NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston Inc. May 7, 2014
21

NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Dec 22, 2015

Download

Documents

Lilian Hensley
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

NMWDOC2014 Conference

Flood Control Dams on Basalt Foundations – Two

Case Studies

Dan Aguirre, PE - Wilson & CompanyCraig Hoover, PE - Bohannan Huston Inc.

May 7, 2014

Page 2: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Contents/Agenda

▲Las Ventanas Dam – Craig Hoover▲Boca Negra Dam – Dan Aguirre

Page 3: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

Page 4: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

Page 5: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

Page 6: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

Page 7: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Site Geology– West mesa formed by up faulted blocks– Followed by sedimentation– Followed by volcanic eruptions– Olivine basalt flows characterize the site– Basalt is exposed at the surface in many places– Covered with up to 12’ of sand in other areas

Page 8: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Site Geology/Field Investigation– GeoTest Inc.– Core drilling indicated the depth of basalt was

typically 30 feet thick– At least one core found the basalt to be more

than 50 feet thick– Material beneath the basalt – calcareously

cemented sand and gravel of the Santa Fe Formation

Page 9: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Site Geology– Basalt – gray to black to black-red– Vesicular to varying degrees– Areas where highly vesicular the vesicles

(cavities) were large and appear interconnected– Singular joints and fractured zones were

observed in the basalt cores

Page 10: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Site Geology– Joints either bare or coated with carbonate

deposits– Fracture zones 1 to 2 feet thick– During coring water was lost in most corings-

attributed to interconnected vesicles– Air found blowing from one boring after

completion of drilling and varied with the atmospheric wind indicating fractures connected to the surface

Page 11: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Foundation for a Dam? – Highly variable surface and depth to rock– Highly vesicular areas– Apparent high permeability– Water lost during coring indicating

interconnectedness of vesicles– Fractures connected to the surface

Page 12: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Foundation Treatment and Cutoff

Page 13: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Foundation Treatment and Cutoff

Page 14: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Foundation Treatment and Cutoff

Page 15: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Foundation Treatment and Cutoff

Page 16: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Cutoff Trench and Cement Treated Slurry

Page 17: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Cutoff Trench and Cement Treated Slurry– Flowable mixture of Portland cement,

aggregates, admixtures (water reducing and air entrainment) and water

– 28 day compressive strength 500 psi to 1,000 psi

– Placed to full depth of trench

Page 18: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Foundation Treatment Cement Treated Soil

Page 19: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Foundation Treatment Cement Treated Soil– Scarify soil to full depth– Dampen soil– Add cement per mix design– Mix and add water to optimum moisture content

minus 1% to plus 2%– Compact to 96% maximum density

Page 20: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

Las Ventanas Dam

▲Foundation Treatment Cement Treated Soil

Page 21: NMWDOC 2014 Conference Flood Control Dams on Basalt Foundations – Two Case Studies Dan Aguirre, PE - Wilson & Company Craig Hoover, PE - Bohannan Huston.

QUESTIONS?