Tok yo Metr opolitan Government Cl i mate Ch an ge Measures 东京都政府 气候 变化措施 Tokyo Cap and T r ade Program 东京总量管制与排放交易制度 Yuko Nishida Bureau of Environment 环境局
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 1/20
Tokyo Metropolitan GovernmentClimate Change Measures
Tokyo Cap and Trade Program
Yuko Nishida
Bureau of Environment
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 2/20
Tokyo’s GHG Emission Reduction Target
25% below 2000 levels by 2020
2020 2000 25%
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 3/20
Tokyo Carbon Dioxide Footprint
Total CO 2 Emissions: 65 million tons (FY2007)6,500 2007
Residential
27%
Trans-Portation
22%
Commercial &Industrial
49%
Large CO 2 emittingfacilities
CO 2
approx.40%
approx.60%
Small to medium sized CO 2 emittingfacilities
CO 2
TOKYOMETROPOLITANGOVERNMENT
3
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 4/20
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 5/20
Program Development
2002 2005 2008 2010
Mandatory reporting program(Voluntary reductions program)
--require to report yearly emissions
----require to establish reduction plansfor 3yr-terms
----advise energy saving measures--
■ 2008 Enacted2008
● 2005 Revised2005
TOKYOMETROPOLITANGOVERNMENT
● 2002 voluntaryprogram started2002
■ 2010 mandatoryprogram started2010
MandatoryProgram: Tokyo
Cap-and-TradeProgram
5
Tokyo Cap-and-Trade
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 6/20
2007~8 Consultation Process2007 2008
June 2008 Unanimous approvalin the Metropolitan Assembly
2008 6
Public comments
Stakeholder
Meetings
TOKYOMETROPOLITANGOVERNMENT
Introduction
6
Tokyo Cap-and-Trade
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 7/20
The world’s first urban cap and trade
program to cover office buildings
40% of commercial and industrial
sectors’ emissions 40%
1,300 facili ties 1,3001,100 Commercial & institutional buildings1,100
200 Industrial facilities 200
TOKYOMETROPOLITANGOVERNMENT
Target: Facilities with annual energy consumption of1,500 kl or more (crude oil equivalent)
1,500 kl
Tokyo Cap-and-Trade
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 8/20
Current estimation. Fix by the end of the 1 st compliance period1*
1 st compliance period2010-2014
12010 -2014
2nd compliance period2015-2019
22015 - 2019
*
Base-year Emission
6% reduction(5 year average)
6%5
17% reduction(5 year average)
17%5
Cap Setting
8
Tokyo Cap-and-Trade
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 9/20
Based on historic emissionsBase-yr emission (1-Compliance factor) 5yrs
1 – 5
Allowance46,000 = 9,200 × 5yrs
10,000×8%
Total 5 yrs Emissions5Method 1 Self reduction
Method 2: Emission t rading12
reduction
2010 ’11 ’12 ’13 ’14 2010 ’11 ’12 ’13 ’14
Example
● Base year emissions: 10,000 tons 10,000● Compliance factor for 1 st compliance period 8% reduction
1 8%
Penalty fornon- compliance
Ordered to reduce 1.3 times the shortfall1.3
If order is violated:Monetary fine, surcharge, publi c announcement,etc.
Allowance Allocation
9
Tokyo Cap-and-Trade
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 10/20
Trading & CreditsEmissions trading Trading Amount:
Reduction exceeding the obligationEmission reduction exceeding the yearly obligation is allowed to betraded from the 2nd year.
Offsets
--Credits
1. Emission reductions from small and midsize
facilities within the Tokyo area* Emission reduction by energy-saving measures*
2. Renewable Energy Certificates* Solar (heat and light) energy, wind energy, etc.in Japan*
3. Emission reductions outside the Tokyo area* Sellers will be assumed to be covered under the
Tokyo Cap-and-Trade Program, and reduction exceeding thereduction obligation would be counted as offset credit
*
* Can only buy up to 1/3 of the reduction obligation* 1/3
10
Tokyo Cap-and-Trade
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 11/20
Key PointsUrban cap and trade program is asextremely effective to lower CO 2 emissionsfrom new and existing buildings in cities
Trading is crucial for an entire scheme
Careful design of a local carbon market isimportant to facilitate retrofit programs inTokyo
TOKYOMETROPOLITANGOVERNMENT 11
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 12/20
Key barriers and challenges
Failure story in 20052005Tried introducing mandatory emission reductionsprogram without trading
--lack of sufficient data----lack of knowledge (esp.building side)----insufficient communications with stakeholders,--
Lack of support from national level policyTOKYOMETROPOLITANGOVERNMENT 12
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 13/20
ExpansionTokyo’s Proposal on Nationwide Introductionof cap and trade program (Sept.2009)
2009 9
--Two-tier (national level and
regional level) cap and tradeprograms covers entire Japan
Expansion to the GreaterTokyo Region
TOKYOMETROPOLITANGOVERNMENT 13
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 14/20
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 15/20
Green Building Era in Tokyo
High performance buildings in progress 1
1● Energy efficiency, Low energy:
LED lights, Energy efficient air conditioning,Double glazed windows, Natural lightingNatural ventilation
LED
(Eco-Office Project, SHIMIZU CORPORATION)
● Renewable energy use:PV panels in system walls
15
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 16/20
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 17/20
Green Building Era in Tokyo
Retrofit Projects
Installing highly efficient air conditioning & lighting system.Improve district heating system …
(Mitsui Sumitomo Marine and Fire Insurance Co.Ltd.)
17
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 18/20
Use 100% renewable energy for the electricity consumptionin the high-rise energy efficient building
100%
(New Marunouchi Building, Mitsubishi Estate Co. Ltd.)
(Futamata Wind Power Development Corporation,
Aomori Prefecture)
Futamata
Progressive Actions
A New Scheme of Renewable Energy Use
18
ro ec s n sma an m s e ngs an
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 19/20
ro ec s n sma an m s ze u ngs ancorporations
Various improvement efforts for
energy efficiency are activelytaken
Install energy effic iency lights,reflecting devices, and managementsystems
Install high efficiency boilers
Thermal insulatingmaterials to cover
heat sources and bulbs
FY
27383
56
2
3
4
5
6
2 8 2 9 2
Energy assessment programfor small businesses are grown
8/12/2019 Nishida TokyoCapandTradeProgram ERIMarketMechanismsWorkshop Beijing 2011-05-25
http://slidepdf.com/reader/full/nishida-tokyocapandtradeprogram-erimarketmechanismsworkshop-beijing-2011-05-25 20/20
Tokyo Climate Change Strategy
http://www.kankyo.metro.tokyo.jp/en/climate/index.htmlContact us: [email protected]
tokyoets@kankyo metro tokyo jp