Top Banner
NMSU SHOT II WORKSHOP Klipsch School of Electrical and Computer Engineering & Mechanical Engineering Department Jeremy Bruggemann Michelle Chavez Trevenor Evans George Kuchera
10

NMSU SHOT II WORKSHOP

Feb 01, 2016

Download

Documents

Sukki Yoon

NMSU SHOT II WORKSHOP. Klipsch School of Electrical and Computer Engineering & Mechanical Engineering Department Jeremy Bruggemann Michelle Chavez Trevenor Evans George Kuchera. Mission Overview. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NMSU SHOT II WORKSHOP

NMSU SHOT II WORKSHOP

Klipsch School of Electrical and Computer Engineering & Mechanical Engineering Department

Jeremy Bruggemann

Michelle Chavez

Trevenor Evans

George Kuchera

Page 2: NMSU SHOT II WORKSHOP

Mission Overview

Our SHOT II mission is to test sensors, code, and components from our UN-4 nanosat project in order to get preliminary characterizations.

Page 3: NMSU SHOT II WORKSHOP

Relationship to UN-4 Mission

• Test computer code for UN-4 nanosat, as well as run ADC and test data

• Prove that that the science sensors and flight computer function in a cold environment

• Familiarize NMSU UN-4 team with nanosat hardware so they may communicate with, control, and obtain viable data

Page 4: NMSU SHOT II WORKSHOP

SHOT II Design

• Data Logging– DOS 6.2 operating system– Quick Basic control program that starts on power-up– Diamond Systems Prometheus CPU with integrated 16-channel ADC– Data recorded every 10 seconds to a 32 MB flash disk

Prometheus CPU

GPS

Ma

gn

eto

me

ter

COM1

COM2

DC/DC Converter

7 VX Y,Z P

T1 T2

Analog In

ES1 ES2

Page 5: NMSU SHOT II WORKSHOP

Payload Design

Datum ValueTime Seconds since midnight

Channel 1 (z acceleration) #, lsb, msb

Channel 2 (x acceleration) #, lsb, msb

Channel 3 (y acceleration) #, lsb, msb

Channel 4 (pressure) #, lsb, msb

Channel 5 – 8 (Earth sensor array 1) #, lsb, msb

Channel 9 – 12 (Earth sensor array 2) #, lsb, msb

Channel 13 (temperature 1) #, lsb, msb

Channel 14 (temperature 2) #, lsb, msb

GPS fix GGA navigation message

All values stored as ASCII

Page 6: NMSU SHOT II WORKSHOP

Payload Structure Design

– Shell is formed from 1/8-inch aluminum honeycomb plates

– Insulation added to internal surfaces

– On/Off switch to exterior

Page 7: NMSU SHOT II WORKSHOP

Testing

Drop Test • Test Design:

– Drop payload from a 15-foot height to a concrete patio

– Use actual structure materials, battery, non-functional CPU, mass simulators for sensors

• Results– Structure suffered a dent

where it landed but did not break open

– No visible damage to internal components

Page 8: NMSU SHOT II WORKSHOP

Testing

Cold Test• Test Design:

– Place payload into a chest with dry ice for three hours

– Run the payload as if it were a flight (use charged batteries, collect data)

• Results – Sensors operated normally

with the following temperature and pressure readings:

Temperature 50.4 degrees C flight computer 22.3 degrees ambient air Pressure Voltage 3.46 (normal for testing altitude)

Page 9: NMSU SHOT II WORKSHOP

Expected Results

• Should be able to see magnetometer reacting to orientation

• Determine how much vibration the payload was under and ensure that pressure, altitude and acceleration characterize test environment

• See GPS drop out (ITAR altitude limit)• Collect 2-hours minimum of data• Gain better understanding of satellite

orientation with earth sensors

Page 10: NMSU SHOT II WORKSHOP

Demonstration