Challenges Associated with Developing Brownfields in New Jersey Municipalities Joseph Hochreiter, CGWP Principal Scientist, Senior Environmental Consulting, LLC Coordinator, Perth Amboy Waterfront BDA New Jersey Future Redevelopment Forum 2016 “Navigating Brownfields : Creative Solutions for Problem Sites” Successful Examples from Northvale (Bergen County) and Perth Amboy
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Challenges Associated with Developing Brownfields in New Jersey Municipalities
Joseph Hochreiter, CGWP Principal Scientist, Senior Environmental Consulting, LLC
Coordinator, Perth Amboy Waterfront BDA
New Jersey Future Redevelopment Forum 2016“Navigating Brownfields : Creative Solutions for Problem Sites”
Successful Examples from Northvale (Bergen County) and Perth Amboy
Basic Concepts• Municipalities by statute receive immunity from cleanup costs for
properties on which they foreclose for non-payment of taxes.• Such immunity DOES NOT exist for properties that municipalities own
and operate (i.e., DPW Yard) or for acquired properties. • LSRP is your gateway for Site Remediation compliance, so select
carefully and keep engaged through the remediation of most difficult properties.
• Brownfields Development Area (BDA) designation gives municipalities more control over developer selection, priority access to HDSRF resources, and OBR consultation.
• For municipally owned sites, should municipality control remediation, or should it be turned over to a developer? Pros and Cons…
• When HDSRF is viable, it is effective in stimulating activity at stubborn, abandoned sites. Prior viability has been an issue.
New Jersey Future Redevelopment Forum 2016“Navigating Brownfields : Creative Solutions for Problem Sites”
Small-Town Remediation
New Jersey Future Redevelopment Forum 2016“Navigating Brownfields : Creative Solutions for Problem Sites”
Small-Town RemediationTect-Danzig Site:• 2.25-acre site in middle of town• Tect, Inc. started in 1957 as distributor and manufacturer of chlorinated
solvents• Business closed around 1970 with on-site burial of up to 500 drums of
solvent and waste in a large excavated pit• SBA foreclosed on mortgage and site transferred to Danzig Holdings, Inc.• Danzig Holdings operated until late 1990’s, then abandoned site. Borough
foreclosed and conducted PAR/SI.• SI uncovered drums – work immediately stopped and new work plan
developed• From 2000 - 2010, Borough used over $3 million of HDSRF to remove source
New Jersey Future Redevelopment Forum 2016“Navigating Brownfields : Creative Solutions for Problem Sites”
Small-Town RemediationTect-Danzig Site (continued):• In 2008, bifurcated site into publicly-funded GW operable unit and
borough-controlled soil operable unit. A rare site where GW is under State control, while soil is under municipal/LSRP control.
• Borough retained LSRP in 2014 after developer signed 100-year lease (Borough needed to own site for HDSRF support) and implemented soil remedy (VI mitigation; hot-spot SVE; and capping).
• GW impact so severe that remediation will take decades, or longer.• In 2000, USEPA Superfund sought control. Municipality opted to take
control under HDSRF. In 15-years, soil was remediated and site redeveloped. How long would USEPA have taken?
• Ironically, USEPA may return to remediate GW operable unit (interstate plume)
New Jersey Future Redevelopment Forum 2016“Navigating Brownfields : Creative Solutions for Problem Sites”
Small-Town Remediation
New Jersey Future Redevelopment Forum 2016“Navigating Brownfields : Creative Solutions for Problem Sites”
New Jersey Future Redevelopment Forum 2016“Navigating Brownfields : Creative Solutions for Problem Sites”
Large-Scale BDA RemediationPerth Amboy ePort Site:• Focus 2000 designated waterfront development plans under NJ
Redevelopment Law; Redevelopment Agency created – PARA; Executive Director retained; PARA designated redevelopers for each site within redevelopment area.
• Initial site that was used to create BDA in 2007; 105-acre site used for smelting-residuals disposal, lead-paint production, and various other industrial uses dating back to 1880s. BDA twice expanded (2009; 2014) to include additional waterfront areas.
• Mid-2000s PA/SI/RI of three component parts of ePort site. $3.5 million investigation led to RAWP in 2008 (revised May 3, 2012) and implemented by designated developer in 2013 – 2015 (2 years).
• Remediation cost over $30 Million; Over 1 million SF of light industrial/warehouse being built presently. PILOT to City and jobs.
New Jersey Future Redevelopment Forum 2016“Navigating Brownfields : Creative Solutions for Problem Sites”
Former Dutch Boy Buildings
New Jersey Future Redevelopment Forum 2016“Navigating Brownfields : Creative Solutions for Problem Sites”
ePort 100-acre site, post demolition
New Jersey Future Redevelopment Forum 2016“Navigating Brownfields : Creative Solutions for Problem Sites”
Wrap Up• ePort Perth Amboy is what we typically think of as
Brownfields, however so is Tect, Inc. • Which site posed greatest risk to HH&E?• PA/SI/RI defines the COCs, extent of contamination; RAWP
describes remedial action to be taken.• PA is ‘base of pyramid’ - $ spent here pay huge dividends
later; ASTM AAI Phase 1 is NOT sufficient to initiate NJ ‘Tech Reg’ compliance.
• ‘Field Engineering’ sometimes is best approach for defining and implementing remedy, however financial success of project is based upon how well you know what is on the site.
New Jersey Future Redevelopment Forum 2016“Navigating Brownfields : Creative Solutions for Problem Sites”