Top Banner
NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls
30

NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

Mar 27, 2015

Download

Documents

Nicole Walker
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

José-Lorenzo VallésValue-added materials

DG Research European Commission

Towards the second NMP calls

Page 2: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Cooperation – Collaborative researchCooperation – Collaborative research

People – Human PotentialPeople – Human Potential

JRC (nuclear)JRC (nuclear)

Ideas – Frontier ResearchIdeas – Frontier Research

Capacities – Research CapacityCapacities – Research Capacity

JRC (non-nuclear)JRC (non-nuclear)

EuratomEuratom

+

FP7 (2007–2013)

Page 3: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

FP7 budget(in billion €, total 50.521)

Ideas7.510

Cooperation32.413

Capacities4.097

JRC (n.n.)1.751

People4.750

Page 4: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Collaborative research(Collaborative projects; Networks of Excellence; Coordination/support actions)

Collaborative research(Collaborative projects; Networks of Excellence; Coordination/support actions)

Joint Technology InitiativesJoint Technology Initiatives

Coordination of non-Community research programmes(ERA-NET; ERA-NET+; Article 169)

Coordination of non-Community research programmes(ERA-NET; ERA-NET+; Article 169)

International CooperationInternational Cooperation

Cooperation – Collaborative researchCooperation – Collaborative research

• Flexibility for Emerging needs and Unforeseen policy needs

• Support for Dissemination of knowledge and Transfer of results

• Support will be implemented across all themes through:

Page 5: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

FP7 – SP Cooperation

10 Themes (€ million)

* Not including non-nuclear activities of the Joint Research Centre: €1 751 million

1. Health 6 1002. Food, agriculture and fisheries, and biotechnology

1 935

3. Information and communication technologies 9 0504. Nanotechnologies, materials and production 3 4755. Energy 2 3506. Environment 1 8907. Transport 4 1608. Socioeconomic research 6239. Space 1 43010. Security 1 400Total 32 413

Page 6: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Four activities: 1. Nanosciences and nanotechnologies 2. Materials3. New production4. Integration of technologies for

industrial applications

Theme 4:Theme 4: NMPNMP

Page 7: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Funding Schemes - NMP

Collaborative projects

• Small or medium scale focussed projects

< € 4 million EC funding requested

• Large scale integrating projects

> € 4 million EC funding requested

• SME-targeted projects: at least 35% to SMEs

Networks of Excellence (not in these calls)

Coordination and Support actions

Draft WP - NMP

Page 8: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Draft WP - NMP

Activity 4.1: Nano S&T

4.1.1: Nanosciences and converging sciences

4.1.2: Nanotechnologies and converging technologies

4.1.3: Health, Safety and Environmental Impacts

Page 9: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.1: Nano S&T

4.1.1: Nanosciences and converging sciences • Converging S&T (nano, bio, info, cogni) - SSFRP• Support to outreach and communication in

nanotechnology – CSA• Examining capacity building in nanobiotechnology -

CSA

Draft WP - NMP

Page 10: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.1: Nano S&T

4.1.2: Nanotechnologies & converging technologies• Pilot lines to introduce nanotech-based processes

into the value chain of existing industries – LSIP• Nanotechnology for water treatment – (Joint Call with

Theme Environment) - SSFRP• Development of technologies for the controlled

combustion of nano-particles - SSFRP• Study about best practices for IPR… - CSA

Draft WP – NMP

Page 11: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.1: Nano S&T

4.1.3: Health, Safety and Environment Impacts • Validation, adaptation and/or development of risk

assessment methodology for engineered nanoparticles - LSIP

• Impact of engineered nanoparticles on health and the environment – SSFRP

Draft WP - NMP

Page 12: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.2: Materials

4.2.1: Mastering nano-scale complexity in materials

4.2.2: Knowledge-based smart materials with tailored properties

4.2.3: Novel biomaterials and bioinspired materials

4.2.4: Advances in chemical technologies and materials processing

4.2.5: Using engineering to develop high performance materials

4.2.6: Coordinated activities and Int. Cooperation

Draft WP - NMP

Page 13: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.2: Materials

4.2.1: Mastering nano-scale complexity in materials• Nanostructured membrane materials - SSFRP• Processing and upscaling of nanostructured

materials - SSFRP

Draft WP - NMP

Page 14: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.2: Materials

4.2.2: Knowledge-based smart materials with tailored properties• Compound semiconductors for electronics and

photonics - LSIP• Nanostructured metamaterials - SSFRP

Draft WP - NMP

Page 15: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.2: Materials

4.2.3: Novel biomaterials and bioinspired materials• Advanced implants and bioactive materials for

critical organs – SSFRP

Draft WP - NMP

Page 16: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.2: Materials

4.2.4 Advances in chemical technologies and materials processing• Inorganic-Organic Hybrid Materials - LSIP• Radical advances in the processing of

