9326 d2U V2 complies with UL60950-1 and CAN/CSA C22.2 No. 60950-1 Safety

Standards.

The CSA mark is applied on the 9326 d2U V2 and demonstrates compliance with both

US and Canadian Standards.

Node B EMC

The 9326 d2U V2 complies with 47CFR Part 15 class A for EMC emission limits.

This Class A digital apparatus complies with Canadian ICES-003.

Node B interconnection compliance

The 9326 d2U V2 complies with Industry Canada IC-CS03 Part II requirements and

meets the applicable Industry Canada technical specifications.

On the core controller printed circuit board is a label that contains a product identifier in

the following format:

• IC: 6933C-ICCMU for iCCM-U module

• IC: 6933C-XCCMU for xCCM-U module

The 9326 d2U V2 complies with 47 CFR Part 68 of the FCC rules and the requirements

adopted by the ACTA.

Product conformance statements North American regulatory requirement compliance

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

A-4 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 81: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

On the core controller printed circuit board is a label that contains a product identifier in

the following format:

• US: U3EXDNANICCMU for iCCM-U module

• US: U3EXDNANXCCMU for xCCM-U module

If requested, the following information must be provided to the telephone company:

• ACTA Registered Number: U3E

• Facility Interface Code (FIC): 04DU9.BN, 04DU9.DN, 04DU9.1KN, and

04DU9.1SN

• Service Order Code (SOC): 6.0F

A FCC part 68 and ACTA compliant cable is provided with the Node B equipment, with

no connector at network interface side. The Node B equipment operates with a 1.544

Mbps digital channel. See Installation Instructions for details.

If the Node B equipment causes harm to the phone network, the telephone company will

notify you in advance that temporary discontinuance of service may be required. But if

advance notice is not practical, the telephone company will notify the customer as soon as

possible. Also, you will be advised of your right to file a complaint with the FCC if you

believe it is necessary.

The telephone company may make changes to its facilities, equipment, operations or

procedures that could affect the operation of the equipment. If this happens the telephone

company will provide advance notice so you can make the necessary modifications to

maintain uninterrupted services.

If trouble is experienced with this equipment 9326 d2U V2, for repair or warranty

information, please contact:

Hernan R. Noguchi Global

Product Compliance Laboratory (GPCL)

Alcatel-Lucent

Phone: 1-732-332-6002 101

Crawfords Corner Road Building

11C, Room 165 Holmdel NJ 07733-3030

If the equipment is causing harm to the telephone network, the telephone company may

request that you disconnect the equipment until the problem is resolved.

All repairs should be handled by authorized Alcatel-Lucent Service Personnel.

Node B data equipment

The following table shows which jacks are associated with which modes of operation.

Operation Mode USOC Jack

Programmable & Test RJ45S

Product conformance statements North American regulatory requirement compliance

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

A-5

Page 82: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Node B systems

Facility Interface Codes (FIC), Services Order Codes (SOC), USOC Jack Codes, and

Ringer Equivalence Number (REN) are shown in the table below for each port where

applicable.

Port FIC SOC USOC Jack REN

iCCM-U T1

board

04DU9.BN 6.0F N/A N/A

iCCM-U T1

board

04DU9.DN 6.0F N/A N/A

iCCM-U T1

board

04DU9.1KN 6.0F N/A N/A

iCCM-U T1

board

04DU9.1SN 6.0F N/A N/A

iCCM-U T1

board1

04DU9.BN 6.0F N/A N/A

iCCM-U T1

board1

04DU9.DN 6.0F N/A N/A

iCCM-U T1

board1

04DU9.1KN 6.0F N/A N/A

iCCM-U T1

board1

04DU9.1SN 6.0F N/A N/A

Note:1

equipped with MDA 4E1/T1 PCM links

Product conformance statements North American regulatory requirement compliance

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

A-6 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 83: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Compliances for other regions/countries

It is impossible to list all the applicable approvals/compliances as they depend on the

markets and products concerned.

Note: Contact your local Alcatel-Lucent representative for more information.

Product conformance statements Compliances for other regions/countries

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

A-7

Page 84: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Operating conditions

The product compliance standards mentioned above are based on the following operating

conditions:

• External cables must be of the same type as specified by Alcatel-Lucent.

• No modification of any mechanical or electrical characteristics of the product shall be

made.

Any changes or modifications made to the product without written approval from

Alcatel-Lucent releases Alcatel-Lucent from responsibility regarding standards

compliance.

Product conformance statements Operating conditions

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

A-8 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 85: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Cable specifications

Compliance with these standards was verified using cables as specified by

Alcatel-Lucent. The continuing compliance of the product relies upon use of the correct

cabling scheme as well as use of identical type cables as specified by Alcatel-Lucent.

Refer to the installation guides for details on cable specifications.

Product conformance statements Cable specifications

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

A-9

Page 86: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Product labeling

The label may be located inside or outside the product, provided that the operation and/or

maintenance personnel have the information when working on the product.

Node B labeling for American Countries

To indicate compliance with the CSA and UL Safety requirements, the 9326 d2U V2

bears the following mark in a conspicuous location.

On the main regulatory label, compliance to 47 CFR Part 15 is stated along with:

• Manufacturers name

• Equipment designation

• Nominal voltage operating range and maximum rated current

Compliance to Industry Canada ICES-003 is stated on additional regulatory label.

Compliance to the 47 CFR Part68 and IC CS-03 are stated through additional labels on

the Core Controller Module printed circuit board since certification is performed at

module level (Host Independent submission).

Node B labeling for European Countries

To indicate compliance with the European 2004/108/EC Directive, the 9326 d2U V2

bears the following label in a visible location:

• Manufacturers name

• Equipment designation

• Nominal voltage operating range and maximum rated current

Product conformance statements Product labeling

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

A-10 Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

NN-20500-204

Issue 4.05 May 2010

Page 87: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai

Labeling for other regions / countries

Labeling for other regions and countries is performed as appropriate and required by the

local regulatory framework.

Product conformance statements Product labeling

....................................................................................................................................................................................................................................

....................................................................................................................................................................................................................................

NN-20500-204

Issue 4.05 May 2010

Alcatel-Lucent – Proprietary

Use pursuant to applicable agreements

A-11

Page 88: NN-20500-204 (Alcatel-Lucent 9326 Digital 2U Node B V2 - Mai