multifunctional films and tapes - SSFRP

Draft WP - NMP

Page 17: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.2: Materials

4.2.5 Using engineering to develop high performance knowledge-based materials• Functionally graded materials for improved

mechanical performance - SSFRP• Modelling of interfaces for high performance

materials design - SSFRP

Draft WP - NMP

Page 18: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.2: Materials

4.2.6 Coordinated activities and international cooperation• Materials for energy applications (Joint Call

with Theme 5 / Energy) - SSFRP• Computation al materials science

(Coordinated call with India) – SSFRP• Coordinated actions with Materials researchers

in major world regions – CSA• ERA-NET+ on Materials Research

Draft WP - NMP

Page 19: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.3: New Production

4.3.1: Development and validation of new industrial models and strategies

4.3.2: Adaptive production systems4.3.3: Networked production4.3.4: Rapid transfer and integration of new

technologies into the design and operation of manufacturing processes

4.3.5: Exploitation of the convergence of technologies

Draft WP - NMP

Page 20: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.3: New Production

4.3.1: Development and validation of new industrial models and strategies

• Transformation strategies for SMEs in turbulent global market environments – SME-TP

Draft WP - NMP

Page 21: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.3: New Production

4.3.2 Adaptive production systems • Implementation of process intensification

strategies in industrial scale - LSIP• Self learning production systems - SSFRP • Support for inter-regional manufacturing

communities following IMS strategy update - CSA

Draft WP - NMP

Page 22: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.3: New Production

4.3.3 Networked production • Supply chain integration and real time decision

making in non-hierarchical manufacturing networks - SSFRP

Draft WP - NMP

Page 23: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.3: New Production

4.3.4 Rapid transfer and integration of new technologies into the design and operation of manufacturing processes

• Rapid design and virtual prototyping of factories - LSIP

• Industrialisation through new integrated construction processes - LSIP

Draft WP - NMP

Page 24: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.3: New Production

4.3.5: Exploitation of the convergence of technologies

• Volume production process chains for high throughput micro-manufacturing – SME-TP

Draft WP - NMP

Page 25: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.4: Integration

• Development of nanotechnology-based systems for diagnosis and/or therapy for diabetes, musculo-skeletal or inflammatory diseases - LSIP

• Catalysts and sustainable processes to produce liquid fuels from coal and natural gas - LSIP

• Nanotechnology-enabled applications for integrated, cost-effective volume production– LSIP

• Expanding the limits of advanced materials processing applications through a new generation of high brilliance lasers – LSIP

• Innovative concepts and processes for strategic mineral supply and for new high added value mineral-based products - LSIP

Draft WP - NMP

Page 26: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.4: Integration

• Sustainable new products and markets through bio-production of green forest-based chemicals and materials – LSIP

• Integration of new technologies and materials for differentiated consumer-centred product capability – SME-TP

• Smart materials for applications in the sectors of construction and of machinery and production equipment – SME-TP

• Reducing the risk of injury in complex systems through advanced personal protective equipment – SME-TP

Draft WP - NMP

Page 27: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Activity 4.4: Integration

• Organisation of events related to the Presidencies of the EU - CSA

• NCP transnational activities - CSA• Horizontal activities responding to emerging and policy

needs in the context of ERA - CSA• ERA-NET on Nanomedicine• ERA-NET on trans-national cooperation for new

innovative products in the in the forest based value chains

• ERA-NET on implementing micro- and nanomanufacturing technologies with Member States industry

Draft WP - NMP

Page 28: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Tentative Deadlines of the Calls

Collaborative projects

• Closure date of First Stage: 06 MAR 08

10 page proposal: S&T content + expected impact

2 pages: consortium+estimated financial resources

• Indicative closure for Second Stage

SSFRP on 26 AUG 08

LSIP, SME-TP on 23 SEP 08

Coord. call with India / CSA 24 APR – one stage

Joint Call with Environment 19 FEB – one stage

Joint Call with Energy 5 FEB / 6 MAY

Draft WP - NMP

Page 29: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

Evaluation criteria and thresholds

S&T quality 4/5

Implementation 3/5

Impact 3/5

Overall 12/15

• Implementation is not considered in stage 1 and the overall threshold is 8

• For LSIP, in stage 2 the threshold for Impact is 4

Draft WP - NMP

Page 30: NMP in FP7 – Bucharest, 05 October 2007 José-Lorenzo Vallés Value-added materials DG Research European Commission Towards the second NMP calls.

NMP in FP7 – Bucharest, 05 October 2007

FP7 InformationFP7 Information

• EU research:

http://europa.eu.int/comm/research • Research programmes and projects:

http://cordis.europa.eu/fp7/home_en.html

Thank youThank you ! !